Leaking Basement |
Aug 31, 2018 |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Country Beige Vinyl, Red Door |
|
|
-- |
-- |
Green door |
|
|
-- |
-- |
Tom to move up hall bath vanity to downstairs powder room |
|
|
-- |
-- |
Need vinyl in pantry and under stairs |
|
|
-- |
-- |
Cover floors. Are we using the same stuff we used in heritage 39? |
|
|
-- |
-- |
Install fire extinguisher |
Osbaldo |
|
-- |
-- |
Final paint and stain steps |
4/24 last coat of poly |
|
-- |
-- |
Trim out laundry and closet under stairs |
|
|
-- |
-- |
Harry, clean up boxes |
|
|
-- |
-- |
Install shoe moulding |
Osbaldo |
|
-- |
-- |
Home Inspection - Apr 25, 9AM |
|
|
-- |
-- |
Radon test results |
Wed, May 3? |
|
-- |
-- |
CODED LOCKBOX = 1488 |
|
|
-- |
-- |
Need mailbox keys |
|
|
-- |
-- |
Need extra keys |
|
|
-- |
-- |
Paint edges of doors |
Isaac |
|
-- |
-- |
Touch Up Paint |
Isaac |
|
-- |
-- |
Fence quote-all privacy |
|
|
-- |
-- |
Clean back of patio doors |
Osbaldo |
|
-- |
-- |
Extend drain line in backyard to end of property line and bury it |
Osbaldo |
|
-- |
-- |
Semi frames less shower door install-quote |
|
|
-- |
-- |
Washer install (maybe dryer) |
|
|
-- |
-- |
Left door under sink hinge adjustment |
Classic - Kate to talk to Gabby, replace hinges |
|
-- |
-- |
Is the tile sealed? |
Osbaldo |
|
-- |
-- |
Blinds on 11 windows(waiting on buyer) |
|
|
-- |
-- |
Add seed and straw |
|
|
-- |
-- |
Hardwood repair |
|
|
-- |
-- |
Remove clothes washer |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
Monday May 16 |
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
8/7 in process |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
At least 3 to 4 more weeks according to Donald as of 9/12 |
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
Hopefully Monday 9/26 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Complete by 12/14-15 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
Tom get with Mitch on supply in trailer |
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
1/3 sanding now |
|
-- |
-- |
Paint 1 (1) |
1/6 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Del Jan 27, Install Jan 30 - Feb 3 |
|
-- |
-- |
Granite Installation (1) * |
Feb 17 |
|
-- |
-- |
Interior Trim - Install (3) |
Nearly complete |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Some on site- all? |
|
-- |
-- |
Paint 2 (3) |
3/20 Filling painting trim |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Mon, May 1 |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Harry - Thu, April 20 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Install pedastal sink in powder room |
|
-- |
-- |
Install Appliances (0) * |
April 10 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
April 10th-ish |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Wed, May 3 |
|
-- |
-- |
Pre Walk Through (0) |
Mon, May 1? |
|
-- |
-- |
Cleaning (1) |
Finishing today 5/1 |
|
-- |
-- |
Certificate of Occupancy (1) * |
Wed, May 3? |
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Saturday, May 13 at 11AM; |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Closing (1) |
Fri, May 19 @ 3PM, Welby's office |
|