Paint touch up in Living room |
Galindez GWB |
|
-- |
-- |
Nancy - 703-965-2167 |
|
|
Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Charleston Brick, Ivory Vinyl, |
|
|
-- |
-- |
Chalreston Brick, Country Beige Vinyl,green door |
|
|
-- |
-- |
Charleston- Country Beige Vinyl- GREEN DOOR |
|
|
-- |
-- |
Lease ends Aug 31 |
|
|
-- |
-- |
Need tub liner upstairs |
And in basement |
|
-- |
-- |
Color issue in brick on side of house? |
|
|
-- |
-- |
Concrete patch needed basement toilet 8/28 |
|
|
-- |
-- |
Cabinet hardware needed |
All vanities need hardware also |
|
-- |
-- |
Closet door hardware and adjustments |
JB |
|
-- |
-- |
Repaint back wall in bedroom to paint an incorrect color |
Accent wall? Upstairs hall and basement bonus room. |
|
-- |
-- |
Attic access panel needed in master closet |
In. Needs painting. |
|
-- |
-- |
Install handrails |
JB |
|
-- |
-- |
Stain steps |
To be scheduled |
|
-- |
-- |
Install shoe mold |
|
|
-- |
-- |
Gaps in ceramic tile in foyer between shoe molding |
Appears to have been caulked. One spot remains near steps. |
|
-- |
-- |
CODED LOCKBOX 5353 |
|
|
-- |
-- |
Home Inspection - Thurs, Oct 3 at 1PM |
Benjamin Meredith |
|
-- |
-- |
Drain spouts needed |
|
|
-- |
-- |
Touch up paint needed after drywall patches |
|
|
-- |
-- |
Touch up paint throughout needed |
|
|
-- |
-- |
Basement bath hole/tile repair |
|
|
-- |
-- |
Need same colored lightbulbs above island |
|
|
-- |
-- |
Outdoor electrical trim out needed |
|
|
-- |
-- |
HVAC covers needed |
|
|
-- |
-- |
More light bulbs MB |
|
|
-- |
-- |
Home Inspection, Mon, Oct 7 at 4:30 PM |
Benjamin Meredith |
|
-- |
-- |
HVAC covers |
|
|
-- |
-- |
Missing siding at rear of house |
|
|
-- |
-- |
Extend splash blocks |
|
|
-- |
-- |
Washer drain too high to be effective at washer pan |
|
|
-- |
-- |
Two side-by-side switches that control ceiling fan. Recommend repair by an electrician |
|
|
-- |
-- |
Cleaning |
|
|
-- |
-- |
Brick on side of townhouse |
|
|
-- |
-- |
Closed! |
|
|
-- |
-- |
Cracked Drawer needs replacing |
|
|
-- |
-- |
Cracks on wall on 3rd floor |
John Weeks |
|
-- |
-- |
Finish drywall around power box |
John Weeks |
|
-- |
-- |
install cabinet door |
John Weeks |
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Patio done 7/31 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
week of 7/1 |
|
-- |
-- |
Plumbing Rough In (4) |
Finishing 6/20 |
|
-- |
-- |
Electric Rough In (4) |
should be done 7/1 |
|
-- |
-- |
Exterior Vinyl (0) * |
In process 6/22 |
|
-- |
-- |
Insulation (2) |
Ready as of July 8 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
On site 7/31 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs sanding 8/17 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
August 9 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
In process 8/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In garage 8/7 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Maybe Wed, Sep 18? |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
9/16 in process |
|
-- |
-- |
HVAC Trim Out (1) |
Set 8/10 |
|
-- |
-- |
Plumbing Trim Out (2) |
All but basement toilet |
|
-- |
-- |
Install Appliances (0) * |
Wed, Sep 18? |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Final Building Inspection Monday 10/7 AM |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Has Begun |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Tuesday October 8 at 12 NOON to MEET TOM |
|
-- |
-- |
Payment for Upgrades (0) |
$9,979.74 (or something similar) |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
West View Title, Wed, Oct 9 at 2PM |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|