--   --   Glue off of transition strip in pantry Kelly
--   --   Put plugs in patio door Isaac
--   --   Small Nick in hall bath shower tub repair Mindy
--   --   Access panel in loft walk in Osbaldo
--   --   Need new weather stripping at front door Osbaldo - Friday (and back door)
--   --   Sidewalk hole? Tom
--   --   CODED LOCKBOX = 7134
--   --   Seal around duct in furnace room at ceiling Osbaldo
--   --   House and Mailbox Keys?
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Order Tubs / Showers (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Install Stairs (0)      
Mon    Dec 2      House Number and Status in Window (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Garage Door (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Deliver Plumbing / Lighting Fixtures (0)      
Fri    Dec 6      Shoe Moulding (0)      
Fri    Dec 6      Set Water Meter (0)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Paint 3 (2) *       
Wed    Dec 11      Appraiser Confirms Construction Completion (0)      
Wed    Dec 11      Inspection (Final HVAC) (1)      
Thu    Dec 12      Inspection (Final Plumbing) (1)      
Fri    Dec 13      Inspection (Final Electric) (1)      
Mon    Dec 16      Stain Hardwood Stairs (1)      
Tue    Dec 17      Cleaning (1)       Sat/Sun
Wed    Dec 18      C.O. to Lender (0)      
Wed    Dec 18      Schedule Closing (0)      
Wed    Dec 18      Payment for Upgrades (0)      
Wed    Dec 18      Keys to Settlement Agent (0)      
Wed    Dec 18      Review Settlement Statement (0)      
Wed    Dec 18      Jerry Signs Closing Documents (0)      
Wed    Dec 18      Request Trash Tote From POA Manager (0)      
Wed    Dec 18      Closing (1)       TUESDAY, MAY 23, 2017
Thu    Dec 19      Remove Coded Lockbox (0)      
--   --   Country Beige Vinyl, Green Door
--   --   Follow up with realtor on hall shower decision
--   --   Buyer wants access panel in closet Left note on site after door had been changed
--   --   Install shower through patio door Tuesday, February 14
--   --   Add 2 additional lengths of fence on right side to match 111 Week of 5/8- Tom please confirm with Premier
--   --   Caulk side splash in hall bathroom
--   --   Need to scrape and sweep the floors and get out all drywall materials so Mitch can begin trim
--   --   Cranberry red front door
--   --   Would like to close on May 12, 2017
--   --   Key stuck in front door
--   --   Laminate countertop against wall in dining room?
--   --   Drywall needed in pantry
--   --   Drywall needed upstairs???
--   --   Interior Trim in Bathrooms
--   --   Shoemold over weekend or Monday 8th Thu, May 11
--   --   Paint final coat 5/6-5/7
--   --   Paint 3- 5/9-5/10
--   --   Transition strip needed between kitchen tile and pantry vinyl Mindy to call Eric
--   --   Final paint Fri, May 12
--   --   Hoping to close by Friday 5/19...or Monday 5/21???
--   --   Cypress Trees Osbaldo
--   --   Fire extinguisher Osbaldo
--   --   HVAC - grill covers, condensate line
--   --   Push button locks
--   --   Storm Door Osbaldo - Friday
--   --   Appraiser Re-Visit Sandy Martin -- likely Wed, May 17
--   --   Insulate door to attic Osbaldo
--   --   Install screens and screen on patio door Kelly
--   --   Install storm door
--   --   Install electronic deadbolt Osbaldo
--   --   Shelving in pantry Ron Thursday morning
--   --   Install. Sanity
--   --   Install vanity Mindy
--   --   Light bulbs in dining chandelier Osbaldo - Friday
--   --   Missing bulbs in master bath Osbaldo - Friday
--   --   Cut hole in toe kick of loft kitchen Osbaldo - Friday
--   --   Washer drain
--   --   Receptacle on inside of closetall Harry
--   --   Snap light in pantry instead of flush mont Amy, Harry
--   --   Leave closing booklet Mindy
--   --   Front door seal top left corner Osbaldo - Friday
--   --   Closing Tuesday at 10AM
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Monday May 16
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)       Extend fence by two lengths
-- -- Sod / Seed / Landscaping (0)       Seed backyard and provide new landscape hedge
-- -- HVAC Rough In (4)       2/13 in process
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       2/13 in process-waiting on hall shower
-- -- Electric Rough In (4)       2/20 - Harry in process
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Complete by 3/14
-- -- Paint 1 (1)       3/15
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivered Thurs, Mar 23, Installed Mon, Mar 27
-- -- Granite Installation (1) *        4/10
-- -- Interior Trim - Install (3)       Done except for bathrooms- waiting on grout will finish 4/25
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       4/24 all needs to be grouted
-- -- Paint 2 (3)       Thursday 4/27
-- -- Cover Floors (1)       TODAY 5/3
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Week of May 1
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       By 5/12
-- -- HVAC Trim Out (1)       By Thu, Apr 27
-- -- Plumbing Trim Out (2)       5/9 in process
-- -- Install Appliances (0) *        5/11- confirm with Amy
-- -- Carpet (2)       5/8
-- -- Inspection (Final Building) (2) *        Wed, May 17
-- -- Pre Walk Through (0)       5/11 @10:30
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)       Wednesday 5/17?