Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
BRICK Carters Grove, VINYL- Ivory DOOR COLOR green |
|
|
-- |
-- |
Very bumpy/irregular basement floor. Issue? |
|
|
-- |
-- |
Back slider door frame cracked 11/13 |
At threshold |
|
-- |
-- |
Kitchen backsplash just needs grout 2/15 |
|
|
-- |
-- |
Drywall repairs to MB 12/18 |
Still needs sanding 1/15 |
|
-- |
-- |
MB tile ok? Specs say 12x12 |
|
|
-- |
-- |
Missing brick below front window 1/5 |
Talk to Masons they said they would take care of it. 1/6 |
|
-- |
-- |
Yes to tile back splash in white subway tile |
Just needs grout 2/15 |
|
-- |
-- |
Cover kitchen floor 1/22 |
|
|
-- |
-- |
CODED LOCKBOX-6969 |
|
|
-- |
-- |
Fire extinguisher 2/1 |
|
|
-- |
-- |
Need kitchen & vanity hardware 2/12 |
Picked up and on site 2/13 GWB |
|
-- |
-- |
Few touch ups laundry room 2/12 |
Mahar touch up 2/17 |
|
-- |
-- |
Needs MB mirror 2/15 |
Move towel ring? |
|
-- |
-- |
Final HVAC trim out 2/15 |
|
|
-- |
-- |
Screens |
|
|
-- |
-- |
Caulk Toilet on mainlevel |
|
|
-- |
-- |
adjust doors in the upstairs closets |
JB |
|
-- |
-- |
Mirror in master bath |
|
|
-- |
-- |
Remove/patch hole MB mirror 2/23 |
Painter |
|
-- |
-- |
Back door hole plugs 2/23 |
JB |
|
-- |
-- |
Screens |
Just need back slider 2/26 |
|
-- |
-- |
Kitchen cabinet HVAC vent 2/26 |
Greg will call Clem or Ronnie |
|
-- |
-- |
Clean out basement 2/26 |
|
|
-- |
-- |
Remove floor covering |
|
|
-- |
-- |
Shoe mold on front and back doors |
On site 3/4 |
|
-- |
-- |
Replace siding on roof of back porch |
|
|
-- |
-- |
Final clean |
|
|
-- |
-- |
Cracked trim above kitchen sink |
|
|
-- |
-- |
Sweep and mop basement |
Needs one more sweep |
|
-- |
-- |
Sweep and mop basement |
|
|
-- |
-- |
Paint edges of cabinets 2/29 |
|
|
-- |
-- |
Mulch needed 2/29 |
|
|
-- |
-- |
Cracks in MB vanity 2/29 (JB) |
On order |
|
-- |
-- |
Screens needed in basement 2/29 |
|
|
-- |
-- |
Mulch needed 2/29 |
|
|
-- |
-- |
Quite a few missing lightbulbs 3/4 |
Painter |
|
-- |
-- |
Countertops replaced-need patch/paint 3/4 |
Painter |
|
-- |
-- |
Electric box cover 3/4 |
|
|
-- |
-- |
Over spray I master bath |
Painter |
|
-- |
-- |
Cabinet drawer issue? |
|
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
Back slider needs installed 11/6 |
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Order Appliances (0)
|
|
|
-- |
-- |
Deck (0)
|
Started 11/13 |
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
|
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
Tom will call Pettit |
|
-- |
-- |
HVAC Rough In (4)
|
Started 10/26 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Nov 14 |
|
-- |
-- |
Plumbing Rough In (4)
|
Started 10/30 |
|
-- |
-- |
Electric Rough In (4)
|
In process 11/9 |
|
-- |
-- |
Exterior Vinyl (0)
|
In process 1/11 |
|
-- |
-- |
Insulation (2)
|
Tue, Nov 19 |
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
On site 11/23 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
|
|
-- |
-- |
Paint 1 (1)
|
|
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
Abi installing 1/11 |
|
-- |
-- |
Granite Installation (1)
|
feb 6 |
|
-- |
-- |
Interior Trim - Install (3)
|
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
Installing kitchen 1/15 |
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Going in 12/18 |
|
-- |
-- |
Paint 2 (3)
|
In process 1/15 |
|
-- |
-- |
Cover Floors (1)
|
Cover newly laid floor in kitchen 1/19 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
In process 1/29 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
Box set but not meter 2/25 |
|
-- |
-- |
Electric Trim Out (3)
|
Need vanity lights 2/12 |
|
-- |
-- |
HVAC Trim Out (1)
|
Furnace set 1/15 |
|
-- |
-- |
Plumbing Trim Out (2)
|
95% complete 2/8- just need kitchen sink faucet |
|
-- |
-- |
Install Appliances (0)
|
Set for Thurs 2/20 GWB |
|
-- |
-- |
Paint 3 (2)
|
In process 2/4 |
|
-- |
-- |
Carpet (2)
|
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Teri Robinson, Vision Appraisal going March 6 |
|
-- |
-- |
Inspection (Final Building) (2)
|
After water meter |
|
-- |
-- |
Pre Walk Through (0)
|
Done by Greg and Tom 2/19 |
|
-- |
-- |
Cleaning (1)
|
Cleaning started 2/22 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Fri, Feb 28, 3:00 PM |
|
-- |
-- |
Payment for Upgrades (0)
|
$2,270 |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
West View Title (Sara) |
|
-- |
-- |
Closing (1)
|
Friday, March 13 at 9:00 AM |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|