--   --   Driveway
--   --   Sod
--   --   Curb & Gutter
--   --   Muddy area in backyard
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Order Tubs / Showers (0)      
Thu    May 1      Framing II (8)      
Tue    May 13      Framing III (8) *       
Fri    May 23      Verify Window & Roof Structure (0)      
Fri    May 23      Install Stairs (0)      
Fri    May 23      House Number and Status in Window (0)      
Fri    May 23      Order Appliances (0)      
Fri    May 23      Patio (0)      
Fri    May 23      Rough In Microwave Vent (0)      
Fri    May 23      Inspection (Rough In Plumbing) (1)      
Mon    May 26      Inspection (Rough In Electric) (1)      
Tue    May 27      Inspection (Deck Piers) (0)      
Tue    May 27      Inspection (Framing) (1) *       
Wed    May 28      Exterior Stone (0)      
Wed    May 28      Set Electric Meter (0) *       
Wed    May 28      Inspection (Main Water Line) (0)      
Wed    May 28      Loan Approval (0)      
Wed    May 28      Deed Preparation (0)      
Wed    May 28      Garage Door (0) *       
Wed    May 28      Mailbox (0)      
Wed    May 28      Order Plumbing / Lighting Fixtures (0)      
Wed    May 28      Interior Trim - Paint (1)      
Thu    May 29      Cover Floors (1)      
Fri    May 30      Deliver Plumbing / Lighting Fixtures (0)      
Fri    May 30      Shoe Moulding (0)      
Fri    May 30      Set Water Meter (0) *       
Fri    May 30      Ceiling Fans (0)      
Fri    May 30      Blower Door Test (1)      
Mon    Jun 2      Paint 3 (2) *       
Wed    Jun 4      Appraiser Confirms Construction Completion (0)      
Wed    Jun 4      Inspection (Final HVAC) (1)      
Thu    Jun 5      Inspection (Final Plumbing) (1)      
Fri    Jun 6      Inspection (Final Electric) (1)      
Mon    Jun 9      Stain Hardwood Stairs (1)      
Tue    Jun 10      C.O. to Lender (0)      
Tue    Jun 10      Schedule Closing (0)      
Tue    Jun 10      Payment for Upgrades (0)      
Tue    Jun 10      Keys to Settlement Agent (0)      
Tue    Jun 10      Review Settlement Statement (0)      
Tue    Jun 10      Jerry Signs Closing Documents (0)      
Tue    Jun 10      Request Trash Tote From POA Manager (0)      
Tue    Jun 10      Closing (1)      
Wed    Jun 11      Remove Coded Lockbox (0)      
--   --   Cover floors in kitchen
--   --   Please cover hardwood completely and granite
--   --   Closing by end of June very important
--   --   Cover granite
--   --   Please cover hardwood
--   --   Replace scratched boards by powder bathroom
--   --   Install refrigerator
--   --   Window Screens
--   --   Dimmer Switches / Dimmable light bulbs
--   --   Dimmable light buls
--   --   Dimmable light bulbs
--   --   Broken piece of wood in hall bathroom
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Windows & Doors (0) *       
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *        patio done; front stoop needed
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       S: Complete except basement bath;
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *        K: Almost done
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       In process
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        B: started (4/18)
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *       
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        K: in process 5/23
-- -- Luxury Vinyl Plank (3) *        Scott delete?
-- -- Luxury Vinyl Tile (0)       5/26: foyer needs grout;
-- -- Paint 2 (3)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Friday, June 10
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       Wed/Thurs
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Wed/Thurs
-- -- Install Appliances (0) *        K: 6/20 all but fridge
-- -- Carpet (2)       6/14 install
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)