Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
|
-- |
-- |
Closet by front door for taking shoes off? |
|
|
-- |
-- |
Small show closet located off front door- to be determined at a framing walk through- When should this be scheduled TOM? |
|
|
-- |
-- |
Small shoe closet to be built by front door for shoes. Culturally important. Perhaps a small ceramic entry as well. DO be determined at buyer walk thorugh. TOM WHEN CAN WE SCHEDULE? |
TOM tell Kate |
|
-- |
-- |
Buyer Requesting price for steps from deck to yard. |
Tom tell Kate |
|
-- |
-- |
BRICK Charleston, VINYL- Bone DOOR COLOR red |
|
|
-- |
-- |
Lots of mildew on LR walls |
Tom will address |
|
-- |
-- |
FINANCING ISSUES - Nov 12 |
|
|
-- |
-- |
Under contract sticker (court) |
|
|
-- |
-- |
Bathtub liners needed 11/23 |
|
|
-- |
-- |
Set tub in basement 12/1 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Repair basement bath wall 12/15 |
|
|
-- |
-- |
DISCUSS - Lease ends January 31 |
|
|
-- |
-- |
Add stud to laundry room for washer/dryer hookup |
|
|
-- |
-- |
Gold Door Color |
|
|
-- |
-- |
Missing trim in MB 2/1 |
|
|
-- |
-- |
Missing trim basement bath |
|
|
-- |
-- |
Locked out 2/8 |
Keys??? |
|
-- |
-- |
CODED LOCKBOX 7171 |
|
|
-- |
-- |
Missing trim kitchen also 2/12 |
|
|
-- |
-- |
Board in upper window/remove 2/15 |
|
|
-- |
-- |
Vanity hardware needed 2/15 |
On site and should be installed today 3/12 |
|
-- |
-- |
Hump in floor |
Floor pulled up and prepared to sand 2/27 |
|
-- |
-- |
Cut sewer pipe down |
|
|
-- |
-- |
Trim cabinets 2/19 |
|
|
-- |
-- |
Very squeaky steps to upper level. 2/19 |
|
|
-- |
-- |
Vanity lights 2/26 |
|
|
-- |
-- |
Mulch needed 2/29 |
|
|
-- |
-- |
Replace shoe molding in areas its been pulled up 2/29 |
In progress 3/8 |
|
-- |
-- |
Finish shelving 2/29 |
|
|
-- |
-- |
Mirrors needed 2/29 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Trim on shoe cabinet needed 3/4 |
|
|
-- |
-- |
Poly staircase 3/8 |
Finishing now 3/12 |
|
-- |
-- |
Landing needs flooring installed 3/8 |
Eric |
|
-- |
-- |
Panel to water shut off needed 3/11 |
JB- needs painted 3/14 |
|
-- |
-- |
Knobs for shoe cabinet ordered? |
On site and should be installed today 3/12 |
|
-- |
-- |
|
|
|
-- |
-- |
Install 7 missing window screens |
Checking with JB and Tom |
|
-- |
-- |
Touch up paint |
Just a few spots left 3/14 |
|
-- |
-- |
Final cleaning |
almost complete 3/14 |
|
-- |
-- |
Replace kitchen faucet |
onsite. Bobby will install Monday morning 3/23 |
|
-- |
-- |
Touch up front door 3/14 |
|
|
-- |
-- |
Basement hall lights 3/14 |
make same direction |
|
-- |
-- |
Door touch up needed 3/25 |
Lock is fixed-needs paint touch-up3/29 |
|
-- |
-- |
Financing issues - closing is delayed |
|
|
-- |
-- |
Home Inspection, May 21 at 9AM |
Mike Donitzen |
|
-- |
-- |
Expanded deck |
12 x 18 |
|
-- |
-- |
Expanded Patio |
In process 5/13 |
|
-- |
-- |
Radon test Mon May 18 - Thu May 21 |
|
|
-- |
-- |
Remove gravel and leave back yard |
Fill dirt on site. Set to finish this week |
|
-- |
-- |
HVAC is not working properly |
cuts on and off and does not get hot enough (on a cold day) |
|
-- |
-- |
Doorbell broken 5/25 |
|
|
-- |
-- |
Adjust Electrical Panel |
Patrick to go over while Kumud is home |
|
-- |
-- |
Adjust screw sticking out |
JB |
|
-- |
-- |
Creaky floors (8/24) |
Greg will follow up with Eric |
|
-- |
-- |
Replace siding in rear under deck |
John weeks |
|
-- |
-- |
Bathroom and bedroom door handle wont lock |
Ron to call Kumud 9/23 to schedule GWB |
|
-- |
-- |
Creeks in floor upstairs |
John Weeks |
|
-- |
-- |
Kumud contact 202-425-9888 |
|
|
-- |
-- |
Hump in floor |
Eric to handle 1/20 GWB |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
Back slider needs installing 11/6 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
In process 11/13 |
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
set to poor stoop Tuesday 2/18. Set to start poor sidewalk 2/14 Patio done 1/29 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Started 10/26 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Almost complete 11/23. Basement tub needs set |
|
-- |
-- |
Electric Rough In (4) |
In process 12/11 |
|
-- |
-- |
Exterior Vinyl (0) * |
In process |
|
-- |
-- |
Insulation (2) |
Tues, Dec 17 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
In process 1/1 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
In process of taping/mudding 1/15 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Installing 2/1 |
|
-- |
-- |
Granite Installation (1) * |
Set date for 2/25 GWB |
|
-- |
-- |
Interior Trim - Install (3) |
In process 1/29 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Week of Feb 10 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
Starting Jan 23 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Looks like plumbing fixtures are here GWB missing bathroom fixtures and basement 2/14 |
|
-- |
-- |
Shoe Moulding (0) |
Down in flooring that hasn’t been pulled up 2/29 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
In process 2/14 GWB most shelves and handles done |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
All but vanity lights 2/23 |
|
-- |
-- |
HVAC Trim Out (1) |
Furnace set 1/19 |
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
Thursday March 5- appliances are now SS as Black is on back order through end of March- buyer approved |
|
-- |
-- |
Paint 3 (2) * |
Happening now 2/27 |
|
-- |
-- |
Carpet (2) |
Going in 2/26 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Dawn Showalter, March 16 |
|
-- |
-- |
Inspection (Final Building) (2) * |
Maybe afternoon of March 5 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
in process 5/28 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
Friday, May 29 |
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
Grab on Wednesday |
|