--   --   CODED LOCKBOX 7575
--   --   $1000 in escrow at Members Title countertop, drywall, top soil
Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Inspection (Final HVAC) (1)      
Fri    Dec 26      Inspection (Final Plumbing) (1)      
Mon    Dec 29      Inspection (Final Electric) (1)      
Tue    Dec 30      Stain Hardwood Stairs (1) *       
Wed    Dec 31      Request Trash Tote From POA Manager (0)      
--   --   Brick- Charleston, Vinyl- Bone- Door Color- Gold
--   --   Electric rough in in basement started-does not look like planning for kitchenette 11/6
--   --   Basement window needed 11/13
--   --  
--   --   Double basement window not installed 12/1
--   --  
--   --   Stud needed in laundry room Tom
--   --   add dryer vent
--   --   Electrician-I don’t see wiring for snap lights in basement kitchen 1/11
--   --   Electrician-I don’t see wiring for snap lights in basement kitchen 1/11
--   --   Venting basement range? Kate is following up
--   --   Basement shower may need framing due to installation of plumbing for kitchenette 1/19
--   --   Venting microwave completed up/not in basement 1/19
--   --   Kitchenette appliances as well as a washer and dryer are going to be delivered on March 1 by Lowes. These will be placed in the garage or will we be ready for installation Tom? In basement 2/29
--   --   Placement of ductwork notice after paint 1 (court)
--   --   Mulch needed 2/29
--   --   Tape, mud, sand drywall on master bedroom ceiling
--   --   Drywall being finished 3/8 Guys say to paint 1 3/10
--   --   Dryer vent cover needed 3/14
--   --   Cover upstairs hardwood 3/25
--   --   Cabinets and appliances removed? Cabinets removed 3/29
--   --   Key back in lockbox?
--   --   Townhouse back on the market?
--   --   Touch up front door 4/1 Today 5/14
--   --   Shoe Mold in kitchen David said there was a good fit with the vanities GWB
--   --   Attic cover needed 4/12
--   --   Pressure wash front (paint on brick) 4/19 JB Tom to bring power washer
--   --   Attic cover needed 4/22 JB
--   --  
--   --   NO FLOORING IN BASEMENT
--   --   Carpet on stairs week of May 4
--   --   Basement deadbolt doesn’t lock 4/29 Just missing weather stripping
--   --   Issue with size of kitchen island countertop? New counter to be installed on May 5 or 6
--   --   Water entry through front foundation wall danny Set to fix and talked to homeowner
--   --   Stain steps to upstairs 5/3 Stained/need poly 5/9
--   --   Set fridge 5/9
--   --   Plumbing basement shower needed 5/9 Bobby should have done last Friday. Greg will double check
--   --   Trim needed in basement 5/9 Missing one piece. set to finish today 5/13
--   --  
--   --   Second coat of poly on stairs Set to finish today 5/13
--   --   Lightbulbs needed in vanity up 5/13 Will put in today 5/14
--   --   Electric trim out needed 5/13 Finishing today 5/14
--   --   Attic cover needed 5/13 Just needs painted 5/17
--   --   Handrails needed 5/13 Installing today 5/14 waiting on poly to dry
--   --   Final clean happening monday 5/18
--   --   Final touch up paint Issac, Monday 5/18
--   --   Mulch and replant front porch area Pettit
--   --   Door stop behind main level bath Ron will finish 5/19
--   --   Poor pad in rear 12x18
--   --   Patch drywall in basement bonus room Joe put in contact with Realtor 6/19
--   --   Replace trim in basement bonus room
--   --   Replace trim in basement bonus room Will fix a few months after closing
--   --   Pour pad in rear 12x18 Set to pour Monday morning 5/18
--   --   Replace trim in basement bonus room
--   --   Add fan switches to upstairs bedrooms Patrick taking care of it today 5/18
--   --   Replace weather stripping front door JB
--   --   One deck board sticking up JB
--   --   Replace 3 kitchen handles that appear damaged Kimberly ordered
--   --   Add sealing to windows noted in inspection
--   --   Fix leak on master shower head Bobby on it. 5/18
--   --   Inspect leak above kitchen in the mast bath. Likely a similar leak from previous Bobby made aware 5/18
--   --   Check locks on basement door are sealing properly
--   --   Add gutter downspout in rear Pieces on site to be put back
--   --   Chip in upstairs guest vanity Set to install today 6/22 GWB
--   --  
--   --   Put back in screen door
--   --   Paint over patch in kitchen
--   --   Chip in bathtub Kevin in contact with Nina setting to repair Monday 6/1
--   --   Final-Final touch up paint happening now 5/21 Issac
--   --   noise in plumbing? Scott to email Nina about issue
--   --   Fix yard in process 6/10
--   --   Caulk between brick and vinyl in frony
--   --   Caulk between brick and vinyl in front
-- -- Building Permit (30) *       
    Venting microwaves upper and lower kitchens  
-- -- Order Roof & Floor Trusses (1)      
    Basement kitchenette lighting- 2 snap lights in ceiling  
    Crown molding main level  
    Additional insulation in basement ceiling toward soundproofing  
    Additional charge for installing buyer appliances (Kate to confirm with CJ)  
    Expanded Deck (to 12x18)  
    Privacy panel on the right side of the deck  
    12 x 18 Patio  
    Privacy panel on the right side of the patio  
    Hide all plumbing rough-ins for the kitchenette in the basement in the wall for an option for finishing later  
    Possible expanded countertop on kitchen island ($500 allowance)  
    Buyers to select wall paint color, granite countertop  
-- -- Order Windows & Doors (0)      
    Upgrade slider to french door in basement  
    Double window in basement  
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
    Fully finished basement with full bathroom  
-- -- Install Stairs (0) *       
    Oak Treads to second level  
-- -- Windows & Doors (0) *        Basement window needs installed 11/23
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
    Master Bath Upgraded Cabinetry  
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)       Basement plumbing needed 1/8
    Added closet and washer dryer hook up in basement  
-- -- Electric Rough In (4)       In process 1/1
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *        Almost complete 2/1
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Almost complete 2/1
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       Pushed back, waiting on Drywall
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Install should be complete 3/17
-- -- Granite Installation (1) *        April 28
-- -- Interior Trim - Install (3) *        In process 3/14
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        Week of Apr 27
-- -- Luxury Vinyl Tile (0)       Joe starting 3/11 to 3/12
-- -- Paint 2 (3)       Should be finished by 4/21 gwb
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)       Kate submitted to be ordered on 3/2
-- -- Shoe Moulding (0)       On site 3/29
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Shelving to start 4/22 GWB
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Water check cut. waiting to deliver
-- -- Set Water Meter (0) *        to be set on Tues. 5/12
-- -- Electric Trim Out (3) *        Waiting on two sconce lights
-- -- HVAC Trim Out (1) *        Needs trim Out in basement only 4/29
-- -- Plumbing Trim Out (2) *        Bobby said to start this week gwb
-- -- Install Appliances (0) *        In process 4/29
-- -- Paint 3 (2) *        should start today 5/13-in process 5/13
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Thursday, May 14 in the afternoon
-- -- Pre Walk Through (0)       Morning of 5/15 Greg
-- -- Cleaning (1)       Started 5/13
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)       Moved to Friday
-- -- Buyer Walk Through (1) *        Set for Friday 5/15 time pending
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       Jayne Miller at Members Title (PVFCU on 42 North)
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)