Kumud contact 202-425-9888 |
|
|
-- |
-- |
Small paint touch up |
Galindez Planning with Kumud directly 8/18 GWB |
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
BRICK Portsmouth, VINYL- country beige DOOR COLOR red |
|
|
-- |
-- |
Plumbing issue laundry wall board wrong? 12/18 |
|
|
-- |
-- |
Studs needed on basement back wall? Plumbing will need boxed in? |
|
|
-- |
-- |
Insulate back basement wall 1/1 |
|
|
-- |
-- |
Exposed pipe in basement bath drywall 1/11 |
being fixed 1/16 Joe |
|
-- |
-- |
Gap in cabinets. Extra cabinet on site. 2/4 |
|
|
-- |
-- |
CODED LOCKBOX 7373 |
|
|
-- |
-- |
CODED LOCKBOX 7373 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Mulch needed 2/29 |
|
|
-- |
-- |
Attic cover 2/29 |
Installed. Just needs painted. 3/18 |
|
-- |
-- |
Buyer loan commitment ends March 12 |
Send Oksana update ASAP |
|
-- |
-- |
Upgraded concrete patio-new add-on? 3/4 |
|
|
-- |
-- |
Upgraded concrete patio-new add-on? 3/4 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Broken microwave 3/8 |
On site. Waiting for install. 3/19 |
|
-- |
-- |
Shelving tweaks in pantry needed 3/8 |
|
|
-- |
-- |
Pedestal sink needed 3/8 |
|
|
-- |
-- |
Another cabinet in living room -extra? 3/8 |
|
|
-- |
-- |
Extra corner cabinet |
Set for install 3/16 |
|
-- |
-- |
Side splash master vanity top 3/11 |
|
|
-- |
-- |
Basement bath mirror needed 3/11 |
|
|
-- |
-- |
Tile grout in MB needed 3/14 |
Few spots in hall bath also |
|
-- |
-- |
Basement mirror |
|
|
-- |
-- |
Patio framed 3/18 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Fix where tile doesn’t meet shoe molding 3/22 |
Joe coming out 3/24 |
|
-- |
-- |
Fix where tile doesn’t meet shoe molding 3/22 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Install corner cabinet door |
equipment on site and set for install today 3/27 at 2pm |
|
-- |
-- |
Final final clean |
Pending closing |
|
-- |
-- |
Paint touch up |
scheduled for Wed. 3/25 |
|
-- |
-- |
Fix cabinet door |
Waiting on parts 3/24 |
|
-- |
-- |
Adjust front and back doors |
JB 3/25 |
|
-- |
-- |
Install screens |
Checking with JB and Tom |
|
-- |
-- |
Install screens |
|
|
-- |
-- |
Joe grouted some but not all cracks 3/25 |
|
|
-- |
-- |
Electric panel screw 3/25 |
|
|
-- |
-- |
hole in drywall over kitchen. Needs to be patched |
Paint touch up |
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Siding fall off in back |
JB |
|
-- |
-- |
Fix rear siding thats falling off |
JB to come this week GWB |
|
-- |
-- |
uneven and creeping floors on main level |
Eric or someone from Eagle will inspect GWB |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
Back slider needs installed 11/6 |
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Order Appliances (0)
|
|
|
-- |
-- |
Deck (0)
|
In process 11/16 |
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
set to poor stoop Thurs 2/20 Set to start poor sidewalk 2/17 Patio done 1/29 |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
In process 11/23 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
Complete except basement tub 12/18 |
|
-- |
-- |
Electric Rough In (4)
|
In process 12/18-said they will finish today |
|
-- |
-- |
Exterior Vinyl (0)
|
In process 1/29 |
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
In process 1/5 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
Mud/sanding 1/22 |
|
-- |
-- |
Paint 1 (1)
|
|
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
On site 2/1 |
|
-- |
-- |
Granite Installation (1)
|
2/25 |
|
-- |
-- |
Interior Trim - Install (3)
|
In process 2/5 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Needs grout 2/15 |
|
-- |
-- |
Paint 2 (3)
|
|
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
Kate to order 2/17 |
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
In process 3/11 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
paid and waiting to set meter 3/12 |
|
-- |
-- |
Set Water Meter (0)
|
Mon, Mar 16 |
|
-- |
-- |
Electric Trim Out (3)
|
In process 3/14 |
|
-- |
-- |
HVAC Trim Out (1)
|
Needs trim out 3/8 |
|
-- |
-- |
Plumbing Trim Out (2)
|
In process 3/8 |
|
-- |
-- |
Install Appliances (0)
|
Thursday 3/5- SS appliances (Black not available) buyer approved |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
Ready anytime Mar 2 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Marty Walters, March 13 |
|
-- |
-- |
Inspection (Final Building) (2)
|
|
|
-- |
-- |
Pre Walk Through (0)
|
Monday 3/23 4:30pm |
|
-- |
-- |
Cleaning (1)
|
Kelly knows and is starting 3/19 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Monday, March 23 at 4:30 PM; |
|
-- |
-- |
Payment for Upgrades (0)
|
$16,500 |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Closing (1)
|
Kim Roadcap at Stewart Title, Fri Mar 27 at 10AM; |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|