ADDR
- 50  ::  2226 Deyerle Avenue
[ BUILD: 1812-0089 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Contact Cody Frye 540-908-5586 Called Cody 4 Times 3 messages and no answer as of 9/21 GWB
--   --   Bring paint and brush to cody Greg to bring paint over GWB
Fri    Sep 20      Ratified Contract? (0)      
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Inspection (Concrete Wall) (1)      
Mon    Sep 23      Inspection (Conduit Under Slab) (1)      
Tue    Sep 24      Inspection (Drain Tile) (0)      
Tue    Sep 24      Settlement Agent Confirmed (0)      
Tue    Sep 24      Verify Window & Roof Structure (0)      
Tue    Sep 24      Patio (0)      
Tue    Sep 24      Rough In Microwave Vent (0)      
Tue    Sep 24      Inspection (Rough In Plumbing) (1)      
Wed    Sep 25      Inspection (Rough In Electric) (1)      
Thu    Sep 26      Inspection (Deck Piers) (0)      
Thu    Sep 26      Inspection (Framing) (1)      
Fri    Sep 27      Exterior Stone (0)      
Fri    Sep 27      Set Electric Meter (0)      
Fri    Sep 27      Inspection (Main Water Line) (0)      
Fri    Sep 27      Loan Approval (0)      
Fri    Sep 27      Deed Preparation (0)      
Fri    Sep 27      Mailbox (0)      
Fri    Sep 27      Interior Trim - Paint (1)      
Mon    Sep 30      Ceiling Fans (0)      
Mon    Sep 30      Blower Door Test (1)      
Tue    Oct 1      Inspection (Final HVAC) (1)      
Wed    Oct 2      Inspection (Final Plumbing) (1)      
Thu    Oct 3      Inspection (Final Electric) (1)      
Fri    Oct 4      Stain Hardwood Stairs (1)      
Mon    Oct 7      Request Trash Tote From POA Manager (0)      
--   --   Charleston brick, Ivory Vinyl, Green front door
--   --   Charleston Brick, ivory vinyl, gold front door
--   --   Basement bathroom plumbing
--   --   Toilet plumbing basement bath?
--   --   Cabinet hardware Few missing 8/14
--   --   Lazy Susan cabinet issue 8/14?
--   --   Box labeled for 51 is sitting in basement foyer of 50
--   --   Upstairs bath vanity top needed 8/28
--   --   Bathroom door install basement Tom
--   --   Replace fridge door w/dent 9/7 On order 10/16 spoke to Leslie- will take another 6-8 weeks to come in.
--   --   Water leaking HVAC?? 9/7
--   --   No plumbing/sink in garage?
--   --   Gaps between shoe molding and tile in foyer Tile guy
--   --   Pic of master toilet-comfort height?
--   --   Outside vent cover needed Installed but obvious gaps between cover and brick
--   --   HVAC cover needed upstairs Throughout house needs covers
--   --   Gutter drain needed
--   --   Coded lockbox 5050
--   --   Drywall patch pantry
--   --   Handrails on steps
--   --   Paint touch up throughout
--   --  
--   --   Walk Through - Fri 3:30 PM
--   --   Paint front door Gold
--   --   Fix front overhang
--   --   Touch up paint throughout
--   --   Back door hole plugs
--   --   Stain steps
--   --   Touch up paint basement bath door/install hardware
--   --   Gaps in foyer ceramic tile
--   --   Sand/paint pantry drywall repair
--   --   Sand/paint pantry drywall repair
--   --  
--   --   Adjusting cabinet doors
--   --   Touch up paint
--   --   Finish poly on steps
--   --  
--   --   Paint kitchen ceiling Galindez Planning with Cody directly 8/18 GWB
--   --   Patch and paint at ceiling light fixture gap Galindez Planning with Cody directly 8/18 GWB
--   --   Repair lazy susan part in. Installer scheduling with Cody GWB
--   --   Contact Cody Frye 540-908-5586
--   --   Adjust exterior door where daylight can be seen JB workin at bluestone today 9/3
--   --   Ceiling chipped at light on lower stairs Galindez Planning with Cody directly 8/18 GWB
--   --   Caulk/Grout splitting on stairs, bathrooms, hallways Galindez Planning with Cody directly 8/18 GWB
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1)      
-- -- Framing I (9)       Starting April 1
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8)      
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)       Patio done 7/31
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Fri, Jun 20
-- -- Plumbing Rough In (4)       Started 6/5
-- -- Electric Rough In (4)       In process 6/16
-- -- Exterior Vinyl (0)      
-- -- Insulation (2)       Mon, Jun 24
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4)       All but garage/basement 7/10
-- -- Drywall (Tape, Block, Skim, Sand) (6)       In process 7/13
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2)       All installed/need hardware
-- -- Granite Installation (1)       8/21
-- -- Interior Trim - Install (3)       In process 7/31
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3)      
-- -- Luxury Vinyl Tile (0)       In garage 8/7
-- -- Paint 2 (3)       In process 8/21
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)       On site 9/7
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)      
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       All done but bath fans
-- -- HVAC Trim Out (1)       Set 8/7
-- -- Plumbing Trim Out (2)       Set basement toilet/pedestal sink
-- -- Install Appliances (0)       Stove, Mon, Sep 16
-- -- Paint 3 (2)      
-- -- Carpet (2)       Week of Sep 16
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2)       Thursday, 10/17
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       This week
-- -- Certificate of Occupancy (1)      
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Thursday 10/17 2:30
-- -- Payment for Upgrades (0)       $1,575
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)       Botkin Rose, Fri, Oct 18 at 2:30 PM
-- -- Remove Coded Lockbox (0)