Painting and patching of doors |
Kate will tell Isaac |
|
-- |
-- |
Lisa = 540-746-8707, cwcoach80@yahoo.com |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Set Water Meter (0) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Carter's Grove Brick, Pearl Vinyl, Gold Door |
|
|
-- |
-- |
Replace door |
|
|
-- |
-- |
Replace Door Jam |
Tom to pick up at Monger's |
|
-- |
-- |
Surveyor to mark lot lines |
|
|
-- |
-- |
Move 2-foot vanity to powder room |
Mindy is doing this before Feb 23 |
|
-- |
-- |
Install 3-foot vanity in upstairs bathroom |
Waiting on correct vanity |
|
-- |
-- |
Tom said on Jan 30 we could be finished early. |
|
|
-- |
-- |
paint- see changes |
|
|
-- |
-- |
Waiting on fence decision from buyer |
|
|
-- |
-- |
HVAC running sounds loud to me |
Ronnie will check on this |
|
-- |
-- |
Paint touch up |
Saturday march 4 |
|
-- |
-- |
Install vanity in powder- |
CK 2/27 |
|
-- |
-- |
Confit |
|
|
-- |
-- |
Green front door |
|
|
-- |
-- |
Install heat lamp |
|
|
-- |
-- |
Fill and paint crown mounding |
|
|
-- |
-- |
Range to be installed |
|
|
-- |
-- |
Hall bath tub trim |
|
|
-- |
-- |
Scott slightly loose on stairs to loft |
|
|
-- |
-- |
Access door in loft to be installed |
|
|
-- |
-- |
Floor registers needed in loft |
|
|
-- |
-- |
Install handrails |
|
|
-- |
-- |
Finish cabinet in hall bathroom |
|
|
-- |
-- |
Sconce light loose on stairwell to loft |
|
|
-- |
-- |
Trim door jam |
|
|
-- |
-- |
Fill and paint crown moulding |
|
|
-- |
-- |
Secondary bath cabinetry - skin and trim |
|
|
-- |
-- |
Fix drywall hole in ceiling in hall bathroom |
|
|
-- |
-- |
Replace flush mount light in loft with snap light |
|
|
-- |
-- |
Paint touch up after drywall fix has been confirmed |
3/20 |
|
-- |
-- |
HVAC still sounds loud to me |
|
|
-- |
-- |
Alert buyer when home inspection should be scheduled |
|
|
-- |
-- |
CO to Scott (then to lender) when available |
|
|
-- |
-- |
Heat lamps to be installed in hall bathroom |
|
|
-- |
-- |
Home Inspection, Mar 28 @ 10AM |
|
|
-- |
-- |
Reverse installation of storm door |
|
|
-- |
-- |
Remove cardboard under the refrigerator |
|
|
-- |
-- |
Window screens needed |
|
|
-- |
-- |
Missing storm door doorbell needs to be adhered |
|
|
-- |
-- |
Install storm door |
|
|
-- |
-- |
Install door bell |
|
|
-- |
-- |
Buyer moves in April 7 |
|
|
-- |
-- |
Crack in patio |
Osbaldo |
|
-- |
-- |
Replace foundation plantings? |
Pettit will look at it in the Spring |
|
-- |
-- |
Replace three broken toilet paper holders |
Mindy will tell Lisa to call Ron |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
Monday May 16 |
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
3/6 in process |
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
K: 8/7: in process |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
8/29 in process |
|
-- |
-- |
Electric Rough In (4) |
Aug 30 |
|
-- |
-- |
Exterior Vinyl (0) * |
8/29 brick complete vinyl needed |
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
this week |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
Ben |
|
-- |
-- |
Cabinet Installation (2) * |
Delivery Nov 8, Install Nov 9 |
|
-- |
-- |
Granite Installation (1) * |
Mon, Nov 28 |
|
-- |
-- |
Interior Trim - Install (3) |
material on site |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In process |
|
-- |
-- |
Paint 2 (3) |
In process |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Waiting on buyer |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
3/6 need water to test and caulk |
|
-- |
-- |
Install Appliances (0) * |
February 14 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
Waiting on correct carpet |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Monday, Mar 27 |
|
-- |
-- |
Pre Walk Through (0) |
Monday 3/20 |
|
-- |
-- |
Cleaning (1) |
In process |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Monday 3/27 at 1:00 |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Closing (1) |
|
|