ADDR
- 104  ::  2234 Lapis Lane
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
Client View In Progress....
---
 
Completed....
Framing changes - two master suite
Deadbolt
Expanded (12' x 18') patio
Maple flooring on main level
Hardwood treads from main level to bedroom level
Hardwood on bedroom level
Maple flooring on bedroom level
Stainless Steel Appliances
Bridgewater Cherry bathroom cabinets
(1) additional light / ceiling fan combo in 2nd master
Finish basement bonus room and half bathroom
Vanity upgrade in bridgewater cherry
CREDIT--- 3 elongated toilets
Basement electrical
Appliance installation
 
Deleted....
(3) elongated toilets
Elongated toilet in basement bathroom