Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Buyer is requesting all "daylight" LED bulbs- What does Ferguson provide? |
|
|
-- |
-- |
Lighting Plumbing Portfolio and PRicing |
|
|
-- |
-- |
Ivory vinyl, red front door |
|
|
-- |
-- |
Charleston brick, country beige vinyl, green front door |
|
|
-- |
-- |
Solar tube is on site |
|
|
-- |
-- |
Landing top step of first section upstairs has big “creak” when walked on |
Many creaks on both sets of stairs |
|
-- |
-- |
Tub liner up bath |
|
|
-- |
-- |
Roof issue (see pic) |
Soffit - Davenport (http://bit.ly/2kj5daw) |
|
-- |
-- |
Concrete patch needed at toilet in basement bath 8/28 |
|
|
-- |
-- |
1) Crocus Petal Purple - Medium room (two sides) 2) Island Sunset - Small Room (two sides) 3) Banana Yellow - Master bedroom One wall 4) Living Room- Berry wine (TV mount wall only) |
|
|
-- |
-- |
Missing molding/flashing around front entrance (see pic) |
|
|
-- |
-- |
Corner cabinet missing door |
|
|
-- |
-- |
Ceiling fans not installed in bedrooms as per BCP notes |
|
|
-- |
-- |
Needs vinyl under stairs |
|
|
-- |
-- |
Bathroom basement hole. Tile repairs. |
|
|
-- |
-- |
Dining room dimmer switch needed |
|
|
-- |
-- |
Attic access panel needed |
|
|
-- |
-- |
Trim in upstairs hall baths |
|
|
-- |
-- |
Bath lights missing globes |
|
|
-- |
-- |
CODED LOCKBOX 5252 |
|
|
-- |
-- |
Handrails needed |
|
|
-- |
-- |
Stain steps |
|
|
-- |
-- |
Gaps in ceramic foyer tile |
|
|
-- |
-- |
Missing smoke detector |
In basement bonus room |
|
-- |
-- |
Back door hole plugs |
|
|
-- |
-- |
Metal strip for dishwasher to attach to counter |
on site |
|
-- |
-- |
Cabinet trim needed |
|
|
-- |
-- |
Cabinet hardware (1) needed |
|
|
-- |
-- |
Needs paint 3 |
|
|
-- |
-- |
Globe to bedroom ceiling fan |
On order |
|
-- |
-- |
Globe to bedroom ceiling fan |
|
|
-- |
-- |
|
|
|
-- |
-- |
Solar panel cover install |
|
|
-- |
-- |
Upstairs bath vanity door hits wall |
|
|
-- |
-- |
Attic access needs installed |
|
|
-- |
-- |
Drawer front-left of the stove |
Teeny chip-is that issue or wrong townhouse? |
|
-- |
-- |
Crooked plastic porch cover things... |
|
|
-- |
-- |
Broken trim at steps |
|
|
-- |
-- |
Flooring issues (tape) hall bath |
|
|
-- |
-- |
Touch up paint throughout |
|
|
-- |
-- |
Hall drywall shower head repair |
|
|
-- |
-- |
Need leg on wire shelf in pantry |
|
|
-- |
-- |
Need white plugs to go in patio doors |
Half-completed 10/26 |
|
-- |
-- |
Chips and cabinet to the right of dishwasher |
In, to be delivered on 10/29 |
|
-- |
-- |
Dimmer switch on dining room light |
|
|
-- |
-- |
Surround sound-ask Tom |
|
|
-- |
-- |
Cover on hole behind TV |
|
|
-- |
-- |
Half bath plumbing leak |
|
|
-- |
-- |
Cover on fan in half bath |
|
|
-- |
-- |
Adjust closet doors |
|
|
-- |
-- |
Adjust pocket door |
|
|
-- |
-- |
Adjust j channel holding up roof front door |
Tom (?) - Adjust j channel, fill gap with caulk |
|
-- |
-- |
Peep hole front door |
|
|
-- |
-- |
|
|
|
-- |
-- |
Garage door is missing white trim piece |
|
|
-- |
-- |
Paint touch up needed LR ceiling |
|
|
-- |
-- |
Stair trim needed basement to main level |
|
|
-- |
-- |
Dimmer switch on living room lights |
Kate will follow up |
|
-- |
-- |
|
|
|
-- |
-- |
Homeowner wants Tom to widen driveway |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
Need tub/shower in both up bathrooms |
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Patio done 7/31 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Buyer wants tub/shower in both Up bath and Master |
|
-- |
-- |
Electric Rough In (4) |
In process 6/26 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Ready as of June 27 |
|
-- |
-- |
Inspection (Insulation) (1) |
Mon, July 8 ? |
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
in process 7/31 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs sanding 8/7 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
August 9 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
In process 8/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Underlayment down 8/21 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
In foyer |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 9/25 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Complete except 1/2 bath |
|
-- |
-- |
Install Appliances (0) * |
In garage 10/9 |
|
-- |
-- |
Paint 3 (2) * |
10/19 in process |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Tell Carey when cleaned |
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Mon, Oct 21 2:30pm |
|
-- |
-- |
Payment for Upgrades (0) |
$4,310 |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
West View Title, Oct 31 at 12PM |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|