- 112  ::  2247 Lapis Lane
[ BUILD: 16090091 ]       [ PLUMB: 16040134 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Glue off of transition strip in pantry Kelly
--   --   Put plugs in patio door Isaac
--   --   Small Nick in hall bath shower tub repair Mindy
--   --   Access panel in loft walk in Osbaldo
--   --   Need new weather stripping at front door Osbaldo - Friday (and back door)
--   --   Sidewalk hole? Tom
--   --   CODED LOCKBOX = 7134
--   --   Seal around duct in furnace room at ceiling Osbaldo
--   --   House and Mailbox Keys?
Fri    Sep 20      Ratified Contract? (0)      
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Inspection (Concrete Wall) (1)      
Mon    Sep 23      Inspection (Conduit Under Slab) (1)      
Tue    Sep 24      Inspection (Drain Tile) (0)      
Tue    Sep 24      Settlement Agent Confirmed (0)      
Tue    Sep 24      Order Tubs / Showers (0)      
Tue    Sep 24      Verify Window & Roof Structure (0)      
Tue    Sep 24      Install Stairs (0)      
Tue    Sep 24      House Number and Status in Window (0)      
Tue    Sep 24      Order Appliances (0)      
Tue    Sep 24      Patio (0)      
Tue    Sep 24      Rough In Microwave Vent (0)      
Tue    Sep 24      Inspection (Rough In Plumbing) (1)      
Wed    Sep 25      Inspection (Rough In Electric) (1)      
Thu    Sep 26      Inspection (Deck Piers) (0)      
Thu    Sep 26      Inspection (Framing) (1)      
Fri    Sep 27      Exterior Stone (0)      
Fri    Sep 27      Set Electric Meter (0)      
Fri    Sep 27      Inspection (Main Water Line) (0)      
Fri    Sep 27      Loan Approval (0)      
Fri    Sep 27      Deed Preparation (0)      
Fri    Sep 27      Garage Door (0)      
Fri    Sep 27      Mailbox (0)      
Fri    Sep 27      Order Plumbing / Lighting Fixtures (0)      
Fri    Sep 27      Interior Trim - Paint (1)      
Mon    Sep 30      Deliver Plumbing / Lighting Fixtures (0)      
Mon    Sep 30      Shoe Moulding (0)      
Mon    Sep 30      Set Water Meter (0)      
Mon    Sep 30      Ceiling Fans (0)      
Mon    Sep 30      Blower Door Test (1)      
Tue    Oct 1      Paint 3 (2)      
Thu    Oct 3      Appraiser Confirms Construction Completion (0)      
Thu    Oct 3      Inspection (Final HVAC) (1)      
Fri    Oct 4      Inspection (Final Plumbing) (1)      
Mon    Oct 7      Inspection (Final Electric) (1)      
Tue    Oct 8      Stain Hardwood Stairs (1)      
Wed    Oct 9      Cleaning (1)       Sat/Sun
Thu    Oct 10      C.O. to Lender (0)      
Thu    Oct 10      Schedule Closing (0)      
Thu    Oct 10      Payment for Upgrades (0)      
Thu    Oct 10      Keys to Settlement Agent (0)      
Thu    Oct 10      Review Settlement Statement (0)      
Thu    Oct 10      Jerry Signs Closing Documents (0)      
Thu    Oct 10      Request Trash Tote From POA Manager (0)      
Thu    Oct 10      Closing (1)       TUESDAY, MAY 23, 2017
Fri    Oct 11      Remove Coded Lockbox (0)      
--   --   Country Beige Vinyl, Green Door
--   --   Follow up with realtor on hall shower decision
--   --   Buyer wants access panel in closet Left note on site after door had been changed
--   --   Install shower through patio door Tuesday, February 14
--   --   Add 2 additional lengths of fence on right side to match 111 Week of 5/8- Tom please confirm with Premier
--   --   Caulk side splash in hall bathroom
--   --   Need to scrape and sweep the floors and get out all drywall materials so Mitch can begin trim
--   --   Cranberry red front door
--   --   Would like to close on May 12, 2017
--   --   Key stuck in front door
--   --   Laminate countertop against wall in dining room?
--   --   Drywall needed in pantry
--   --   Drywall needed upstairs???
--   --   Interior Trim in Bathrooms
--   --   Shoemold over weekend or Monday 8th Thu, May 11
--   --   Paint final coat 5/6-5/7
--   --   Paint 3- 5/9-5/10
--   --   Transition strip needed between kitchen tile and pantry vinyl Mindy to call Eric
--   --   Final paint Fri, May 12
--   --   Hoping to close by Friday 5/19...or Monday 5/21???
--   --   Cypress Trees Osbaldo
--   --   Fire extinguisher Osbaldo
--   --   HVAC - grill covers, condensate line
--   --   Push button locks
--   --   Storm Door Osbaldo - Friday
--   --   Appraiser Re-Visit Sandy Martin -- likely Wed, May 17
--   --   Insulate door to attic Osbaldo
--   --   Install screens and screen on patio door Kelly
--   --   Install storm door
--   --   Install electronic deadbolt Osbaldo
--   --   Shelving in pantry Ron Thursday morning
--   --   Install. Sanity
--   --   Install vanity Mindy
--   --   Light bulbs in dining chandelier Osbaldo - Friday
--   --   Missing bulbs in master bath Osbaldo - Friday
--   --   Cut hole in toe kick of loft kitchen Osbaldo - Friday
--   --   Washer drain
--   --   Receptacle on inside of closetall Harry
--   --   Snap light in pantry instead of flush mont Amy, Harry
--   --   Leave closing booklet Mindy
--   --   Front door seal top left corner Osbaldo - Friday
--   --   Closing Tuesday at 10AM
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1)       Monday May 16
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8)      
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)       Extend fence by two lengths
-- -- Sod / Seed / Landscaping (0)       Seed backyard and provide new landscape hedge
-- -- HVAC Rough In (4)       2/13 in process
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       2/13 in process-waiting on hall shower
-- -- Electric Rough In (4)       2/20 - Harry in process
-- -- Exterior Vinyl (0)      
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4)      
-- -- Drywall (Tape, Block, Skim, Sand) (6)       Complete by 3/14
-- -- Paint 1 (1)       3/15
-- -- House Numbers (0)      
-- -- Cabinet Installation (2)       Delivered Thurs, Mar 23, Installed Mon, Mar 27
-- -- Granite Installation (1)       4/10
-- -- Interior Trim - Install (3)       Done except for bathrooms- waiting on grout will finish 4/25
-- -- Luxury Vinyl Plank (3)      
-- -- Luxury Vinyl Tile (0)       4/24 all needs to be grouted
-- -- Paint 2 (3)       Thursday 4/27
-- -- Cover Floors (1)       TODAY 5/3
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Week of May 1
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       By 5/12
-- -- HVAC Trim Out (1)       By Thu, Apr 27
-- -- Plumbing Trim Out (2)       5/9 in process
-- -- Install Appliances (0)       5/11- confirm with Amy
-- -- Carpet (2)       5/8
-- -- Inspection (Final Building) (2)       Wed, May 17
-- -- Pre Walk Through (0)       5/11 @10:30
-- -- Certificate of Occupancy (1)      
-- -- Buyer Walk Through (1)       Wednesday 5/17?