CODED LOCKBOX 7575 |
|
|
-- |
-- |
$1000 in escrow at Members Title |
countertop, drywall, top soil |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Brick- Charleston, Vinyl- Bone- Door Color- Gold |
|
|
-- |
-- |
Electric rough in in basement started-does not look like planning for kitchenette 11/6 |
|
|
-- |
-- |
Basement window needed 11/13 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Double basement window not installed 12/1 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Stud needed in laundry room |
Tom |
|
-- |
-- |
add dryer vent |
|
|
-- |
-- |
Electrician-I don’t see wiring for snap lights in basement kitchen 1/11 |
|
|
-- |
-- |
Electrician-I don’t see wiring for snap lights in basement kitchen 1/11 |
|
|
-- |
-- |
Venting basement range? |
Kate is following up |
|
-- |
-- |
Basement shower may need framing due to installation of plumbing for kitchenette 1/19 |
|
|
-- |
-- |
Venting microwave completed up/not in basement 1/19 |
|
|
-- |
-- |
Kitchenette appliances as well as a washer and dryer are going to be delivered on March 1 by Lowes. These will be placed in the garage or will we be ready for installation Tom? |
In basement 2/29 |
|
-- |
-- |
Placement of ductwork notice after paint 1 (court) |
|
|
-- |
-- |
Mulch needed 2/29 |
|
|
-- |
-- |
Tape, mud, sand drywall on master bedroom ceiling |
|
|
-- |
-- |
Drywall being finished 3/8 |
Guys say to paint 1 3/10 |
|
-- |
-- |
Dryer vent cover needed 3/14 |
|
|
-- |
-- |
Cover upstairs hardwood 3/25 |
|
|
-- |
-- |
Cabinets and appliances removed? |
Cabinets removed 3/29 |
|
-- |
-- |
Key back in lockbox? |
|
|
-- |
-- |
Townhouse back on the market? |
|
|
-- |
-- |
Touch up front door 4/1 |
Today 5/14 |
|
-- |
-- |
Shoe Mold in kitchen |
David said there was a good fit with the vanities GWB |
|
-- |
-- |
Attic cover needed 4/12 |
|
|
-- |
-- |
Pressure wash front (paint on brick) 4/19 |
JB Tom to bring power washer |
|
-- |
-- |
Attic cover needed 4/22 |
JB |
|
-- |
-- |
|
|
|
-- |
-- |
NO FLOORING IN BASEMENT |
|
|
-- |
-- |
Carpet on stairs |
week of May 4 |
|
-- |
-- |
Basement deadbolt doesn’t lock 4/29 |
Just missing weather stripping |
|
-- |
-- |
Issue with size of kitchen island countertop? |
New counter to be installed on May 5 or 6 |
|
-- |
-- |
Water entry through front foundation wall |
danny Set to fix and talked to homeowner |
|
-- |
-- |
Stain steps to upstairs 5/3 |
Stained/need poly 5/9 |
|
-- |
-- |
Set fridge 5/9 |
|
|
-- |
-- |
Plumbing basement shower needed 5/9 |
Bobby should have done last Friday. Greg will double check |
|
-- |
-- |
Trim needed in basement 5/9 |
Missing one piece. set to finish today 5/13 |
|
-- |
-- |
|
|
|
-- |
-- |
Second coat of poly on stairs |
Set to finish today 5/13 |
|
-- |
-- |
Lightbulbs needed in vanity up 5/13 |
Will put in today 5/14 |
|
-- |
-- |
Electric trim out needed 5/13 |
Finishing today 5/14 |
|
-- |
-- |
Attic cover needed 5/13 |
Just needs painted 5/17 |
|
-- |
-- |
Handrails needed 5/13 |
Installing today 5/14 waiting on poly to dry |
|
-- |
-- |
Final clean |
happening monday 5/18 |
|
-- |
-- |
Final touch up paint |
Issac, Monday 5/18 |
|
-- |
-- |
Mulch and replant front porch area |
Pettit |
|
-- |
-- |
Door stop behind main level bath |
Ron will finish 5/19 |
|
-- |
-- |
Poor pad in rear 12x18 |
|
|
-- |
-- |
Patch drywall in basement bonus room |
Joe put in contact with Realtor 6/19 |
|
-- |
-- |
Replace trim in basement bonus room |
|
|
-- |
-- |
Replace trim in basement bonus room |
Will fix a few months after closing |
|
-- |
-- |
Pour pad in rear 12x18 |
Set to pour Monday morning 5/18 |
|
-- |
-- |
Replace trim in basement bonus room |
|
|
-- |
-- |
Add fan switches to upstairs bedrooms |
Patrick taking care of it today 5/18 |
|
-- |
-- |
Replace weather stripping front door |
JB |
|
-- |
-- |
One deck board sticking up |
JB |
|
-- |
-- |
Replace 3 kitchen handles that appear damaged |
Kimberly ordered |
|
-- |
-- |
Add sealing to windows noted in inspection |
|
|
-- |
-- |
Fix leak on master shower head |
Bobby on it. 5/18 |
|
-- |
-- |
Inspect leak above kitchen in the mast bath. Likely a similar leak from previous |
Bobby made aware 5/18 |
|
-- |
-- |
Check locks on basement door are sealing properly |
|
|
-- |
-- |
Add gutter downspout in rear |
Pieces on site to be put back |
|
-- |
-- |
Chip in upstairs guest vanity |
Set to install today 6/22 GWB |
|
-- |
-- |
|
|
|
-- |
-- |
Put back in screen door |
|
|
-- |
-- |
Paint over patch in kitchen |
|
|
-- |
-- |
Chip in bathtub |
Kevin in contact with Nina setting to repair Monday 6/1 |
|
-- |
-- |
Final-Final touch up paint |
happening now 5/21 Issac |
|
-- |
-- |
noise in plumbing? |
Scott to email Nina about issue |
|
-- |
-- |
Fix yard |
in process 6/10 |
|
-- |
-- |
Caulk between brick and vinyl in frony |
|
|
-- |
-- |
Caulk between brick and vinyl in front |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
Basement window needs installed 11/23 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Basement plumbing needed 1/8 |
|
-- |
-- |
Electric Rough In (4) |
In process 1/1 |
|
-- |
-- |
Exterior Vinyl (0) * |
Almost complete 2/1 |
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Almost complete 2/1 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
Pushed back, waiting on Drywall |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Install should be complete 3/17 |
|
-- |
-- |
Granite Installation (1) * |
April 28 |
|
-- |
-- |
Interior Trim - Install (3) |
In process 3/14 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Week of Apr 27 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
Joe starting 3/11 to 3/12 |
|
-- |
-- |
Paint 2 (3) |
Should be finished by 4/21 gwb |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Kate submitted to be ordered on 3/2 |
|
-- |
-- |
Shoe Moulding (0) |
On site 3/29 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Shelving to start 4/22 GWB |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Water check cut. waiting to deliver |
|
-- |
-- |
Set Water Meter (0) |
to be set on Tues. 5/12 |
|
-- |
-- |
Electric Trim Out (3) |
Waiting on two sconce lights |
|
-- |
-- |
HVAC Trim Out (1) |
Needs trim Out in basement only 4/29 |
|
-- |
-- |
Plumbing Trim Out (2) |
Bobby said to start this week gwb |
|
-- |
-- |
Install Appliances (0) * |
In process 4/29 |
|
-- |
-- |
Paint 3 (2) * |
should start today 5/13-in process 5/13 |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Thursday, May 14 in the afternoon |
|
-- |
-- |
Pre Walk Through (0) |
Morning of 5/15 Greg |
|
-- |
-- |
Cleaning (1) |
Started 5/13 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
Moved to Friday |
|
-- |
-- |
Buyer Walk Through (1) |
Set for Friday 5/15 time pending |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
Jayne Miller at Members Title (PVFCU on 42 North) |
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|