- 112  ::  2247 Lapis Lane
[ BUILD: 16090091 ]       [ PLUMB: 16040134 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Glue off of transition strip in pantry Kelly
--   --   Put plugs in patio door Isaac
--   --   Small Nick in hall bath shower tub repair Mindy
--   --   Access panel in loft walk in Osbaldo
--   --   Need new weather stripping at front door Osbaldo - Friday (and back door)
--   --   Sidewalk hole? Tom
--   --   CODED LOCKBOX = 7134
--   --   Seal around duct in furnace room at ceiling Osbaldo
--   --   House and Mailbox Keys?
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Order Tubs / Showers (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Install Stairs (0)      
Thu    May 1      House Number and Status in Window (0)      
Thu    May 1      Order Appliances (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Garage Door (0) *       
Tue    May 6      Mailbox (0)      
Tue    May 6      Order Plumbing / Lighting Fixtures (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Deliver Plumbing / Lighting Fixtures (0)      
Wed    May 7      Shoe Moulding (0)      
Wed    May 7      Set Water Meter (0) *       
Wed    May 7      Ceiling Fans (0)      
Wed    May 7      Blower Door Test (1)      
Thu    May 8      Paint 3 (2) *       
Mon    May 12      Appraiser Confirms Construction Completion (0)      
Mon    May 12      Inspection (Final HVAC) (1)      
Tue    May 13      Inspection (Final Plumbing) (1)      
Wed    May 14      Inspection (Final Electric) (1)      
Thu    May 15      Stain Hardwood Stairs (1)      
Fri    May 16      Cleaning (1)       Sat/Sun
Mon    May 19      C.O. to Lender (0)      
Mon    May 19      Schedule Closing (0)      
Mon    May 19      Payment for Upgrades (0)      
Mon    May 19      Keys to Settlement Agent (0)      
Mon    May 19      Review Settlement Statement (0)      
Mon    May 19      Jerry Signs Closing Documents (0)      
Mon    May 19      Request Trash Tote From POA Manager (0)      
Mon    May 19      Closing (1)       TUESDAY, MAY 23, 2017
Tue    May 20      Remove Coded Lockbox (0)      
--   --   Country Beige Vinyl, Green Door
--   --   Follow up with realtor on hall shower decision
--   --   Buyer wants access panel in closet Left note on site after door had been changed
--   --   Install shower through patio door Tuesday, February 14
--   --   Add 2 additional lengths of fence on right side to match 111 Week of 5/8- Tom please confirm with Premier
--   --   Caulk side splash in hall bathroom
--   --   Need to scrape and sweep the floors and get out all drywall materials so Mitch can begin trim
--   --   Cranberry red front door
--   --   Would like to close on May 12, 2017
--   --   Key stuck in front door
--   --   Laminate countertop against wall in dining room?
--   --   Drywall needed in pantry
--   --   Drywall needed upstairs???
--   --   Interior Trim in Bathrooms
--   --   Shoemold over weekend or Monday 8th Thu, May 11
--   --   Paint final coat 5/6-5/7
--   --   Paint 3- 5/9-5/10
--   --   Transition strip needed between kitchen tile and pantry vinyl Mindy to call Eric
--   --   Final paint Fri, May 12
--   --   Hoping to close by Friday 5/19...or Monday 5/21???
--   --   Cypress Trees Osbaldo
--   --   Fire extinguisher Osbaldo
--   --   HVAC - grill covers, condensate line
--   --   Push button locks
--   --   Storm Door Osbaldo - Friday
--   --   Appraiser Re-Visit Sandy Martin -- likely Wed, May 17
--   --   Insulate door to attic Osbaldo
--   --   Install screens and screen on patio door Kelly
--   --   Install storm door
--   --   Install electronic deadbolt Osbaldo
--   --   Shelving in pantry Ron Thursday morning
--   --   Install. Sanity
--   --   Install vanity Mindy
--   --   Light bulbs in dining chandelier Osbaldo - Friday
--   --   Missing bulbs in master bath Osbaldo - Friday
--   --   Cut hole in toe kick of loft kitchen Osbaldo - Friday
--   --   Washer drain
--   --   Receptacle on inside of closetall Harry
--   --   Snap light in pantry instead of flush mont Amy, Harry
--   --   Leave closing booklet Mindy
--   --   Front door seal top left corner Osbaldo - Friday
--   --   Closing Tuesday at 10AM
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Monday May 16
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0) *       
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0)       Extend fence by two lengths
-- -- Sod / Seed / Landscaping (0)       Seed backyard and provide new landscape hedge
-- -- HVAC Rough In (4)       2/13 in process
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       2/13 in process-waiting on hall shower
-- -- Electric Rough In (4)       2/20 - Harry in process
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Complete by 3/14
-- -- Paint 1 (1)       3/15
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivered Thurs, Mar 23, Installed Mon, Mar 27
-- -- Granite Installation (1) *        4/10
-- -- Interior Trim - Install (3) *        Done except for bathrooms- waiting on grout will finish 4/25
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       4/24 all needs to be grouted
-- -- Paint 2 (3)       Thursday 4/27
-- -- Cover Floors (1)       TODAY 5/3
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Week of May 1
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       By 5/12
-- -- HVAC Trim Out (1)       By Thu, Apr 27
-- -- Plumbing Trim Out (2)       5/9 in process
-- -- Install Appliances (0) *        5/11- confirm with Amy
-- -- Carpet (2)       5/8
-- -- Inspection (Final Building) (2) *        Wed, May 17
-- -- Pre Walk Through (0)       5/11 @10:30
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)       Wednesday 5/17?