Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
|
-- |
-- |
Finished basement - details TBD |
|
|
-- |
-- |
Pocket doors-Upstairs master bathroom upstairs laundry room main floor pantry in powder bath basement floor bedroom and bathroom |
|
|
-- |
-- |
Pocket doors- basement bath, Powder bath, pantry, laundry room, master bath |
|
|
-- |
-- |
Kate - update pricing for lighting upgrades |
4 cans in bonus, under cabinet in kitchen |
|
-- |
-- |
Edgecomb Gray- all bathroom walls |
|
|
-- |
-- |
Portsmouth Brick, Country Beige Vinyl Green Door |
|
|
-- |
-- |
Tilted basement wall? 3/29 |
HVAC company appears to have moved it |
|
-- |
-- |
Non-refundable deposit to avoid appraisal issues? |
|
|
-- |
-- |
Basement bonus room appears to have sound-proofing insulation all around 5/3. Living room (main level) has standard insulation. |
|
|
-- |
-- |
Door Color- Light Gray- Kate to confirm with Isaac |
BM Gray Huskie 1473 |
|
-- |
-- |
Missing door to garage |
On site. Needs installed 7/15 |
|
-- |
-- |
Tile for shower-on site? 7/1 |
Classic should have delivered it GWB |
|
-- |
-- |
Classic delivery in LR 7/4 |
|
|
-- |
-- |
Broken farmhouse sink 7/12 |
Farm sink coming in today. Should be set friday 7/17 GWB |
|
-- |
-- |
I see all kitchen upgrades except trash pull out 7/15 |
Jeff to order new hardware. It never came with it GWB |
|
-- |
-- |
Take out bathroom shower tile |
joe working today 7/27 |
|
-- |
-- |
Trash can pull out added |
Classic has it. waiting on installer. 8/11 GWB |
|
-- |
-- |
Peephole needed and door pull to interior garage door |
Ron knows to install |
|
-- |
-- |
Trim needed foyer area |
Issac to install Monday 8/10 |
|
-- |
-- |
Herringbone pattern tile in master bath |
Joe to tile 8/4 GWB-needs grout 8/5 |
|
-- |
-- |
Stain 2 sets of steps |
In process 8/2 |
|
-- |
-- |
Two plugs on kitchen island |
added 8/2 GWB |
|
-- |
-- |
Trim pieces for 1/2 bath vanity needed |
Issac to install Monday 8/10 |
|
-- |
-- |
Trim in hall bath needed |
Issac to install Monday 8/10 |
|
-- |
-- |
Touch up paint 8/5 |
|
|
-- |
-- |
Ceiling blemishes in bonus room |
|
|
-- |
-- |
Cabinet door adjustments |
Few never cabinets/don’t stay closed |
|
-- |
-- |
Stove drawer issue? |
CJ to check on 8/11 |
|
-- |
-- |
Seed/straw removed concrete areas 8/5 |
|
|
-- |
-- |
RED DOOR |
Galindez to paint 8/17 GWB |
|
-- |
-- |
|
|
|
-- |
-- |
Trim in basement bath needed |
Issac to install Monday 8/10 |
|
-- |
-- |
Few sink drains missing |
Drains on order. Hawkeye to install 8/10 |
|
-- |
-- |
Speakers for bonus room? |
Wires installed |
|
-- |
-- |
Drain pans for washer/dryer (in garage) |
|
|
-- |
-- |
HVAC trim out partially complete 8/8 |
Set to finish 8/11 GWB |
|
-- |
-- |
Set mirror |
Ron install 8/10 |
|
-- |
-- |
Install new microwave |
CJ to install 8/11 |
|
-- |
-- |
Fillers for bathroom vanity |
On order from Classic |
|
-- |
-- |
Powder Pocket door seems high l? |
|
|
-- |
-- |
Powder Pocket door seems high |
|
|
-- |
-- |
Make sure garage door opener works |
|
|
-- |
-- |
Caulk and paint trim |
|
|
-- |
-- |
Adjust doors to utility room |
|
|
-- |
-- |
Door plugs |
|
|
-- |
-- |
Patch hole in living room |
In process 8/12 |
|
-- |
-- |
Quarter round on all bathroom vanities |
|
|
-- |
-- |
Quarter round on all bathroom vanities |
|
|
-- |
-- |
Back deadbolt doesn’t line up |
|
|
-- |
-- |
Home Inspection - Aug 20 at 10AM |
Brad Van Horn |
|
-- |
-- |
Final Walk Through - Aug 24 |
with buyer at 11:30 AM |
|
-- |
-- |
Handrails put back on |
Galindez GWB |
|
-- |
-- |
Dining room light needs bulbs |
Greg will put bulbs in. |
|
-- |
-- |
Paint touch up |
Galindez |
|
-- |
-- |
Pull up cardboard on floors 8/19 |
Jill today 8/19 |
|
-- |
-- |
Few paint dings on MB vanity. Touch up pen should conceal. 8/19 |
Greg will use Touch up kit to conceal GWB |
|
-- |
-- |
Lightbulbs in dining room 8/19 |
|
|
-- |
-- |
Remove large subdivision site signs |
Tom |
|
-- |
-- |
Few nail holes to putty on steps 8/23 |
|
|
-- |
-- |
Coded lockbox 4343 |
|
|
-- |
-- |
Paint touch up |
Galindez scheduled for the week of 9/1 GWB |
|
-- |
-- |
Fix j channels on windows. |
Greg Sigmon - today, September 14 |
|
-- |
-- |
Re-caulk front door |
JB - rain pending |
|
-- |
-- |
Caulk around rear door |
JB - rain pending |
|
-- |
-- |
Caulk around rear door |
|
|
-- |
-- |
Bill Polen 703-343-3846 |
|
|
-- |
-- |
Fix drywall in master bedroom |
Joe to fix 11/11 GWB |
|
-- |
-- |
Semi Frameless shower door master bath |
Might have been installed on Friday, Sep 4 - Greg will check |
|
-- |
-- |
pin hole in tub |
|
|
-- |
-- |
Nail pops (ceiling of upper steps and upstairs wall between bath & laundry room) |
|
|
-- |
-- |
Three windows in LR have marks between the glass seals, need replacing |
|
|
-- |
-- |
Electric wall switches in bathroom (2nd level bath & upper level bath need to be changed so overhead light switch is first switch that is turned on) |
|
|
-- |
-- |
2nd level hall bath molding has moved away from wall and needs adjusting. |
|
|
-- |
-- |
Shoe molding under the vanity needs to be installed properly |
|
|
-- |
-- |
Ceiling in LR over bottom stairs has a seam that has popped out and needs to be repaired |
|
|
-- |
-- |
Adjustment of the garage door track |
|
|
-- |
-- |
Water pressure on both outside hose bibs needs adjusting |
|
|
-- |
-- |
Tile in basement bathroom is cracked (under toilet) |
|
|
-- |
-- |
Ceiling in kitchen needs retaping/sanded/painted |
|
|
-- |
-- |
Driveway cement cracks |
|
|
-- |
-- |
Back steps not code size. |
|
|
-- |
-- |
Back steps not code size. |
|
|
-- |
-- |
Gutter installation |
|
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
in process 3/11 |
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Order Appliances (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
12x18 patio |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
In process again 4/22 |
|
-- |
-- |
Electric Rough In (4)
|
In process 4/29 |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
4/30 |
|
-- |
-- |
Inspection (Insulation) (1)
|
Monday, May 4 |
|
-- |
-- |
Inspection (Electric Service) (0)
|
basments hooked up of all units. wiring rest of the houses this week |
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
Doors ordered waiting to order Trim |
|
-- |
-- |
Drywall (Hang) (4)
|
In process 5/17 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
6/17 |
|
-- |
-- |
Paint 1 (1)
|
Issac set to start 6/22 GWB pushed back due to Drywall not being ready |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
All electrical outlets have been added |
|
-- |
-- |
Cabinet Installation (2)
|
Set to install 7/3 GWB |
|
-- |
-- |
Granite Installation (1)
|
Set to install 7/30 GWB per Cathy Pitts GWB |
|
-- |
-- |
Interior Trim - Install (3)
|
Completed except crown 6/28 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
Plumbing fixtures onsite 7/6 need a box of snap lights and 4 ceiling fans GWB |
|
-- |
-- |
Luxury Vinyl Plank (3)
|
Set to finish today 7/16 GWB |
|
-- |
-- |
Luxury Vinyl Tile (0)
|
On site 6/28 Joe installing today 6/29 |
|
-- |
-- |
Paint 2 (3)
|
greg investigating.. |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
plumbing set to deliver 6/29 |
|
-- |
-- |
Shoe Moulding (0)
|
Issac to install Monday 8/10 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
started 7/15 GWB |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
waiting on permeant door lock |
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
Pending approval form city 7/5 |
|
-- |
-- |
Electric Trim Out (3)
|
In process 7/29 GWB |
|
-- |
-- |
HVAC Trim Out (1)
|
HVAC onsite 6/24 |
|
-- |
-- |
Plumbing Trim Out (2)
|
Few missing. Mostly complete 8/8 |
|
-- |
-- |
Install Appliances (0)
|
Installing today 8/3 |
|
-- |
-- |
Paint 3 (2)
|
Galindez set to complete 7/20 or 7/21 |
|
-- |
-- |
Carpet (2)
|
set to install 7/16 GWB |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
August 4/5 hopefully |
|
-- |
-- |
Pre Walk Through (0)
|
Greg 8/11 GWB |
|
-- |
-- |
Cleaning (1)
|
In process 8/15 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
Closing set for 8/25 |
|
-- |
-- |
Buyer Walk Through (1)
|
set for 8/19 GWB per Luke |
|
-- |
-- |
Payment for Upgrades (0)
|
|
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
|
|
|
-- |
-- |
Closing (1)
|
Tuesday, August 25, 10AM at WVT |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|