CHANGE ORDER ACCOUNTING
    The Townes at Congers Creek Phase 2  ::  5
Engineered Hardwood in Living, Dining, Hallway, Master Bedroom, Closets      $0.00
Ceramic Tile in Kitchen, Breakfast Nook (instead of hardwood laminate)      $0.00
Hardwood Treads (instead of carpet)      $0.00
Engineered Hardwood in Upstairs Hallway, Bedrooms, Closets (instead of carpet)      $0.00
Engineered Hardwood in Bonus Room Over Garage - and closet (instead of carpet)      $0.00
Add Window above toilet to master bathroom      $400.00
Shelving Upgrades      $375.75
Painting 6 additional closets ($40.00 each)      $240.00
Front door color sherwin Williams red rock      $0.00
PAINT-Colors for all walls-SW-7643 Pussywillow      $0.00
PAINT-TT17Gingery SW 6363 Bedroom up above living room/family room nearest to back patio upstairs to the left if you are going upstairs closet to Peach Grove Road.      $0.00
 
 
Total Cost/Credit:  $1,015.75