CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   CODED LOCKBOX 7575
--   --   $1000 in escrow at Members Title countertop, drywall, top soil
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Inspection (Final HVAC) (1)      
Tue    Dec 10      Inspection (Final Plumbing) (1)      
Wed    Dec 11      Inspection (Final Electric) (1)      
Thu    Dec 12      Stain Hardwood Stairs (1)      
Fri    Dec 13      Request Trash Tote From POA Manager (0)      
--   --   Brick- Charleston, Vinyl- Bone- Door Color- Gold
--   --   Electric rough in in basement started-does not look like planning for kitchenette 11/6
--   --   Basement window needed 11/13
--   --  
--   --   Double basement window not installed 12/1
--   --  
--   --   Stud needed in laundry room Tom
--   --   add dryer vent
--   --   Electrician-I don’t see wiring for snap lights in basement kitchen 1/11
--   --   Electrician-I don’t see wiring for snap lights in basement kitchen 1/11
--   --   Venting basement range? Kate is following up
--   --   Basement shower may need framing due to installation of plumbing for kitchenette 1/19
--   --   Venting microwave completed up/not in basement 1/19
--   --   Kitchenette appliances as well as a washer and dryer are going to be delivered on March 1 by Lowes. These will be placed in the garage or will we be ready for installation Tom? In basement 2/29
--   --   Placement of ductwork notice after paint 1 (court)
--   --   Mulch needed 2/29
--   --   Tape, mud, sand drywall on master bedroom ceiling
--   --   Drywall being finished 3/8 Guys say to paint 1 3/10
--   --   Dryer vent cover needed 3/14
--   --   Cover upstairs hardwood 3/25
--   --   Cabinets and appliances removed? Cabinets removed 3/29
--   --   Key back in lockbox?
--   --   Townhouse back on the market?
--   --   Touch up front door 4/1 Today 5/14
--   --   Shoe Mold in kitchen David said there was a good fit with the vanities GWB
--   --   Attic cover needed 4/12
--   --   Pressure wash front (paint on brick) 4/19 JB Tom to bring power washer
--   --   Attic cover needed 4/22 JB
--   --  
--   --   NO FLOORING IN BASEMENT
--   --   Carpet on stairs week of May 4
--   --   Basement deadbolt doesn’t lock 4/29 Just missing weather stripping
--   --   Issue with size of kitchen island countertop? New counter to be installed on May 5 or 6
--   --   Water entry through front foundation wall danny Set to fix and talked to homeowner
--   --   Stain steps to upstairs 5/3 Stained/need poly 5/9
--   --   Set fridge 5/9
--   --   Plumbing basement shower needed 5/9 Bobby should have done last Friday. Greg will double check
--   --   Trim needed in basement 5/9 Missing one piece. set to finish today 5/13
--   --  
--   --   Second coat of poly on stairs Set to finish today 5/13
--   --   Lightbulbs needed in vanity up 5/13 Will put in today 5/14
--   --   Electric trim out needed 5/13 Finishing today 5/14
--   --   Attic cover needed 5/13 Just needs painted 5/17
--   --   Handrails needed 5/13 Installing today 5/14 waiting on poly to dry
--   --   Final clean happening monday 5/18
--   --   Final touch up paint Issac, Monday 5/18
--   --   Mulch and replant front porch area Pettit
--   --   Door stop behind main level bath Ron will finish 5/19
--   --   Poor pad in rear 12x18
--   --   Patch drywall in basement bonus room Joe put in contact with Realtor 6/19
--   --   Replace trim in basement bonus room
--   --   Replace trim in basement bonus room Will fix a few months after closing
--   --   Pour pad in rear 12x18 Set to pour Monday morning 5/18
--   --   Replace trim in basement bonus room
--   --   Add fan switches to upstairs bedrooms Patrick taking care of it today 5/18
--   --   Replace weather stripping front door JB
--   --   One deck board sticking up JB
--   --   Replace 3 kitchen handles that appear damaged Kimberly ordered
--   --   Add sealing to windows noted in inspection
--   --   Fix leak on master shower head Bobby on it. 5/18
--   --   Inspect leak above kitchen in the mast bath. Likely a similar leak from previous Bobby made aware 5/18
--   --   Check locks on basement door are sealing properly
--   --   Add gutter downspout in rear Pieces on site to be put back
--   --   Chip in upstairs guest vanity Set to install today 6/22 GWB
--   --  
--   --   Put back in screen door
--   --   Paint over patch in kitchen
--   --   Chip in bathtub Kevin in contact with Nina setting to repair Monday 6/1
--   --   Final-Final touch up paint happening now 5/21 Issac
--   --   noise in plumbing? Scott to email Nina about issue
--   --   Fix yard in process 6/10
--   --   Caulk between brick and vinyl in frony
--   --   Caulk between brick and vinyl in front
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)       Basement window needs installed 11/23
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       Basement plumbing needed 1/8
-- -- Electric Rough In (4)       In process 1/1
-- -- Exterior Vinyl (0) *        Almost complete 2/1
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Almost complete 2/1
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       Pushed back, waiting on Drywall
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Install should be complete 3/17
-- -- Granite Installation (1) *        April 28
-- -- Interior Trim - Install (3)       In process 3/14
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        Week of Apr 27
-- -- Luxury Vinyl Tile (0)       Joe starting 3/11 to 3/12
-- -- Paint 2 (3)       Should be finished by 4/21 gwb
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)       Kate submitted to be ordered on 3/2
-- -- Shoe Moulding (0)       On site 3/29
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Shelving to start 4/22 GWB
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Water check cut. waiting to deliver
-- -- Set Water Meter (0)       to be set on Tues. 5/12
-- -- Electric Trim Out (3)       Waiting on two sconce lights
-- -- HVAC Trim Out (1)       Needs trim Out in basement only 4/29
-- -- Plumbing Trim Out (2)       Bobby said to start this week gwb
-- -- Install Appliances (0) *        In process 4/29
-- -- Paint 3 (2) *        should start today 5/13-in process 5/13
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Thursday, May 14 in the afternoon
-- -- Pre Walk Through (0)       Morning of 5/15 Greg
-- -- Cleaning (1)       Started 5/13
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       Moved to Friday
-- -- Buyer Walk Through (1)       Set for Friday 5/15 time pending
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       Jayne Miller at Members Title (PVFCU on 42 North)
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)