- 52  ::  2230 Deyerle Avenue
[ BUILD: 1812-0091 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Fri    Sep 20      Ratified Contract? (0)      
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Inspection (Concrete Wall) (1)      
Mon    Sep 23      Inspection (Conduit Under Slab) (1)      
Tue    Sep 24      Inspection (Drain Tile) (0)      
Tue    Sep 24      Settlement Agent Confirmed (0)      
Tue    Sep 24      Verify Window & Roof Structure (0)      
Tue    Sep 24      Patio (0)      
Tue    Sep 24      Rough In Microwave Vent (0)      
Tue    Sep 24      Inspection (Rough In Plumbing) (1)      
Wed    Sep 25      Inspection (Rough In Electric) (1)      
Thu    Sep 26      Inspection (Deck Piers) (0)      
Thu    Sep 26      Inspection (Framing) (1)      
Fri    Sep 27      Exterior Stone (0)      
Fri    Sep 27      Set Electric Meter (0)      
Fri    Sep 27      Inspection (Main Water Line) (0)      
Fri    Sep 27      Loan Approval (0)      
Fri    Sep 27      Deed Preparation (0)      
Fri    Sep 27      Mailbox (0)      
Fri    Sep 27      Interior Trim - Paint (1)      
Mon    Sep 30      Ceiling Fans (0)      
Mon    Sep 30      Blower Door Test (1)      
Tue    Oct 1      Inspection (Final HVAC) (1)      
Wed    Oct 2      Inspection (Final Plumbing) (1)      
Thu    Oct 3      Inspection (Final Electric) (1)      
Fri    Oct 4      Stain Hardwood Stairs (1)      
Mon    Oct 7      Request Trash Tote From POA Manager (0)      
--   --   Buyer is requesting all "daylight" LED bulbs- What does Ferguson provide?
--   --   Lighting Plumbing Portfolio and PRicing
--   --   Ivory vinyl, red front door
--   --   Charleston brick, country beige vinyl, green front door
--   --   Solar tube is on site
--   --   Landing top step of first section upstairs has big “creak” when walked on Many creaks on both sets of stairs
--   --   Tub liner up bath
--   --   Roof issue (see pic) Soffit - Davenport (http://bit.ly/2kj5daw)
--   --   Concrete patch needed at toilet in basement bath 8/28
--   --   1) Crocus Petal Purple - Medium room (two sides) 2) Island Sunset - Small Room (two sides) 3) Banana Yellow - Master bedroom One wall 4) Living Room- Berry wine (TV mount wall only)
--   --   Missing molding/flashing around front entrance (see pic)
--   --   Corner cabinet missing door
--   --   Ceiling fans not installed in bedrooms as per BCP notes
--   --   Needs vinyl under stairs
--   --   Bathroom basement hole. Tile repairs.
--   --   Dining room dimmer switch needed
--   --   Attic access panel needed
--   --   Trim in upstairs hall baths
--   --   Bath lights missing globes
--   --   CODED LOCKBOX 5252
--   --   Handrails needed
--   --   Stain steps
--   --   Gaps in ceramic foyer tile
--   --   Missing smoke detector In basement bonus room
--   --   Back door hole plugs
--   --   Metal strip for dishwasher to attach to counter on site
--   --   Cabinet trim needed
--   --   Cabinet hardware (1) needed
--   --   Needs paint 3
--   --   Globe to bedroom ceiling fan On order
--   --   Globe to bedroom ceiling fan
--   --  
--   --   Solar panel cover install
--   --   Upstairs bath vanity door hits wall
--   --   Attic access needs installed
--   --   Drawer front-left of the stove Teeny chip-is that issue or wrong townhouse?
--   --   Crooked plastic porch cover things...
--   --   Broken trim at steps
--   --   Flooring issues (tape) hall bath
--   --   Touch up paint throughout
--   --   Hall drywall shower head repair
--   --   Need leg on wire shelf in pantry
--   --   Need white plugs to go in patio doors Half-completed 10/26
--   --   Chips and cabinet to the right of dishwasher In, to be delivered on 10/29
--   --   Dimmer switch on dining room light
--   --   Surround sound-ask Tom
--   --   Cover on hole behind TV
--   --   Half bath plumbing leak
--   --   Cover on fan in half bath
--   --   Adjust closet doors
--   --   Adjust pocket door
--   --   Adjust j channel holding up roof front door Tom (?) - Adjust j channel, fill gap with caulk
--   --   Peep hole front door
--   --  
--   --   Garage door is missing white trim piece
--   --   Paint touch up needed LR ceiling
--   --   Stair trim needed basement to main level
--   --   Dimmer switch on living room lights Kate will follow up
--   --  
--   --   Homeowner wants Tom to widen driveway
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1)      
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)       Need tub/shower in both up bathrooms
-- -- Framing II (8)      
-- -- Framing III (8)      
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)       Patio done 7/31
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       Buyer wants tub/shower in both Up bath and Master
-- -- Electric Rough In (4)       In process 6/26
-- -- Exterior Vinyl (0)      
-- -- Insulation (2)       Ready as of June 27
-- -- Inspection (Insulation) (1)       Mon, July 8 ?
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4)       in process 7/31
-- -- Drywall (Tape, Block, Skim, Sand) (6)       Needs sanding 8/7
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2)       August 9
-- -- Granite Installation (1)      
-- -- Interior Trim - Install (3)       In process 8/28
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3)      
-- -- Luxury Vinyl Tile (0)       Underlayment down 8/21
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)       In foyer
-- -- Shelving, Door Knobs, Fire Extinguisher (0)      
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       In process 9/25
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Complete except 1/2 bath
-- -- Install Appliances (0)       In garage 10/9
-- -- Paint 3 (2)       10/19 in process
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Tell Carey when cleaned
-- -- Inspection (Final Building) (2)      
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1)      
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Mon, Oct 21 2:30pm
-- -- Payment for Upgrades (0)       $4,310
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)       West View Title, Oct 31 at 12PM
-- -- Remove Coded Lockbox (0)