ADDR
- 107  ::  2242 Lapis Lane
[ BUILD: 16040114 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Clean Exterior by back patio
--   --   Dishwasher repair
--   --   Grass seed
--   --   Repaint front door
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Order Tubs / Showers (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Install Stairs (0)      
Mon    Dec 2      House Number and Status in Window (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Garage Door (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Cover Floors (1)      
Mon    Dec 9      Deliver Plumbing / Lighting Fixtures (0)      
Mon    Dec 9      Shoe Moulding (0)      
Mon    Dec 9      Set Water Meter (0)      
Mon    Dec 9      Ceiling Fans (0)      
Mon    Dec 9      Blower Door Test (1)      
Tue    Dec 10      Paint 3 (2) *       
Thu    Dec 12      Appraiser Confirms Construction Completion (0)      
Thu    Dec 12      Inspection (Final HVAC) (1)      
Fri    Dec 13      Inspection (Final Plumbing) (1)      
Mon    Dec 16      Inspection (Final Electric) (1)      
Tue    Dec 17      Stain Hardwood Stairs (1)      
Wed    Dec 18      C.O. to Lender (0)      
Wed    Dec 18      Schedule Closing (0)      
Wed    Dec 18      Payment for Upgrades (0)      
Wed    Dec 18      Keys to Settlement Agent (0)      
Wed    Dec 18      Review Settlement Statement (0)      
Wed    Dec 18      Jerry Signs Closing Documents (0)      
Wed    Dec 18      Request Trash Tote From POA Manager (0)      
Wed    Dec 18      Closing (1)      
Thu    Dec 19      Remove Coded Lockbox (0)      
--   --   Carter's Grove Brick, Bone Vinyl, Green Door
--   --   Beginning meter pack on 107-110 today
--   --   Repair damaged stairs
--   --   Need bathroom trim
--   --   Tom did you call HEC?
--   --   Tom did you call for heat?
--   --   12/8 gash on third step needs to be fixed
--   --   Need vinyl under stairs and in basement room closet
--   --   Patch concrete in basement room
--   --   Nosing piece for s
--   --   Nosing piece for top of stairs 12/19 installed today
--   --   Replace damaged stair tread
--   --   Shower Door Install Between 28-30
--   --   1/3 finishing paint now
--   --   Privacy Fence Divider
--   --   1/5 paint touch up today
--   --   Flooring touch up
--   --   1/5 Harry punch out
--   --   Replace master closet fluorescent light cover
--   --   Replace master closet fluorescent light cover
--   --   Chips in garage floor- Tom to seal when it warms up
--   --   Carpet Repair
--   --  
--   --  
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)       Monday May 16
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       8/7 in process
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0)       Hopefully Monday 9/26
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)       In progress
-- -- Driveway (0)       Concrete patios being Poured Wednesday or Thursday of this week
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Sept 20?
-- -- Inspection (Rough In HVAC) (1)       Friday, Oct 14
-- -- Plumbing Rough In (4)       Done by Friday 10/14
-- -- Electric Rough In (4)       Nearly done
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)       Mon, Oct 17
-- -- Inspection (Insulation) (1)       Tue, Oct 18
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        In process
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        10/27 tape/block, 10/28 skim, done by Wed 11/2
-- -- Paint 1 (1)       11/7
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        11/14: install starting
-- -- Granite Installation (1) *        Thursday 12/1
-- -- Interior Trim - Install (3)       11/14: In progress
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       will be complete by 11/12 (Marcus)
-- -- Paint 2 (3)       11/29
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       In processing
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       12/21 will be complete by
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       12/21 In process
-- -- Install Appliances (0) *        Installed Dec 14;
-- -- Carpet (2)      
-- -- Inspection (Final Building) (2) *        Thurs, Dec 22
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Frid, Dec 23 - Monday December 26 or 27
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)       1/4