Clean Exterior by back patio |
|
|
-- |
-- |
Dishwasher repair |
|
|
-- |
-- |
Grass seed |
|
|
-- |
-- |
Repaint front door |
|
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Order Tubs / Showers (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Install Stairs (0)
|
|
|
Tue |
Sep 24 |
House Number and Status in Window (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Garage Door (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Cover Floors (1)
|
|
|
Tue |
Oct 1 |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
Tue |
Oct 1 |
Shoe Moulding (0)
|
|
|
Tue |
Oct 1 |
Set Water Meter (0)
|
|
|
Tue |
Oct 1 |
Ceiling Fans (0)
|
|
|
Tue |
Oct 1 |
Blower Door Test (1)
|
|
|
Wed |
Oct 2 |
Paint 3 (2)
|
|
|
Fri |
Oct 4 |
Appraiser Confirms Construction Completion (0)
|
|
|
Fri |
Oct 4 |
Inspection (Final HVAC) (1)
|
|
|
Mon |
Oct 7 |
Inspection (Final Plumbing) (1)
|
|
|
Tue |
Oct 8 |
Inspection (Final Electric) (1)
|
|
|
Wed |
Oct 9 |
Stain Hardwood Stairs (1)
|
|
|
Thu |
Oct 10 |
C.O. to Lender (0)
|
|
|
Thu |
Oct 10 |
Schedule Closing (0)
|
|
|
Thu |
Oct 10 |
Payment for Upgrades (0)
|
|
|
Thu |
Oct 10 |
Keys to Settlement Agent (0)
|
|
|
Thu |
Oct 10 |
Review Settlement Statement (0)
|
|
|
Thu |
Oct 10 |
Jerry Signs Closing Documents (0)
|
|
|
Thu |
Oct 10 |
Request Trash Tote From POA Manager (0)
|
|
|
Thu |
Oct 10 |
Closing (1)
|
|
|
Fri |
Oct 11 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
Carter's Grove Brick, Bone Vinyl, Green Door |
|
|
-- |
-- |
Beginning meter pack on 107-110 today |
|
|
-- |
-- |
Repair damaged stairs |
|
|
-- |
-- |
Need bathroom trim |
|
|
-- |
-- |
Tom did you call HEC? |
|
|
-- |
-- |
Tom did you call for heat? |
|
|
-- |
-- |
12/8 gash on third step needs to be fixed |
|
|
-- |
-- |
Need vinyl under stairs and in basement room closet |
|
|
-- |
-- |
Patch concrete in basement room |
|
|
-- |
-- |
Nosing piece for s |
|
|
-- |
-- |
Nosing piece for top of stairs |
12/19 installed today |
|
-- |
-- |
Replace damaged stair tread |
|
|
-- |
-- |
Shower Door Install |
Between 28-30 |
|
-- |
-- |
1/3 finishing paint now |
|
|
-- |
-- |
Privacy Fence Divider |
|
|
-- |
-- |
1/5 paint touch up today |
|
|
-- |
-- |
Flooring touch up |
|
|
-- |
-- |
1/5 Harry punch out |
|
|
-- |
-- |
Replace master closet fluorescent light cover |
|
|
-- |
-- |
Replace master closet fluorescent light cover |
|
|
-- |
-- |
Chips in garage floor- Tom to seal when it warms up |
|
|
-- |
-- |
Carpet Repair |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
Monday May 16 |
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
8/7 in process |
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Windows & Doors (0)
|
Hopefully Monday 9/26 |
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
In progress |
|
-- |
-- |
Driveway (0)
|
Concrete patios being Poured Wednesday or Thursday of this week |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
Sept 20? |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Friday, Oct 14 |
|
-- |
-- |
Plumbing Rough In (4)
|
Done by Friday 10/14 |
|
-- |
-- |
Electric Rough In (4)
|
Nearly done |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
Mon, Oct 17 |
|
-- |
-- |
Inspection (Insulation) (1)
|
Tue, Oct 18 |
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
In process |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
10/27 tape/block, 10/28 skim, done by Wed 11/2 |
|
-- |
-- |
Paint 1 (1)
|
11/7 |
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
11/14: install starting |
|
-- |
-- |
Granite Installation (1)
|
Thursday 12/1 |
|
-- |
-- |
Interior Trim - Install (3)
|
11/14: In progress |
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
will be complete by 11/12 (Marcus) |
|
-- |
-- |
Paint 2 (3)
|
11/29 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
In processing |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
12/21 will be complete by |
|
-- |
-- |
HVAC Trim Out (1)
|
|
|
-- |
-- |
Plumbing Trim Out (2)
|
12/21 In process |
|
-- |
-- |
Install Appliances (0)
|
Installed Dec 14; |
|
-- |
-- |
Carpet (2)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
Thurs, Dec 22 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
Frid, Dec 23 - Monday December 26 or 27 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
1/4 |
|