ADDR
- 107  ::  2242 Lapis Lane
[ BUILD: 16040114 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Clean Exterior by back patio
--   --   Dishwasher repair
--   --   Grass seed
--   --   Repaint front door
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Order Tubs / Showers (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Install Stairs (0)      
Thu    May 1      House Number and Status in Window (0)      
Thu    May 1      Order Appliances (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Garage Door (0) *       
Tue    May 6      Mailbox (0)      
Tue    May 6      Order Plumbing / Lighting Fixtures (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Cover Floors (1)      
Thu    May 8      Deliver Plumbing / Lighting Fixtures (0)      
Thu    May 8      Shoe Moulding (0)      
Thu    May 8      Set Water Meter (0) *       
Thu    May 8      Ceiling Fans (0)      
Thu    May 8      Blower Door Test (1)      
Fri    May 9      Paint 3 (2) *       
Tue    May 13      Appraiser Confirms Construction Completion (0)      
Tue    May 13      Inspection (Final HVAC) (1)      
Wed    May 14      Inspection (Final Plumbing) (1)      
Thu    May 15      Inspection (Final Electric) (1)      
Fri    May 16      Stain Hardwood Stairs (1)      
Mon    May 19      C.O. to Lender (0)      
Mon    May 19      Schedule Closing (0)      
Mon    May 19      Payment for Upgrades (0)      
Mon    May 19      Keys to Settlement Agent (0)      
Mon    May 19      Review Settlement Statement (0)      
Mon    May 19      Jerry Signs Closing Documents (0)      
Mon    May 19      Request Trash Tote From POA Manager (0)      
Mon    May 19      Closing (1)      
Tue    May 20      Remove Coded Lockbox (0)      
--   --   Carter's Grove Brick, Bone Vinyl, Green Door
--   --   Beginning meter pack on 107-110 today
--   --   Repair damaged stairs
--   --   Need bathroom trim
--   --   Tom did you call HEC?
--   --   Tom did you call for heat?
--   --   12/8 gash on third step needs to be fixed
--   --   Need vinyl under stairs and in basement room closet
--   --   Patch concrete in basement room
--   --   Nosing piece for s
--   --   Nosing piece for top of stairs 12/19 installed today
--   --   Replace damaged stair tread
--   --   Shower Door Install Between 28-30
--   --   1/3 finishing paint now
--   --   Privacy Fence Divider
--   --   1/5 paint touch up today
--   --   Flooring touch up
--   --   1/5 Harry punch out
--   --   Replace master closet fluorescent light cover
--   --   Replace master closet fluorescent light cover
--   --   Chips in garage floor- Tom to seal when it warms up
--   --   Carpet Repair
--   --  
--   --  
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)       Monday May 16
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       8/7 in process
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0) *        Hopefully Monday 9/26
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)       In progress
-- -- Driveway (0) *        Concrete patios being Poured Wednesday or Thursday of this week
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Sept 20?
-- -- Inspection (Rough In HVAC) (1)       Friday, Oct 14
-- -- Plumbing Rough In (4)       Done by Friday 10/14
-- -- Electric Rough In (4)       Nearly done
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *        Mon, Oct 17
-- -- Inspection (Insulation) (1)       Tue, Oct 18
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        In process
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        10/27 tape/block, 10/28 skim, done by Wed 11/2
-- -- Paint 1 (1)       11/7
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        11/14: install starting
-- -- Granite Installation (1) *        Thursday 12/1
-- -- Interior Trim - Install (3) *        11/14: In progress
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       will be complete by 11/12 (Marcus)
-- -- Paint 2 (3)       11/29
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        In processing
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       12/21 will be complete by
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       12/21 In process
-- -- Install Appliances (0) *        Installed Dec 14;
-- -- Carpet (2)      
-- -- Inspection (Final Building) (2) *        Thurs, Dec 22
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Frid, Dec 23 - Monday December 26 or 27
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)       1/4