CHANGE ORDER ACCOUNTING
    The Townes at Congers Creek Phase 2  ::  10
Single 18 foot door (instead of single 16 foot door)      $700.00
Pull down stairs to attic over garage; room over garage trusses, approx 8x14 floored with 3/4 inch OSB; light;      $1,150.00
Final Deck Configuration (6 feet deep, to corner of porch)      $5,230.00
Run four inch radon pipe up through roof and cap it      $550.00
Digging hole for propane tank (Buyer will purchase tank, Blossman will set tank)      $400.00
Twin pocket doors centered on future office wall in basement (instead of barn doors)      $500.00
Adding 2ft x 6ft to right end of deck (March 15)      $440.00
Increase Kitchen Window from 3 ft to 5 ft.      $380.00
Stairs will be carpet covered pine treads as per standard spec      $0.00
Allowance for sliding door(s) to deck and sliding door to porch      $6,000.00
Add 3rd Window to the northside of great room      $450.00
Credit for patio door to porch      $-450.00
Increase Arched Window master bedroom      $280.00
Cathedral ceiling in master bath, move window higher      $600.00
Windows and sliders on back (east) of home and north of home - no grills      $0.00
Windows on arrival and south side of home - with grills      $0.00
Lam beam to remove post at bottom of stairs (as per plans - wall will be built where wall is illustrated, pickets and newel post where no wall is illustrated)      $800.00
$1400 shower allowance per original contract      $0.00
$500 allowance for master bathroom tub (includes faucet)      $0.00
Credit for removing two windows in living room      $-800.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 1      $0.00
Extend radon pipe through roof      $250.00
Additional 3030 DH window in basement office      $450.00
Cost of reversing direction of basement tub/shower      $100.00
Credit for standard water heater - buyer to buy and pay for tankless water heater      $-450.00
Gas piping to gas range      $185.00
Builder to install bracing/backing for grab bars on all tubs and showers (buyer to select grab bars from Inner Finishes and pay for grab bars and installation)      $0.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 2      $0.00
Passage way under stairs from family room to hallway with stair stringer partially exposed      $450.00
2 foot 8 inch door with lock in safe room in basement bathroom      $150.00
Buyer may change door swing direction at electrical walk through      $0.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 3      $0.00
Additional Deposit of $10,000      $-10,000.00
Additional Deposit of $4,806.86 (for fireplace)      $-4,806.86
Upgrading to biscuit color for one garden tub and two tub/showers      $200.00
Recessed Can lights (upgrade cost over the cost of snap lights - includes credit for snap lights)      $1,445.00
Brick accent on 6 windows- 5 upstairs/1 in basement ($95 each) and garage door ($150)      $720.00
Framing Changes to 2nd Bedroom closet and 2nd bathroom      $100.00
Arch/cubby at foyer      $240.00
Ferguson Appliance Upgrade Cost      $10,788.21
CREDIT- Standard Stainless Steel Appliances      $-2,300.00
Appliance install cost (original quote)      $500.00
Set and install Purchasers Tank- does not include gas line      $300.00
Garden tub- cost over $500 allowance (cost for deckmount faucet not yet determined)      $100.00
Original quote for fireplace      $4,806.86
Cap for fireplace      $250.00
Additional fireplace cost for roof vent instead of wall vent      $236.93
Additional Deposit of $10,000      $-10,000.00
OSB around fireplace to prepare for rock      $380.00
Deposit with Change Order 1      $-6,057.00
Credit for fireplace allowance      $-3,000.00
Vent microwave to outside      $450.00
Credit for change from pocket doors to swing doors on basement office      $-100.00
Change in house size based on foundation wall change (24x50, 14x20)      $-1,480.00
Gas piping to fireplace, water heater, furnace and grill (not including pipe from tank to house)      $725.00
Additional deck expansion to bedroom bump out (8 x 6)      $1,680.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 4      $0.00
Shanks plumbing fixture upgrades - costs over standard ($5,791.96 - $2,591.55) not including tub/shower overages      $3,200.41
Ferguson total plumbing and lighting      $2,929.73
CREDIT- Standard toilet cost $250 (3)      $-750.00
CREDIT- pendant lights $25 (2)      $-50.00
CREDIT- vanity lights $50 (4)      $-200.00
Plumbing change from single to double sink at vanity      $350.00
Additional appliance installation cost (Ferguson)      $360.00
Credit for earlier $200 upgrade for tub and shower color      $-200.00
Credit for earlier $100 upgrade for garden tub overage      $-100.00
Additional Deposit of $5,000      $-5,000.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 5      $0.00
Solid door with dead bolt on safe room door (adding deadbolt)      $110.00
Kitchen upgrade costs ($12K allowance for cabinets, tops, hardware, install) (actual cost of $19,280.92 for cabinets and install but not tops or hardware)      $7,280.92
Rinnai RU180iP Sensei Super High-Efficiency Tankless Water Heater, 10 GPM (cost plus tax, venting labor)      $1,770.00
Rockingham Petroleum to provide and set tank      $3,100.00
Cabinet hardware      $264.19
Flooring upgrade costs from Eagle Carpet (over standard hardwood and carpet flooring cost)      $8,494.17
Credit for two standard ceiling fans      $-250.00
Additional phone line locations      $125.00
Dimmer for under cabinet lighting      $50.00
Drywall hung in office (taped, mudded, finished)      $1,400.00
Motion Activated Exterior Garage Floodlight on southwest corner of garage (price TBD)      $185.00
Cost for assembling and installing owner supplied fan lights (above credit for flush mount lights) in dining room, family room, owner suite, basement family room, basement office, porch)      $420.00
Seven Solid Core Doors ($140 each) Five red dots plus basement bedroom and safe room      $980.00
Larger master bathroom window      $280.00
Credit for no double doors on basement office      $-250.00
Expand 3x6 basement patio to 7x8 @ $15/SF      $570.00
Tile (supplies) from Ital      $3,505.75
Master bathroom - installation of cement, membrane, shluter, thinset, grout, tile      $3,500.00
Tile installation on two other bathrooms      $1,600.00
Credit for standard shower enclosure      $-400.00
Credit for master bath shower allowance      $-1,400.00
Credit for standard tile (materials and labor) not used from Eagle Carpet      $-2,696.00
Additional Deposit of $30,000      $-30,000.00
ALL ITEMS LISTED ABOVE ARE DOCUMENTED ON CHANGE ORDER 6      $0.00
Countertops for kitchens and bathrooms - buyer to pay directly to Ital      $0.00
Iron balusters      $550.00
Tile installation for laundry room      $900.00
Additional handrail on stairs      $125.00
Electrical upgrades - Labor and materials from Harry      $1,987.50
Additional cabinetry      $1,044.02
Credit for difference in final bill ($3502.55) and original bill ($3505.75) for tile      $-3.20
Bathroom accessories from Shanks      $564.64
Credit for standard bathroom accessories      $-305.00
Garbage disposal upgrade      $420.00
Lowes light order      $1,569.00
Installation of bath accessories      $165.00
Installation of grab bars      $87.00
Closet shelving upgrades      $801.12
Door hardware upgrades      $98.12
Shower door upgrade      $1,205.31
55 construction changes at $100 per change *      $5,500.00
Connecting gas range      $105.00
Mantle installation      $250.00
Gas regulator upgrade, firing up system      $175.00
Sanding and staining the stairs to prep for and install custom stair runner (includes change order fee and credit for carpet not used)      $1,280.00
Credit for fuel bill      $-70.40
Credit reduced tile bill from Ital      $-601.58
Credit for standard bathroom sinks (not used)      $-400.00
 
 
Total Cost/Credit:  $17,168.84