|
| 12 x 12 Concrete Patio |
|
| Full finished basement with full bathroom (vanity) |
|
| Four Elongated Toilets |
|
| Allowance for two shower doors to be selected by approved vendor |
|
| Two master suites |
|
| Upgraded Quartz |
|
| Upgraded Cabinetry Kitchen |
|
| Upgraded LVP main level |
|
| Upgraded SS Whirlpool Appliances ( additional upgrade- french model fridge with interior water dispenser +500) |
|
| Upgraded Carpet Pad |
|
| Upgraded Bathroom Cabinets |
|
| Add two ceiling fans in upper bedrooms |
|
| Convert to 3 Bedroom |
|
| Change order fee For luxury vinyl plank in Vail versus original selection |
|
| Add dimmer switch to master bedroom |
|
| Vent microwave to outside |
|
| Credit for Bedroom Change |
|
| Contract Amendment |
|