Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
Want electrical walk through |
|
|
-- |
-- |
Send Mirror Sizes to buyer and credit amount |
On site 9/4 |
|
-- |
-- |
Savannah brick, country beige vinyl, green front door |
|
|
-- |
-- |
4 snap lights in living room on dimmer |
Needs dimmer switch |
|
-- |
-- |
Electrical outlet in patio for future hot tub |
See pic. I think is in 6/26 |
|
-- |
-- |
By requesting two parking spaces in driveway if possible? |
|
|
-- |
-- |
loghting and plubing to be obtained by Ferguson- see selections sheet. |
|
|
-- |
-- |
Cut brick above door (pic) |
|
|
-- |
-- |
Realtor says patio was not expanded? |
|
|
-- |
-- |
Wash brick |
|
|
-- |
-- |
Cabinet hardware needed |
|
|
-- |
-- |
Do not finish bonus room in the garage. Will not get carpet or paint. |
|
|
-- |
-- |
Missing kitchen island granite 9/4 |
|
|
-- |
-- |
Courtney please take pictures of the mastr shower door once installed and email/text to Kate so she can send them to the T62 buyer! |
|
|
-- |
-- |
|
|
|
-- |
-- |
Small holes in front brick mortar |
|
|
-- |
-- |
Dining chandelier credit? On counter but may be providing their own? |
|
|
-- |
-- |
CODED LOCKBOX 4848 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Need sheet vinyl in closet under stairs |
|
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
No dimmer for LR lights per BCP |
|
|
-- |
-- |
Upgraded pedastal sink |
In garage 9/21 |
|
-- |
-- |
Install sconce light globes |
|
|
-- |
-- |
Sconce upside down in stairway from basement to main level. |
Install correct light |
|
-- |
-- |
Extend front gutter |
|
|
-- |
-- |
Is house getting backsplash before closing? |
|
|
-- |
-- |
Hand railings |
|
|
-- |
-- |
Rear door dead bolt not lined up |
Weather stripping |
|
-- |
-- |
Hang mirrors |
|
|
-- |
-- |
HVAC covers |
Plus return at stairs |
|
-- |
-- |
|
|
|
-- |
-- |
Returen air cover |
|
|
-- |
-- |
Stain steps |
|
|
-- |
-- |
Paint 2 back bonus room |
|
|
-- |
-- |
Basement bath light crooked |
Tom |
|
-- |
-- |
Touch up paint throughout |
10/9 seems to be starting |
|
-- |
-- |
Handrails on stairs |
|
|
-- |
-- |
|
|
|
-- |
-- |
Molding issue steps to main level |
|
|
-- |
-- |
Molding issue steps to main level |
|
|
-- |
-- |
|
|
|
-- |
-- |
Kitchen cabinet missing trim |
|
|
-- |
-- |
Set fridge (not against wall) |
|
|
-- |
-- |
Touch up paint MB closet |
|
|
-- |
-- |
Touch up paint MB closet |
Working on it 10/16 |
|
-- |
-- |
|
|
|
-- |
-- |
MB closet light needs replaced w correct snap light |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
Starting April 1 |
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
May 24 |
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
Patio done 7/31 |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
Working on it 6/1 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
|
|
-- |
-- |
Electric Rough In (4)
|
In progress 6/5 (most progress in this townhouse) |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
In process 7/31 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
In process 7/31 |
|
-- |
-- |
Paint 1 (1)
|
Tues, Aug 13 |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
August 9 |
|
-- |
-- |
Granite Installation (1)
|
|
|
-- |
-- |
Interior Trim - Install (3)
|
In process 8/17 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Done- all tile 12x12 |
|
-- |
-- |
Paint 2 (3)
|
No color 9/21 |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
On site 9/7 |
|
-- |
-- |
Shoe Moulding (0)
|
In process 9/25 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
In process 9/21. Need shelving. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
In process 9/28 |
|
-- |
-- |
HVAC Trim Out (1)
|
HVAC is set |
|
-- |
-- |
Plumbing Trim Out (2)
|
Done. Extra toilet in basement. |
|
-- |
-- |
Install Appliances (0)
|
Sep 20 |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
|
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
|
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
Wed, Oct 16 at 9:00 AM |
|
-- |
-- |
Buyer Walk Through (1)
|
Tue, Oct 15 at 4:30 PM |
|
-- |
-- |
Payment for Upgrades (0)
|
|
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Closing (1)
|
Wed, Oct 16 at 9:00 AM @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|