Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Inspection (Final HVAC) (1)      
Fri    Dec 26      Inspection (Final Plumbing) (1)      
Mon    Dec 29      Inspection (Final Electric) (1)      
Tue    Dec 30      Stain Hardwood Stairs (1) *       
Wed    Dec 31      Request Trash Tote From POA Manager (0)      
--   --   BRICK Carters Grove, VINYL- Ivory DOOR COLOR green
--   --   Very bumpy/irregular basement floor. Issue?
--   --   Back slider door frame cracked 11/13 At threshold
--   --   Kitchen backsplash just needs grout 2/15
--   --   Drywall repairs to MB 12/18 Still needs sanding 1/15
--   --   MB tile ok? Specs say 12x12
--   --   Missing brick below front window 1/5 Talk to Masons they said they would take care of it. 1/6
--   --   Yes to tile back splash in white subway tile Just needs grout 2/15
--   --   Cover kitchen floor 1/22
--   --   CODED LOCKBOX-6969
--   --   Fire extinguisher 2/1
--   --   Need kitchen & vanity hardware 2/12 Picked up and on site 2/13 GWB
--   --   Few touch ups laundry room 2/12 Mahar touch up 2/17
--   --   Needs MB mirror 2/15 Move towel ring?
--   --   Final HVAC trim out 2/15
--   --   Screens
--   --   Caulk Toilet on mainlevel
--   --   adjust doors in the upstairs closets JB
--   --   Mirror in master bath
--   --   Remove/patch hole MB mirror 2/23 Painter
--   --   Back door hole plugs 2/23 JB
--   --   Screens Just need back slider 2/26
--   --   Kitchen cabinet HVAC vent 2/26 Greg will call Clem or Ronnie
--   --   Clean out basement 2/26
--   --   Remove floor covering
--   --   Shoe mold on front and back doors On site 3/4
--   --   Replace siding on roof of back porch
--   --   Final clean
--   --   Cracked trim above kitchen sink
--   --   Sweep and mop basement Needs one more sweep
--   --   Sweep and mop basement
--   --   Paint edges of cabinets 2/29
--   --   Mulch needed 2/29
--   --   Cracks in MB vanity 2/29 (JB) On order
--   --   Screens needed in basement 2/29
--   --   Mulch needed 2/29
--   --   Quite a few missing lightbulbs 3/4 Painter
--   --   Countertops replaced-need patch/paint 3/4 Painter
--   --   Electric box cover 3/4
--   --   Over spray I master bath Painter
--   --   Cabinet drawer issue?
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *        Back slider needs installed 11/6
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)       Started 11/13
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)       Tom will call Pettit
-- -- HVAC Rough In (4)       Started 10/26
-- -- Plumbing Rough In (4)       Started 10/30
-- -- Electric Rough In (4)       In process 11/9
-- -- Inspection (Rough In HVAC) (1)       Nov 14
-- -- Exterior Vinyl (0) *        In process 1/11
-- -- Insulation (2) *        Tue, Nov 19
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        On site 11/23
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Abi installing 1/11
-- -- Granite Installation (1) *        feb 6
-- -- Interior Trim - Install (3) *       
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        Installing kitchen 1/15
    Luxury Vinyl Plank  
-- -- Luxury Vinyl Tile (0)       Going in 12/18
-- -- Paint 2 (3)       In process 1/15
-- -- Cover Floors (1)       Cover newly laid floor in kitchen 1/19
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        In process 1/29
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *        Box set but not meter 2/25
-- -- Electric Trim Out (3) *        Need vanity lights 2/12
-- -- HVAC Trim Out (1) *        Furnace set 1/15
-- -- Plumbing Trim Out (2) *        95% complete 2/8- just need kitchen sink faucet
-- -- Install Appliances (0) *        Set for Thurs 2/20 GWB
    Amana Stainless Steel Appliances  
-- -- Paint 3 (2) *        In process 2/4
-- -- Carpet (2)      
    8 lb carpet padding (all carpeted areas)  
-- -- Appraiser Confirms Construction Completion (0)       Teri Robinson, Vision Appraisal going March 6
-- -- Inspection (Final Building) (2) *        After water meter
-- -- Pre Walk Through (0)       Done by Greg and Tom 2/19
-- -- Cleaning (1)       Cleaning started 2/22
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *        Fri, Feb 28, 3:00 PM
-- -- Payment for Upgrades (0)       $2,270
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       West View Title (Sara)
-- -- Closing (1)       Friday, March 13 at 9:00 AM
-- -- Remove Coded Lockbox (0)