Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Order Tubs / Showers (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Install Stairs (0) *       
Thu    Dec 18      House Number and Status in Window (0)      
Thu    Dec 18      Order Appliances (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Garage Door (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Order Plumbing / Lighting Fixtures (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Deliver Plumbing / Lighting Fixtures (0)      
Wed    Dec 24      Shoe Moulding (0)      
Wed    Dec 24      Set Water Meter (0) *       
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Paint 3 (2) *       
Mon    Dec 29      Appraiser Confirms Construction Completion (0)      
Mon    Dec 29      Inspection (Final HVAC) (1)      
Tue    Dec 30      Inspection (Final Plumbing) (1)      
Wed    Dec 31      Inspection (Final Electric) (1)      
Thu    Jan 1      Stain Hardwood Stairs (1) *       
Fri    Jan 2      C.O. to Lender (0)      
Fri    Jan 2      Schedule Closing (0)      
Fri    Jan 2      Payment for Upgrades (0)      
Fri    Jan 2      Keys to Settlement Agent (0)      
Fri    Jan 2      Review Settlement Statement (0)      
Fri    Jan 2      Jerry Signs Closing Documents (0)      
Fri    Jan 2      Request Trash Tote From POA Manager (0)      
Fri    Jan 2      Closing (1)      
Mon    Jan 5      Remove Coded Lockbox (0)      
--   --   Please cover granite
--   --   Clean garage
--   --   Touch up paint
--   --   Hall bath tile at door?
--   --   Master bath tile?
--   --   Ceiling fans-flip blades to darker side
--   --   Big squeak in floor outside second bedroom at top of stairs
--   --   Trim- consistently held up too high for carpet- discuss with Mitch
--   --   Trim in foyer
--   --   Up bedroom holes in trim to be filled painted
--   --   Install last two light fixtures
--   --   Vent cover in dining room
--   --   Tile/carpet
--   --   2 vent covers in living room
--   --   Eric reattach carpet
--   --   Hole at landing wall- fill and paint
--   --   Washer & Dryer
--   --   Need vinyl under stairs
--   --   Remove furniture
--   --   Paint touch up
--   --   Cleaning
--   --   Final walk through
--   --   Need mailbox keys
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0) *       
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *        patio done; front stoop needed
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Tuesday;
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        K: in process- asked me to order more materials
-- -- Paint 1 (1)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivery on 8/12, install 8/15
-- -- Granite Installation (1) *        Installed Sept 1
-- -- Interior Trim - Install (3) *        Mitch all week
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       8/6: tile in process (Jesse)
-- -- Paint 2 (3)       9/22 finishing paint
-- -- Cover Floors (1)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Nearly complete
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3) *        In process
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *       
-- -- Install Appliances (0) *        Sep 28
-- -- Carpet (2)       Sept 30
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Later this week and next weekend
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1) *