CHANGE ORDER ACCOUNTING
    The Townes at Congers Creek Phase 2  ::  15
Add window with half round in kitchen      $250.00
CREDIT--- for 10x14 porch      $-700.00
Kitchen Upgrades to be paid directly to CK      $0.00
(2) extra windows in basement      $1,000.00
CREDIT for basement window shown on plans at bottom of stairs      $-250.00
Built up seat in master shower      $200.00
Border accent tile      $205.00
Tan stucco and same exterior colors and materials as lot 31      $0.00
Additional insulation in ceiling      $200.00
Additional insulation in walls      $200.00
Additional tile up to ceiling in mater bathroom      $300.00
Diverter and valve for master shower      $208.00
Additional drywall cost in basement      $1,400.00
Ceramic tile in powder bathroom and entryway off basement slider      $400.00
Carpet in added basement room      $680.00
Glass Shower Partition      $1,050.00
CREDIT- difference between 3/8      $-847.87
One Additional paint color      $100.00
PAINT- Master bedroom and bathroom - Foggy Mist ( same as model master)      $0.00
PAINT- "Clean Canvas" HDC-AC-11 ( Home Depot color) small bedroom and upstairs hall bathroom, down stairwell and basement family room-      $0.00
NO PAINT IN DOWNSTAIRS BATHROOM AND BEDROOM      $0.00
Paint- Wish- Everywhere else not already listed with another color      $0.00
Garage door painted khaki to match posts on deck      $0.00
CREDIT- foyer light      $-86.00
Toilet for basement powder bath      $118.48
 
 
Total Cost/Credit:  $4,427.61