Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Order Appliances (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Mailbox (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Ceiling Fans (0)      
Wed    May 7      Blower Door Test (1)      
Thu    May 8      Inspection (Final HVAC) (1)      
Fri    May 9      Inspection (Final Plumbing) (1)      
Mon    May 12      Inspection (Final Electric) (1)      
Tue    May 13      Stain Hardwood Stairs (1)      
Wed    May 14      Request Trash Tote From POA Manager (0)      
--   --   Want electrical walk through
--   --   Send Mirror Sizes to buyer and credit amount On site 9/4
--   --   Savannah brick, country beige vinyl, green front door
--   --   4 snap lights in living room on dimmer Needs dimmer switch
--   --   Electrical outlet in patio for future hot tub See pic. I think is in 6/26
--   --   By requesting two parking spaces in driveway if possible?
--   --   loghting and plubing to be obtained by Ferguson- see selections sheet.
--   --   Cut brick above door (pic)
--   --   Realtor says patio was not expanded?
--   --   Wash brick
--   --   Cabinet hardware needed
--   --   Do not finish bonus room in the garage. Will not get carpet or paint.
--   --   Missing kitchen island granite 9/4
--   --   Courtney please take pictures of the mastr shower door once installed and email/text to Kate so she can send them to the T62 buyer!
--   --  
--   --   Small holes in front brick mortar
--   --   Dining chandelier credit? On counter but may be providing their own?
--   --   CODED LOCKBOX 4848
--   --  
--   --   Need sheet vinyl in closet under stairs
--   --   Clean out garage
--   --   No dimmer for LR lights per BCP
--   --   Upgraded pedastal sink In garage 9/21
--   --   Install sconce light globes
--   --   Sconce upside down in stairway from basement to main level. Install correct light
--   --   Extend front gutter
--   --   Is house getting backsplash before closing?
--   --   Hand railings
--   --   Rear door dead bolt not lined up Weather stripping
--   --   Hang mirrors
--   --   HVAC covers Plus return at stairs
--   --  
--   --   Returen air cover
--   --   Stain steps
--   --   Paint 2 back bonus room
--   --   Basement bath light crooked Tom
--   --   Touch up paint throughout 10/9 seems to be starting
--   --   Handrails on stairs
--   --  
--   --   Molding issue steps to main level
--   --   Molding issue steps to main level
--   --  
--   --   Kitchen cabinet missing trim
--   --   Set fridge (not against wall)
--   --   Touch up paint MB closet
--   --   Touch up paint MB closet Working on it 10/16
--   --  
--   --   MB closet light needs replaced w correct snap light
--   --  
--   --  
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       Starting April 1
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)       May 24
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *        Patio done 7/31
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Working on it 6/1
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)       In progress 6/5 (most progress in this townhouse)
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        In process 7/31
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process 7/31
-- -- Paint 1 (1)       Tues, Aug 13
-- -- Garage Door (0) *       
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        August 9
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        In process 8/17
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Done- all tile 12x12
-- -- Paint 2 (3)       No color 9/21
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)       On site 9/7
-- -- Shoe Moulding (0)       In process 9/25
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        In process 9/21. Need shelving.
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3)       In process 9/28
-- -- HVAC Trim Out (1)       HVAC is set
-- -- Plumbing Trim Out (2)       Done. Extra toilet in basement.
-- -- Install Appliances (0) *        Sep 20
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       Wed, Oct 16 at 9:00 AM
-- -- Buyer Walk Through (1)       Tue, Oct 15 at 4:30 PM
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)       Wed, Oct 16 at 9:00 AM @ West View Title
-- -- Remove Coded Lockbox (0)