| -- | -- | Driveway | ||
| -- | -- | Sod | ||
| -- | -- | Curb & Gutter | ||
| -- | -- | Muddy area in backyard | ||
| Tue | Dec 16 | Ratified Contract? (0) | ||
| Tue | Dec 16 | $2500 Deposit Received (0) | ||
| Tue | Dec 16 | Association Packet Requested (0) | ||
| Tue | Dec 16 | Association Packet Received (0) | ||
| Tue | Dec 16 | Selections Meeting (0) | ||
| Tue | Dec 16 | Selections Sheet Signed (0) | ||
| Tue | Dec 16 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Tue | Dec 16 | Deposit For Upgrades Received (0) | ||
| Tue | Dec 16 | Inspection (Concrete Wall) (1) | ||
| Wed | Dec 17 | Inspection (Conduit Under Slab) (1) | ||
| Thu | Dec 18 | Inspection (Drain Tile) (0) | ||
| Thu | Dec 18 | Settlement Agent Confirmed (0) | ||
| Thu | Dec 18 | Order Tubs / Showers (0) | ||
| Thu | Dec 18 | Framing II (8) | ||
| Tue | Dec 30 | Framing III (8) * | ||
| Fri | Jan 9 | Verify Window & Roof Structure (0) | ||
| Fri | Jan 9 | Install Stairs (0) * | ||
| Fri | Jan 9 | House Number and Status in Window (0) | ||
| Fri | Jan 9 | Order Appliances (0) | ||
| Fri | Jan 9 | Patio (0) | ||
| Fri | Jan 9 | Rough In Microwave Vent (0) | ||
| Fri | Jan 9 | Inspection (Rough In Plumbing) (1) | ||
| Mon | Jan 12 | Inspection (Rough In Electric) (1) | ||
| Tue | Jan 13 | Inspection (Framing) (1) * | ||
| Wed | Jan 14 | Inspection (Deck Piers) (0) | ||
| Wed | Jan 14 | Exterior Stone (0) | ||
| Wed | Jan 14 | Set Electric Meter (0) * | ||
| Wed | Jan 14 | Inspection (Main Water Line) (0) | ||
| Wed | Jan 14 | Loan Approval (0) | ||
| Wed | Jan 14 | Deed Preparation (0) | ||
| Wed | Jan 14 | Garage Door (0) | ||
| Wed | Jan 14 | Mailbox (0) | ||
| Wed | Jan 14 | Order Plumbing / Lighting Fixtures (0) | ||
| Wed | Jan 14 | Interior Trim - Paint (1) | ||
| Thu | Jan 15 | Cover Floors (1) | ||
| Fri | Jan 16 | Deliver Plumbing / Lighting Fixtures (0) | ||
| Fri | Jan 16 | Shoe Moulding (0) | ||
| Fri | Jan 16 | Set Water Meter (0) * | ||
| Fri | Jan 16 | Ceiling Fans (0) | ||
| Fri | Jan 16 | Blower Door Test (1) | ||
| Mon | Jan 19 | Paint 3 (2) * | ||
| Wed | Jan 21 | Appraiser Confirms Construction Completion (0) | ||
| Wed | Jan 21 | Inspection (Final HVAC) (1) | ||
| Thu | Jan 22 | Inspection (Final Plumbing) (1) | ||
| Fri | Jan 23 | Inspection (Final Electric) (1) | ||
| Mon | Jan 26 | Stain Hardwood Stairs (1) * | ||
| Tue | Jan 27 | C.O. to Lender (0) | ||
| Tue | Jan 27 | Schedule Closing (0) | ||
| Tue | Jan 27 | Payment for Upgrades (0) | ||
| Tue | Jan 27 | Keys to Settlement Agent (0) | ||
| Tue | Jan 27 | Review Settlement Statement (0) | ||
| Tue | Jan 27 | Jerry Signs Closing Documents (0) | ||
| Tue | Jan 27 | Request Trash Tote From POA Manager (0) | ||
| Tue | Jan 27 | Closing (1) | ||
| Wed | Jan 28 | Remove Coded Lockbox (0) | ||
| -- | -- | Cover floors in kitchen | ||
| -- | -- | Please cover hardwood completely and granite | ||
| -- | -- | Closing by end of June very important | ||
| -- | -- | Cover granite | ||
| -- | -- | Please cover hardwood | ||
| -- | -- | Replace scratched boards by powder bathroom | ||
| -- | -- | Install refrigerator | ||
| -- | -- | Window Screens | ||
| -- | -- | Dimmer Switches / Dimmable light bulbs | ||
| -- | -- | Dimmable light buls | ||
| -- | -- | Dimmable light bulbs | ||
| -- | -- | Broken piece of wood in hall bathroom | ||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | ||
| -- | -- | Order Steps (0) | ||
| -- | -- | Windows & Doors (0) * | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | ||
| -- | -- | Driveway (0) * | patio done; front stoop needed | |
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | ||
| -- | -- | Plumbing Rough In (4) | S: Complete except basement bath; | |
| -- | -- | Electric Rough In (4) | ||
| -- | -- | Inspection (Rough In HVAC) (1) | ||
| -- | -- | Exterior Vinyl (0) * | K: Almost done | |
| -- | -- | Insulation (2) * | ||
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | In process | |
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | ||
| -- | -- | Drywall (Hang) (4) * | B: started (4/18) | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | ||
| -- | -- | Paint 1 (1) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | ||
| -- | -- | Granite Installation (1) * | ||
| -- | -- | Interior Trim - Install (3) * | K: in process 5/23 | |
| -- | -- | Luxury Vinyl Plank (3) * | Scott delete? | |
| -- | -- | Luxury Vinyl Tile (0) | 5/26: foyer needs grout; | |
| -- | -- | Paint 2 (3) | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | Friday, June 10 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Electric Trim Out (3) * | Wed/Thurs | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | Wed/Thurs | |
| -- | -- | Install Appliances (0) * | K: 6/20 all but fridge | |
| -- | -- | Carpet (2) | 6/14 install | |
| -- | -- | Inspection (Final Building) (2) * | ||
| -- | -- | Pre Walk Through (0) | ||
| -- | -- | Cleaning (1) | ||
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | Buyer Walk Through (1) * | ||