Tenant = Tim Johnson @ 803-760-3497 |
|
|
-- |
-- |
Paint at drywall patch on landing |
Tom will call Isaac |
|
-- |
-- |
Hot water side of sink faucet does not work |
Kate will call Bobby |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Bone Vinyl, Red door |
Need to change door color to yellow |
|
-- |
-- |
Potential framing changes in hall bathroom to accommodate for 36 inch vanity |
|
|
-- |
-- |
Finish installing bathroom cabinetry |
Osbaldo |
|
-- |
-- |
Hardware to be installed on cabinetry |
Osbaldo to check |
|
-- |
-- |
Final paint touch up |
7/24 |
|
-- |
-- |
Put ceiling fans inside when they arrive |
|
|
-- |
-- |
Repair main water line |
Mindy |
|
-- |
-- |
Cut in receptacle in Island |
Harry |
|
-- |
-- |
Tom to take remaining lights |
|
|
-- |
-- |
Remove cardboard from floors |
Osbaldo 7/27 |
|
-- |
-- |
Clean off front and back siding- very muddy |
|
|
-- |
-- |
Need cord for range |
|
|
-- |
-- |
Shoemold needed at french doors |
|
|
-- |
-- |
Cover on media wires in laundry |
Harry- 8/3 |
|
-- |
-- |
Install fridge handles |
|
|
-- |
-- |
Install dishwasher |
|
|
-- |
-- |
Floor creaking through hallway |
|
|
-- |
-- |
Adjust water pressure |
|
|
-- |
-- |
Hall Bath needs seal on spout |
|
|
-- |
-- |
Caulk at master backsplash above wall |
Osbaldo |
|
-- |
-- |
Blend wall paint around trim |
|
|
-- |
-- |
Out back- splash block needed |
|
|
-- |
-- |
Missing several vinyl pieces at bottom of deck |
|
|
-- |
-- |
Hallway squeaks |
|
|
-- |
-- |
CODED LOCKBOX - 6581 |
|
|
-- |
-- |
Remove trash can |
|
|
-- |
-- |
Mark parking spot lines |
Adam |
|
-- |
-- |
Paint for all properties |
|
|
-- |
-- |
Wobbly spot on hall tub |
Mindy? Complete? |
|
-- |
-- |
Walk through with Tom creaks in floor- landings |
Tom |
|
-- |
-- |
New panel for panel box lift closet |
|
|
-- |
-- |
Creaks in loft floor ear window |
Tom |
|
-- |
-- |
Touch up floors in kitchen |
|
|
-- |
-- |
Downspout...run away from house |
Splash block should be sufficient - owner can change later |
|
-- |
-- |
Wash paint bottom of trim...outside under French doors |
|
|
-- |
-- |
Box over drain??? |
Kate handle |
|
-- |
-- |
Chip on cement step |
|
|
-- |
-- |
Wobbly spout on hall tub |
|
|
-- |
-- |
Electricity not working in master bedroom |
|
|
-- |
-- |
Ceiling repair from plumbing related water damage |
Tom will relay to drywaller Happening this week June 18 |
|
-- |
-- |
REVIEW REPAIR LIST |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
Monday May 16 |
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Wed, May 3 |
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
Done by Tue, May 2 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Thu, May 4 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
5/15- in process- blocked |
|
-- |
-- |
Paint 1 (1) |
5/19? |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
Extinguisher - Osbaldo |
|
-- |
-- |
Cabinet Installation (2) * |
Still working on upstairs bathrooms |
|
-- |
-- |
Granite Installation (1) * |
July 14 |
|
-- |
-- |
Interior Trim - Install (3) |
6/26- complete today |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Finishing on Friday 6/23 |
|
-- |
-- |
Paint 2 (3) |
6/12-6/14 |
|
-- |
-- |
Cover Floors (1) |
Osbaldo - Friday afternoon, June 30 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
7/5 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Thurs, July 20 |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Finish 7/24 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
Were not delivered |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
6/30 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Robbie Miller going August 2 |
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Thursday-Friday |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Saturday morning 7/29 |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|