| -- | -- | Clean Exterior by back patio | ||
| -- | -- | Dishwasher repair | ||
| -- | -- | Grass seed | ||
| -- | -- | Repaint front door | ||
| Tue | Dec 16 | Ratified Contract? (0) | ||
| Tue | Dec 16 | $2500 Deposit Received (0) | ||
| Tue | Dec 16 | Association Packet Requested (0) | ||
| Tue | Dec 16 | Association Packet Received (0) | ||
| Tue | Dec 16 | Selections Meeting (0) | ||
| Tue | Dec 16 | Selections Sheet Signed (0) | ||
| Tue | Dec 16 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Tue | Dec 16 | Deposit For Upgrades Received (0) | ||
| Tue | Dec 16 | Inspection (Concrete Wall) (1) | ||
| Wed | Dec 17 | Inspection (Conduit Under Slab) (1) | ||
| Thu | Dec 18 | Inspection (Drain Tile) (0) | ||
| Thu | Dec 18 | Settlement Agent Confirmed (0) | ||
| Thu | Dec 18 | Order Tubs / Showers (0) | ||
| Thu | Dec 18 | Verify Window & Roof Structure (0) | ||
| Thu | Dec 18 | Install Stairs (0) * | ||
| Thu | Dec 18 | House Number and Status in Window (0) | ||
| Thu | Dec 18 | Order Appliances (0) | ||
| Thu | Dec 18 | Patio (0) | ||
| Thu | Dec 18 | Rough In Microwave Vent (0) | ||
| Thu | Dec 18 | Inspection (Rough In Plumbing) (1) | ||
| Fri | Dec 19 | Inspection (Rough In Electric) (1) | ||
| Mon | Dec 22 | Inspection (Framing) (1) * | ||
| Tue | Dec 23 | Inspection (Deck Piers) (0) | ||
| Tue | Dec 23 | Exterior Stone (0) | ||
| Tue | Dec 23 | Set Electric Meter (0) * | ||
| Tue | Dec 23 | Inspection (Main Water Line) (0) | ||
| Tue | Dec 23 | Loan Approval (0) | ||
| Tue | Dec 23 | Deed Preparation (0) | ||
| Tue | Dec 23 | Garage Door (0) | ||
| Tue | Dec 23 | Mailbox (0) | ||
| Tue | Dec 23 | Order Plumbing / Lighting Fixtures (0) | ||
| Tue | Dec 23 | Interior Trim - Paint (1) | ||
| Wed | Dec 24 | Cover Floors (1) | ||
| Thu | Dec 25 | Deliver Plumbing / Lighting Fixtures (0) | ||
| Thu | Dec 25 | Shoe Moulding (0) | ||
| Thu | Dec 25 | Set Water Meter (0) * | ||
| Thu | Dec 25 | Ceiling Fans (0) | ||
| Thu | Dec 25 | Blower Door Test (1) | ||
| Fri | Dec 26 | Paint 3 (2) * | ||
| Tue | Dec 30 | Appraiser Confirms Construction Completion (0) | ||
| Tue | Dec 30 | Inspection (Final HVAC) (1) | ||
| Wed | Dec 31 | Inspection (Final Plumbing) (1) | ||
| Thu | Jan 1 | Inspection (Final Electric) (1) | ||
| Fri | Jan 2 | Stain Hardwood Stairs (1) * | ||
| Mon | Jan 5 | C.O. to Lender (0) | ||
| Mon | Jan 5 | Schedule Closing (0) | ||
| Mon | Jan 5 | Payment for Upgrades (0) | ||
| Mon | Jan 5 | Keys to Settlement Agent (0) | ||
| Mon | Jan 5 | Review Settlement Statement (0) | ||
| Mon | Jan 5 | Jerry Signs Closing Documents (0) | ||
| Mon | Jan 5 | Request Trash Tote From POA Manager (0) | ||
| Mon | Jan 5 | Closing (1) | ||
| Tue | Jan 6 | Remove Coded Lockbox (0) | ||
| -- | -- | Carter's Grove Brick, Bone Vinyl, Green Door | ||
| -- | -- | Beginning meter pack on 107-110 today | ||
| -- | -- | Repair damaged stairs | ||
| -- | -- | Need bathroom trim | ||
| -- | -- | Tom did you call HEC? | ||
| -- | -- | Tom did you call for heat? | ||
| -- | -- | 12/8 gash on third step needs to be fixed | ||
| -- | -- | Need vinyl under stairs and in basement room closet | ||
| -- | -- | Patch concrete in basement room | ||
| -- | -- | Nosing piece for s | ||
| -- | -- | Nosing piece for top of stairs | 12/19 installed today | |
| -- | -- | Replace damaged stair tread | ||
| -- | -- | Shower Door Install | Between 28-30 | |
| -- | -- | 1/3 finishing paint now | ||
| -- | -- | Privacy Fence Divider | ||
| -- | -- | 1/5 paint touch up today | ||
| -- | -- | Flooring touch up | ||
| -- | -- | 1/5 Harry punch out | ||
| -- | -- | Replace master closet fluorescent light cover | ||
| -- | -- | Replace master closet fluorescent light cover | ||
| -- | -- | Chips in garage floor- Tom to seal when it warms up | ||
| -- | -- | Carpet Repair | ||
| -- | -- | |||
| -- | -- | |||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | Monday May 16 | |
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | 8/7 in process | |
| -- | -- | Order Steps (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | ||
| -- | -- | Windows & Doors (0) * | Hopefully Monday 9/26 | |
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | In progress | |
| -- | -- | Driveway (0) * | Concrete patios being Poured Wednesday or Thursday of this week | |
| -- | -- | Privacy Divider / Fence (0) * | ||
| -- | -- | Sod / Seed / Landscaping (0) | ||
| -- | -- | HVAC Rough In (4) | Sept 20? | |
| -- | -- | Plumbing Rough In (4) | Done by Friday 10/14 | |
| -- | -- | Electric Rough In (4) | Nearly done | |
| -- | -- | Inspection (Rough In HVAC) (1) | Friday, Oct 14 | |
| -- | -- | Exterior Vinyl (0) * | ||
| -- | -- | Insulation (2) * | Mon, Oct 17 | |
| -- | -- | Inspection (Insulation) (1) | Tue, Oct 18 | |
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | ||
| -- | -- | Order Interior Doors & Trim (0) | ||
| -- | -- | Drywall (Hang) (4) * | In process | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | 10/27 tape/block, 10/28 skim, done by Wed 11/2 | |
| -- | -- | Paint 1 (1) | 11/7 | |
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | 11/14: install starting | |
| -- | -- | Granite Installation (1) * | Thursday 12/1 | |
| -- | -- | Interior Trim - Install (3) * | 11/14: In progress | |
| -- | -- | Luxury Vinyl Plank (3) * | ||
| -- | -- | Luxury Vinyl Tile (0) | will be complete by 11/12 (Marcus) | |
| -- | -- | Paint 2 (3) | 11/29 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | In processing | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | ||
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Electric Trim Out (3) * | 12/21 will be complete by | |
| -- | -- | HVAC Trim Out (1) * | ||
| -- | -- | Plumbing Trim Out (2) * | 12/21 In process | |
| -- | -- | Install Appliances (0) * | Installed Dec 14; | |
| -- | -- | Carpet (2) | ||
| -- | -- | Inspection (Final Building) (2) * | Thurs, Dec 22 | |
| -- | -- | Pre Walk Through (0) | ||
| -- | -- | Cleaning (1) | Frid, Dec 23 - Monday December 26 or 27 | |
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | Buyer Walk Through (1) * | 1/4 | |