- 107  ::  2242 Lapis Lane
[ BUILD: 16040114 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Clean Exterior by back patio
--   --   Dishwasher repair
--   --   Grass seed
--   --   Repaint front door
Fri    Sep 20      Ratified Contract? (0)      
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Inspection (Concrete Wall) (1)      
Mon    Sep 23      Inspection (Conduit Under Slab) (1)      
Tue    Sep 24      Inspection (Drain Tile) (0)      
Tue    Sep 24      Settlement Agent Confirmed (0)      
Tue    Sep 24      Order Tubs / Showers (0)      
Tue    Sep 24      Verify Window & Roof Structure (0)      
Tue    Sep 24      Install Stairs (0)      
Tue    Sep 24      House Number and Status in Window (0)      
Tue    Sep 24      Order Appliances (0)      
Tue    Sep 24      Patio (0)      
Tue    Sep 24      Rough In Microwave Vent (0)      
Tue    Sep 24      Inspection (Rough In Plumbing) (1)      
Wed    Sep 25      Inspection (Rough In Electric) (1)      
Thu    Sep 26      Inspection (Deck Piers) (0)      
Thu    Sep 26      Inspection (Framing) (1)      
Fri    Sep 27      Exterior Stone (0)      
Fri    Sep 27      Set Electric Meter (0)      
Fri    Sep 27      Inspection (Main Water Line) (0)      
Fri    Sep 27      Loan Approval (0)      
Fri    Sep 27      Deed Preparation (0)      
Fri    Sep 27      Garage Door (0)      
Fri    Sep 27      Mailbox (0)      
Fri    Sep 27      Order Plumbing / Lighting Fixtures (0)      
Fri    Sep 27      Interior Trim - Paint (1)      
Mon    Sep 30      Cover Floors (1)      
Tue    Oct 1      Deliver Plumbing / Lighting Fixtures (0)      
Tue    Oct 1      Shoe Moulding (0)      
Tue    Oct 1      Set Water Meter (0)      
Tue    Oct 1      Ceiling Fans (0)      
Tue    Oct 1      Blower Door Test (1)      
Wed    Oct 2      Paint 3 (2)      
Fri    Oct 4      Appraiser Confirms Construction Completion (0)      
Fri    Oct 4      Inspection (Final HVAC) (1)      
Mon    Oct 7      Inspection (Final Plumbing) (1)      
Tue    Oct 8      Inspection (Final Electric) (1)      
Wed    Oct 9      Stain Hardwood Stairs (1)      
Thu    Oct 10      C.O. to Lender (0)      
Thu    Oct 10      Schedule Closing (0)      
Thu    Oct 10      Payment for Upgrades (0)      
Thu    Oct 10      Keys to Settlement Agent (0)      
Thu    Oct 10      Review Settlement Statement (0)      
Thu    Oct 10      Jerry Signs Closing Documents (0)      
Thu    Oct 10      Request Trash Tote From POA Manager (0)      
Thu    Oct 10      Closing (1)      
Fri    Oct 11      Remove Coded Lockbox (0)      
--   --   Carter's Grove Brick, Bone Vinyl, Green Door
--   --   Beginning meter pack on 107-110 today
--   --   Repair damaged stairs
--   --   Need bathroom trim
--   --   Tom did you call HEC?
--   --   Tom did you call for heat?
--   --   12/8 gash on third step needs to be fixed
--   --   Need vinyl under stairs and in basement room closet
--   --   Patch concrete in basement room
--   --   Nosing piece for s
--   --   Nosing piece for top of stairs 12/19 installed today
--   --   Replace damaged stair tread
--   --   Shower Door Install Between 28-30
--   --   1/3 finishing paint now
--   --   Privacy Fence Divider
--   --   1/5 paint touch up today
--   --   Flooring touch up
--   --   1/5 Harry punch out
--   --   Replace master closet fluorescent light cover
--   --   Replace master closet fluorescent light cover
--   --   Chips in garage floor- Tom to seal when it warms up
--   --   Carpet Repair
--   --  
--   --  
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)       Monday May 16
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1)      
-- -- Framing I (9)       8/7 in process
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8)      
-- -- Windows & Doors (0)       Hopefully Monday 9/26
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)       In progress
-- -- Driveway (0)       Concrete patios being Poured Wednesday or Thursday of this week
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Sept 20?
-- -- Inspection (Rough In HVAC) (1)       Friday, Oct 14
-- -- Plumbing Rough In (4)       Done by Friday 10/14
-- -- Electric Rough In (4)       Nearly done
-- -- Exterior Vinyl (0)      
-- -- Insulation (2)       Mon, Oct 17
-- -- Inspection (Insulation) (1)       Tue, Oct 18
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4)       In process
-- -- Drywall (Tape, Block, Skim, Sand) (6)       10/27 tape/block, 10/28 skim, done by Wed 11/2
-- -- Paint 1 (1)       11/7
-- -- House Numbers (0)      
-- -- Cabinet Installation (2)       11/14: install starting
-- -- Granite Installation (1)       Thursday 12/1
-- -- Interior Trim - Install (3)       11/14: In progress
-- -- Luxury Vinyl Plank (3)      
-- -- Luxury Vinyl Tile (0)       will be complete by 11/12 (Marcus)
-- -- Paint 2 (3)       11/29
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       In processing
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       12/21 will be complete by
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       12/21 In process
-- -- Install Appliances (0)       Installed Dec 14;
-- -- Carpet (2)      
-- -- Inspection (Final Building) (2)       Thurs, Dec 22
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Frid, Dec 23 - Monday December 26 or 27
-- -- Certificate of Occupancy (1)      
-- -- Buyer Walk Through (1)       1/4