ADDR
- 114  ::  2243 Lapis Lane
[ BUILD: 16020089 ]       [ PLUMB: 16040132 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Missing light bulb in master bathroom
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Order Tubs / Showers (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Install Stairs (0)      
Mon    Dec 2      House Number and Status in Window (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Sod / Seed / Landscaping (0)       Mon/Tues
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Garage Door (0)      
Thu    Dec 5      House Numbers (0)       JB
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Cover Floors (1)      
Mon    Dec 9      Deliver Plumbing / Lighting Fixtures (0)      
Mon    Dec 9      Shoe Moulding (0)      
Mon    Dec 9      Set Water Meter (0)      
Mon    Dec 9      Ceiling Fans (0)      
Mon    Dec 9      Blower Door Test (1)      
Tue    Dec 10      Paint 3 (2) *       
Thu    Dec 12      Appraiser Confirms Construction Completion (0)      
Thu    Dec 12      Inspection (Final HVAC) (1)      
Fri    Dec 13      Inspection (Final Plumbing) (1)      
Mon    Dec 16      Inspection (Final Electric) (1)      
Tue    Dec 17      Stain Hardwood Stairs (1)      
Wed    Dec 18      Certificate of Occupancy (1) *       
Thu    Dec 19      C.O. to Lender (0)      
Thu    Dec 19      Schedule Closing (0)      
Thu    Dec 19      Payment for Upgrades (0)      
Thu    Dec 19      Keys to Settlement Agent (0)      
Thu    Dec 19      Review Settlement Statement (0)      
Thu    Dec 19      Jerry Signs Closing Documents (0)      
Thu    Dec 19      Request Trash Tote From POA Manager (0)      
Thu    Dec 19      Closing (1)       NEED TO BE IN BY NOV 23
Fri    Dec 20      Remove Coded Lockbox (0)      
--   --   Portsmouth Brick, Pearl Vinyl, Green Door
--   --   Interior Framing Talk to Darrell and JM this morning
--   --   Nail down sub floor at landing and Laundry Room by pocket door
--   --   Loft window?
--   --   Loft window?
--   --   Discuss handrails from first floor
--   --   Buyer: Plan for patio, steps, landscaping, parking, curb, gutter
--   --   Carpet Wed, Nov 16
--   --   Curb & Gutter Mon, Nov 21
--   --   Water Meter
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Monday May 16
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)       Yes
-- -- Deck (0)      
-- -- Gutters (0)       11/17: Greg is looking into it right away;
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- HVAC Rough In (4)       Done Sep 6
-- -- Inspection (Rough In HVAC) (1)       Thurs, Sept 15
-- -- Plumbing Rough In (4)       In process
-- -- Electric Rough In (4)       Finished by Sept 14
-- -- Exterior Vinyl (0) *        8/29 brick in process
-- -- Insulation (2)       9/19
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       Mon, Nov 14
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        9/23
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        10/3 sanding today
-- -- Paint 1 (1)       Wed, Oct 5
-- -- Cabinet Installation (2) *        Delivery Oct 14, Install Oct 17 - 21
-- -- Granite Installation (1) *        11/1
-- -- Interior Trim - Install (3)       10/16- end of week
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       In process
-- -- Paint 2 (3)       10/31
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       11/7 installation
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       11/14 finishing
-- -- HVAC Trim Out (1)       Tuesday, Nov 15
-- -- Plumbing Trim Out (2)      
-- -- Install Appliances (0) *        Install 11/12
-- -- Carpet (2)       11/15
-- -- Inspection (Final Building) (2) *        Mon, Nov 21
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Wed Nov 16 - Thu Nov 17
-- -- Buyer Walk Through (1)       Mon 11/21