| Single 18 foot door (instead of single 16 foot door) | $700.00 | |
| Pull down stairs to attic over garage; room over garage trusses, approx 8x14 floored with 3/4 inch OSB; light; | $1,150.00 | |
| Final Deck Configuration (6 feet deep, to corner of porch) | $5,230.00 | |
| Run four inch radon pipe up through roof and cap it | $550.00 | |
| Digging hole for propane tank (Buyer will purchase tank, Blossman will set tank) | $400.00 | |
| Twin pocket doors centered on future office wall in basement (instead of barn doors) | $500.00 | |
| Adding 2ft x 6ft to right end of deck (March 15) | $440.00 | |
| Increase Kitchen Window from 3 ft to 5 ft. | $380.00 | |
| Stairs will be carpet covered pine treads as per standard spec | $0.00 | |
| Allowance for sliding door(s) to deck and sliding door to porch | $6,000.00 | |
| Add 3rd Window to the northside of great room | $450.00 | |
| Credit for patio door to porch | $-450.00 | |
| Increase Arched Window master bedroom | $280.00 | |
| Cathedral ceiling in master bath, move window higher | $600.00 | |
| Windows and sliders on back (east) of home and north of home - no grills | $0.00 | |
| Windows on arrival and south side of home - with grills | $0.00 | |
| Lam beam to remove post at bottom of stairs (as per plans - wall will be built where wall is illustrated, pickets and newel post where no wall is illustrated) | $800.00 | |
| $1400 shower allowance per original contract | $0.00 | |
| $500 allowance for master bathroom tub (includes faucet) | $0.00 | |
| Credit for removing two windows in living room | $-800.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 1 | $0.00 | |
| Extend radon pipe through roof | $250.00 | |
| Additional 3030 DH window in basement office | $450.00 | |
| Cost of reversing direction of basement tub/shower | $100.00 | |
| Credit for standard water heater - buyer to buy and pay for tankless water heater | $-450.00 | |
| Gas piping to gas range | $185.00 | |
| Builder to install bracing/backing for grab bars on all tubs and showers (buyer to select grab bars from Inner Finishes and pay for grab bars and installation) | $0.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 2 | $0.00 | |
| Passage way under stairs from family room to hallway with stair stringer partially exposed | $450.00 | |
| 2 foot 8 inch door with lock in safe room in basement bathroom | $150.00 | |
| Buyer may change door swing direction at electrical walk through | $0.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 3 | $0.00 | |
| Additional Deposit of $10,000 | $-10,000.00 | |
| Additional Deposit of $4,806.86 (for fireplace) | $-4,806.86 | |
| Upgrading to biscuit color for one garden tub and two tub/showers | $200.00 | |
| Recessed Can lights (upgrade cost over the cost of snap lights - includes credit for snap lights) | $1,445.00 | |
| Brick accent on 6 windows- 5 upstairs/1 in basement ($95 each) and garage door ($150) | $720.00 | |
| Framing Changes to 2nd Bedroom closet and 2nd bathroom | $100.00 | |
| Arch/cubby at foyer | $240.00 | |
| Ferguson Appliance Upgrade Cost | $10,788.21 | |
| CREDIT- Standard Stainless Steel Appliances | $-2,300.00 | |
| Appliance install cost (original quote) | $500.00 | |
| Set and install Purchasers Tank- does not include gas line | $300.00 | |
| Garden tub- cost over $500 allowance (cost for deckmount faucet not yet determined) | $100.00 | |
| Original quote for fireplace | $4,806.86 | |
| Cap for fireplace | $250.00 | |
| Additional fireplace cost for roof vent instead of wall vent | $236.93 | |
| Additional Deposit of $10,000 | $-10,000.00 | |
| OSB around fireplace to prepare for rock | $380.00 | |
| Deposit with Change Order 1 | $-6,057.00 | |
| Credit for fireplace allowance | $-3,000.00 | |
| Vent microwave to outside | $450.00 | |
| Credit for change from pocket doors to swing doors on basement office | $-100.00 | |
| Change in house size based on foundation wall change (24x50, 14x20) | $-1,480.00 | |
| Gas piping to fireplace, water heater, furnace and grill (not including pipe from tank to house) | $725.00 | |
| Additional deck expansion to bedroom bump out (8 x 6) | $1,680.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 4 | $0.00 | |
| Shanks plumbing fixture upgrades - costs over standard ($5,791.96 - $2,591.55) not including tub/shower overages | $3,200.41 | |
| Ferguson total plumbing and lighting | $2,929.73 | |
| CREDIT- Standard toilet cost $250 (3) | $-750.00 | |
| CREDIT- pendant lights $25 (2) | $-50.00 | |
| CREDIT- vanity lights $50 (4) | $-200.00 | |
| Plumbing change from single to double sink at vanity | $350.00 | |
| Additional appliance installation cost (Ferguson) | $360.00 | |
| Credit for earlier $200 upgrade for tub and shower color | $-200.00 | |
| Credit for earlier $100 upgrade for garden tub overage | $-100.00 | |
| Additional Deposit of $5,000 | $-5,000.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 5 | $0.00 | |
| Solid door with dead bolt on safe room door (adding deadbolt) | $110.00 | |
| Kitchen upgrade costs ($12K allowance for cabinets, tops, hardware, install) (actual cost of $19,280.92 for cabinets and install but not tops or hardware) | $7,280.92 | |
| Rinnai RU180iP Sensei Super High-Efficiency Tankless Water Heater, 10 GPM (cost plus tax, venting labor) | $1,770.00 | |
| Rockingham Petroleum to provide and set tank | $3,100.00 | |
| Cabinet hardware | $264.19 | |
| Flooring upgrade costs from Eagle Carpet (over standard hardwood and carpet flooring cost) | $8,494.17 | |
| Credit for two standard ceiling fans | $-250.00 | |
| Additional phone line locations | $125.00 | |
| Dimmer for under cabinet lighting | $50.00 | |
| Drywall hung in office (taped, mudded, finished) | $1,400.00 | |
| Motion Activated Exterior Garage Floodlight on southwest corner of garage (price TBD) | $185.00 | |
| Cost for assembling and installing owner supplied fan lights (above credit for flush mount lights) in dining room, family room, owner suite, basement family room, basement office, porch) | $420.00 | |
| Seven Solid Core Doors ($140 each) Five red dots plus basement bedroom and safe room | $980.00 | |
| Larger master bathroom window | $280.00 | |
| Credit for no double doors on basement office | $-250.00 | |
| Expand 3x6 basement patio to 7x8 @ $15/SF | $570.00 | |
| Tile (supplies) from Ital | $3,505.75 | |
| Master bathroom - installation of cement, membrane, shluter, thinset, grout, tile | $3,500.00 | |
| Tile installation on two other bathrooms | $1,600.00 | |
| Credit for standard shower enclosure | $-400.00 | |
| Credit for master bath shower allowance | $-1,400.00 | |
| Credit for standard tile (materials and labor) not used from Eagle Carpet | $-2,696.00 | |
| Additional Deposit of $30,000 | $-30,000.00 | |
| ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 6 | $0.00 | |
| Countertops for kitchens and bathrooms - buyer to pay directly to Ital | $0.00 | |
| Iron balusters | $550.00 | |
| Tile installation for laundry room | $900.00 | |
| Additional handrail on stairs | $125.00 | |
| Electrical upgrades - Labor and materials from Harry | $1,987.50 | |
| Additional cabinetry | $1,044.02 | |
| Credit for difference in final bill ($3502.55) and original bill ($3505.75) for tile | $-3.20 | |
| Bathroom accessories from Shanks | $564.64 | |
| Credit for standard bathroom accessories | $-305.00 | |
| Garbage disposal upgrade | $420.00 | |
| Lowes light order | $1,569.00 | |
| Installation of bath accessories | $165.00 | |
| Installation of grab bars | $87.00 | |
| Closet shelving upgrades | $801.12 | |
| Door hardware upgrades | $98.12 | |
| Shower door upgrade | $1,205.31 | |
| 55 construction changes at $100 per change * | $5,500.00 | |
| Connecting gas range | $105.00 | |
| Mantle installation | $250.00 | |
| Gas regulator upgrade, firing up system | $175.00 | |
| Sanding and staining the stairs to prep for and install custom stair runner (includes change order fee and credit for carpet not used) | $1,280.00 | |
| Credit for fuel bill | $-70.40 | |
| Credit reduced tile bill from Ital | $-601.58 | |
| Credit for standard bathroom sinks (not used) | $-400.00 |