CODED LOCKBOX 6767 |
|
|
-- |
-- |
Install screens for windows and patio door |
JB |
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
Mon |
Oct 7 |
Closing (1)
|
|
|
Tue |
Oct 8 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
Brick - Charleston |
|
|
-- |
-- |
Charleston- Bone Vinyl- GREEN DOOR |
|
|
-- |
-- |
Tub liners |
|
|
-- |
-- |
Door into basement living room correct? |
|
|
-- |
-- |
Bathroom cabinets |
|
|
-- |
-- |
Curb and gutter |
Poured 7/2 |
|
-- |
-- |
Cover basement carpet |
|
|
-- |
-- |
House numbers |
|
|
-- |
-- |
Cabinet issues? Pieces unassembled. 6/19 |
Still many pieces laying around/6/26 |
|
-- |
-- |
MB lights too high? Or maybe upside down? 6/19 |
|
|
-- |
-- |
Hall lights upside down? |
|
|
-- |
-- |
Drywall repair basement back room |
|
|
-- |
-- |
Basement bathroom countertop |
7/10 |
|
-- |
-- |
Basement vanity light needs to be turned around |
|
|
-- |
-- |
All vanity lights need to be turned so light faces countertop |
|
|
-- |
-- |
Fridge backordered until 7/11 |
Not here 7/17 |
|
-- |
-- |
Missing upper hall bath vanity light 7/2 |
Needs to be installed |
|
-- |
-- |
Missing electrical cover in powder bath and in kitchen backsplash |
|
|
-- |
-- |
Finish installing pendant light globe |
Tom will ask electrician if we need to order another |
|
-- |
-- |
Finish installing lower corner cabinet door |
Kyle Monday 7/6 |
|
-- |
-- |
Finish installing filler in kitchen and also upper 12 inch cabinet to the left of the sink |
Kyle Monday 7/6 |
|
-- |
-- |
Install glass in upper cabinets |
Kyle Monday 7/6 |
|
-- |
-- |
Missing receptacle covers one in kitchen backsplash one in powder bath |
|
|
-- |
-- |
Install dining chandelier |
Electrician |
|
-- |
-- |
Floor pops upstairs outside of second and third bedroom |
Tom/JB |
|
-- |
-- |
Adjust upstairs closet doors |
JB |
|
-- |
-- |
Missing outlet cover in upstairs bedroom |
JB |
|
-- |
-- |
Install vanity light upstairs hall bathroom |
Electrician |
|
-- |
-- |
Finish closet installation upstairs master closet |
Ron- Monday 7/8 |
|
-- |
-- |
Missing receptacle cover upstairs master bathroom |
|
|
-- |
-- |
Install hardware bathroom cabinets |
Kyle- Monday 7/8 |
|
-- |
-- |
Covers Needed in basement Bonus room over water pipe and wires |
|
|
-- |
-- |
Basement bath culture marble needed |
7/11 |
|
-- |
-- |
Basement bath vanity light upside down |
Electrician |
|
-- |
-- |
Caulk in front of all tubs/showers |
JB |
|
-- |
-- |
Fix drywall hole in basement family room. Perhaps a plumbing issue? |
Needs painting |
|
-- |
-- |
Caulk toilet and pedestal sink |
JB |
|
-- |
-- |
Put insulation back up in basement |
JB |
|
-- |
-- |
PVC board under patio door |
JB |
|
-- |
-- |
Install doorbell |
|
|
-- |
-- |
Fill holes at HVAC and hot water heater |
JB |
|
-- |
-- |
Towel ring needed in basement bathroom |
Ron- Monday 7/8 |
|
-- |
-- |
The cover on low-voltage box and need access panel for water turn off |
Tom/JB |
|
-- |
-- |
Drain spout needed |
Tom/JB |
|
-- |
-- |
Plumbing in basement needed 7/10 |
|
|
-- |
-- |
Missing outlet cover in pantry |
|
|
-- |
-- |
Patio receptacle issue (see pic) |
And outdoor patio! |
|
-- |
-- |
|
|
|
-- |
-- |
Hardware on mb vanity needed 7/17 |
All vanities need it |
|
-- |
-- |
Scratches on fridge 7/20 |
|
|
-- |
-- |
Additional touch up paint |
July 25 |
|
-- |
-- |
Master bath adjustment to the door |
|
|
-- |
-- |
Install refrigerator |
|
|
-- |
-- |
Stairs closet door adjustment |
|
|
-- |
-- |
Cabinet hardware upstairs bathroom to be installed |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Two scratches and upstairs bathtub |
|
|
-- |
-- |
Install basement faucet vanity |
|
|
-- |
-- |
Address drywall or paint issue in the ceiling in bonus room |
|
|
-- |
-- |
Final paint touch up |
|
|
-- |
-- |
Final cleaning |
|
|
-- |
-- |
Lightbulbs needed powder bath and dining chandelier and downstairs vanity |
|
|
-- |
-- |
Touch up paint on the ceiling in the hallway leading to kitchen |
|
|
-- |
-- |
Re-finish and paint drywall ceiling in basement bonus room |
Need to sand and paint back room |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
Soon as of Apr 1 |
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
Two weeks out as of June 14 |
|
-- |
-- |
Driveway (0)
|
Patio formed 6/26 |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
July 22 |
|
-- |
-- |
HVAC Rough In (4)
|
Started as of Mar 14 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Wed, Mar 27 |
|
-- |
-- |
Plumbing Rough In (4)
|
Started 3/23 |
|
-- |
-- |
Electric Rough In (4)
|
Started as of Mar 14 |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
Tue, Apr 2 |
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
Starting Apr 4 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
Can be sanded Tuesday 23 |
|
-- |
-- |
Paint 1 (1)
|
Ready for paint on Apr 24 |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
House numbers all correct 6/19 |
|
-- |
-- |
Cabinet Installation (2)
|
Partially complete 6/1 |
|
-- |
-- |
Granite Installation (1)
|
Whisper White - June 20 |
|
-- |
-- |
Interior Trim - Install (3)
|
All done except crown |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Started as of May 13 |
|
-- |
-- |
Paint 2 (3)
|
|
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
Fixtures arrive June 8 |
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
Started 5/29 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
Hopefully by Tuesday 7/9 |
|
-- |
-- |
Electric Trim Out (3)
|
50% completed |
|
-- |
-- |
HVAC Trim Out (1)
|
Need pad or patio |
|
-- |
-- |
Plumbing Trim Out (2)
|
All but basement bath/master shower door week of 7/1 |
|
-- |
-- |
Install Appliances (0)
|
Hopefully by Tuesday 7/9 |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
Being installed 6/5 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Tell Chris Dunkel when to send appraiser; |
|
-- |
-- |
Inspection (Final Building) (2)
|
Mon, July 22 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
To be completed after water meter set- |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
|
|
-- |
-- |
Payment for Upgrades (0)
|
$7050 - Communicated to buyer and agent will bring check to closing |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
West View Title - Brittany |
|