--   --   Leaking Basement Aug 31, 2018
Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Order Appliances (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Order Plumbing / Lighting Fixtures (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Inspection (Final HVAC) (1)      
Fri    Dec 26      Inspection (Final Plumbing) (1)      
Mon    Dec 29      Inspection (Final Electric) (1)      
Tue    Dec 30      Stain Hardwood Stairs (1) *       
Wed    Dec 31      Schedule Closing (0)      
Wed    Dec 31      Keys to Settlement Agent (0)      
Wed    Dec 31      Review Settlement Statement (0)      
Wed    Dec 31      Jerry Signs Closing Documents (0)      
Wed    Dec 31      Request Trash Tote From POA Manager (0)      
Wed    Dec 31      Remove Coded Lockbox (0)      
--   --   Country Beige Vinyl, Red Door
--   --   Green door
--   --   Tom to move up hall bath vanity to downstairs powder room
--   --   Need vinyl in pantry and under stairs
--   --   Cover floors. Are we using the same stuff we used in heritage 39?
--   --   Install fire extinguisher Osbaldo
--   --   Final paint and stain steps 4/24 last coat of poly
--   --   Trim out laundry and closet under stairs
--   --   Harry, clean up boxes
--   --   Install shoe moulding Osbaldo
--   --   Home Inspection - Apr 25, 9AM
--   --   Radon test results Wed, May 3?
--   --   CODED LOCKBOX = 1488
--   --   Need mailbox keys
--   --   Need extra keys
--   --   Paint edges of doors Isaac
--   --   Touch Up Paint Isaac
--   --   Fence quote-all privacy
--   --   Clean back of patio doors Osbaldo
--   --   Extend drain line in backyard to end of property line and bury it Osbaldo
--   --   Semi frames less shower door install-quote
--   --   Washer install (maybe dryer)
--   --   Left door under sink hinge adjustment Classic - Kate to talk to Gabby, replace hinges
--   --   Is the tile sealed? Osbaldo
--   --   Blinds on 11 windows(waiting on buyer)
--   --   Add seed and straw
--   --   Hardwood repair
--   --   Remove clothes washer
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)       Monday May 16
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       8/7 in process
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *        At least 3 to 4 more weeks according to Donald as of 9/12
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *        Hopefully Monday 9/26
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Complete by 12/14-15
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       Tom get with Mitch on supply in trailer
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        1/3 sanding now
-- -- Paint 1 (1)       1/6
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Del Jan 27, Install Jan 30 - Feb 3
-- -- Granite Installation (1) *        Feb 17
-- -- Interior Trim - Install (3) *        Nearly complete
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Some on site- all?
-- -- Paint 2 (3)       3/20 Filling painting trim
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *       
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Mon, May 1
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        Harry - Thu, April 20
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *        Install pedastal sink in powder room
-- -- Install Appliances (0) *        April 10
-- -- Paint 3 (2) *       
-- -- Carpet (2)       April 10th-ish
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Wed, May 3
-- -- Pre Walk Through (0)       Mon, May 1?
-- -- Cleaning (1)       Finishing today 5/1
-- -- Certificate of Occupancy (1) *        Wed, May 3?
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1) *        Saturday, May 13 at 11AM;
-- -- Payment for Upgrades (0)      
-- -- Closing (1)       Fri, May 19 @ 3PM, Welby's office