Contact Cody Frye 540-908-5586 |
Called Cody 4 Times 3 messages and no answer as of 9/21 GWB |
|
-- |
-- |
Bring paint and brush to cody |
Greg to bring paint over GWB |
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
Charleston brick, Ivory Vinyl, Green front door |
|
|
-- |
-- |
Charleston Brick, ivory vinyl, gold front door |
|
|
-- |
-- |
Basement bathroom plumbing |
|
|
-- |
-- |
Toilet plumbing basement bath? |
|
|
-- |
-- |
Cabinet hardware |
Few missing 8/14 |
|
-- |
-- |
Lazy Susan cabinet issue 8/14? |
|
|
-- |
-- |
Box labeled for 51 is sitting in basement foyer of 50 |
|
|
-- |
-- |
Upstairs bath vanity top needed 8/28 |
|
|
-- |
-- |
Bathroom door install basement |
Tom |
|
-- |
-- |
Replace fridge door w/dent 9/7 |
On order 10/16 spoke to Leslie- will take another 6-8 weeks to come in. |
|
-- |
-- |
Water leaking HVAC?? 9/7 |
|
|
-- |
-- |
No plumbing/sink in garage? |
|
|
-- |
-- |
Gaps between shoe molding and tile in foyer |
Tile guy |
|
-- |
-- |
Pic of master toilet-comfort height? |
|
|
-- |
-- |
Outside vent cover needed |
Installed but obvious gaps between cover and brick |
|
-- |
-- |
HVAC cover needed upstairs |
Throughout house needs covers |
|
-- |
-- |
Gutter drain needed |
|
|
-- |
-- |
Coded lockbox 5050 |
|
|
-- |
-- |
Drywall patch pantry |
|
|
-- |
-- |
Handrails on steps |
|
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
|
|
|
-- |
-- |
Walk Through - Fri 3:30 PM |
|
|
-- |
-- |
Paint front door |
Gold |
|
-- |
-- |
Fix front overhang |
|
|
-- |
-- |
Touch up paint throughout |
|
|
-- |
-- |
Back door hole plugs |
|
|
-- |
-- |
Stain steps |
|
|
-- |
-- |
Touch up paint basement bath door/install hardware |
|
|
-- |
-- |
Gaps in foyer ceramic tile |
|
|
-- |
-- |
Sand/paint pantry drywall repair |
|
|
-- |
-- |
Sand/paint pantry drywall repair |
|
|
-- |
-- |
|
|
|
-- |
-- |
Adjusting cabinet doors |
|
|
-- |
-- |
Touch up paint |
|
|
-- |
-- |
Finish poly on steps |
|
|
-- |
-- |
|
|
|
-- |
-- |
Paint kitchen ceiling |
Galindez Planning with Cody directly 8/18 GWB |
|
-- |
-- |
Patch and paint at ceiling light fixture gap |
Galindez Planning with Cody directly 8/18 GWB |
|
-- |
-- |
Repair lazy susan |
part in. Installer scheduling with Cody GWB |
|
-- |
-- |
Contact Cody Frye |
540-908-5586 |
|
-- |
-- |
Adjust exterior door where daylight can be seen |
JB workin at bluestone today 9/3 |
|
-- |
-- |
Ceiling chipped at light on lower stairs |
Galindez Planning with Cody directly 8/18 GWB |
|
-- |
-- |
Caulk/Grout splitting on stairs, bathrooms, hallways |
Galindez Planning with Cody directly 8/18 GWB |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
Starting April 1 |
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Order Appliances (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
Patio done 7/31 |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Fri, Jun 20 |
|
-- |
-- |
Plumbing Rough In (4)
|
Started 6/5 |
|
-- |
-- |
Electric Rough In (4)
|
In process 6/16 |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
Mon, Jun 24 |
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
All but garage/basement 7/10 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
In process 7/13 |
|
-- |
-- |
Paint 1 (1)
|
|
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
All installed/need hardware |
|
-- |
-- |
Granite Installation (1)
|
8/21 |
|
-- |
-- |
Interior Trim - Install (3)
|
In process 7/31 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
In garage 8/7 |
|
-- |
-- |
Paint 2 (3)
|
In process 8/21 |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
On site 9/7 |
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
All done but bath fans |
|
-- |
-- |
HVAC Trim Out (1)
|
Set 8/7 |
|
-- |
-- |
Plumbing Trim Out (2)
|
Set basement toilet/pedestal sink |
|
-- |
-- |
Install Appliances (0)
|
Stove, Mon, Sep 16 |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
Week of Sep 16 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
Thursday, 10/17 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
This week |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Thursday 10/17 2:30 |
|
-- |
-- |
Payment for Upgrades (0)
|
$1,575 |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Closing (1)
|
Botkin Rose, Fri, Oct 18 at 2:30 PM |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|