Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Order Tubs / Showers (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Install Stairs (0) *       
Thu    Dec 18      House Number and Status in Window (0)      
Thu    Dec 18      Order Appliances (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Garage Door (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Order Plumbing / Lighting Fixtures (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Deliver Plumbing / Lighting Fixtures (0)      
Wed    Dec 24      Shoe Moulding (0)      
Wed    Dec 24      Set Water Meter (0) *       
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Paint 3 (2) *       
Mon    Dec 29      Inspection (Final HVAC) (1)      
Tue    Dec 30      Inspection (Final Plumbing) (1)      
Wed    Dec 31      Inspection (Final Electric) (1)      
Thu    Jan 1      Stain Hardwood Stairs (1) *       
Fri    Jan 2      Schedule Closing (0)      
Fri    Jan 2      Payment for Upgrades (0)      
Fri    Jan 2      Keys to Settlement Agent (0)      
Fri    Jan 2      Review Settlement Statement (0)      
Fri    Jan 2      Jerry Signs Closing Documents (0)      
Fri    Jan 2      Request Trash Tote From POA Manager (0)      
Fri    Jan 2      Closing (1)      
Mon    Jan 5      Remove Coded Lockbox (0)      
--   --   Country Beige Vinyl, Red Door
--   --   Mark area that could be fenced
--   --   Wants to move up closing?
--   --   Staining steps 6/26-6/27
--   --   Only want stormy Monday throughout??? Price- Isaac
--   --   Install pedestal sink
--   --   Finish Rangae INstallation
--   --  
--   --   Finish Range Installation Osbaldo
--   --   Finish Painting Touch up - Thursday
--   --  
--   --  
--   --  
--   --   Drywall patches
--   --   Tub repairs Osbaldo
--   --   Replace hardwood piece on basement landing Osbaldo
--   --   Landscaping in back
--   --   Missing quartz cutting board Tom will ask Cheryl
--   --   Install basement window screens Tom will get one;
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       8/29 framing in process
-- -- Order Steps (0)      
-- -- Framing II (8)       In process
-- -- Framing III (8) *        9/19 settings stairs and finishing punch out today
-- -- Windows & Doors (0) *        9/19 Almost complete
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *        Waiting on panels
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Hopefully Mar 20
-- -- Plumbing Rough In (4)       Inspected Mar 6
-- -- Electric Rough In (4)       4/17- Will be completed Wednesday or Thursday this week
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        5/1 in process
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        5/8 sanding
-- -- Paint 1 (1)       Thursday 5/11
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Installing May 22
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        Mitch after 91 (week of 5/15)
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       6/12 needs to be grouted and sealed
-- -- Paint 2 (3)       6/14-apply color
-- -- Cover Floors (1)       Up floors can be covered today downstairs tomorrow 6/13
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        7/4
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3) *        6/30-7/5 realistically
-- -- HVAC Trim Out (1) *        Ronnie needs to check
-- -- Plumbing Trim Out (2) *        Ready
-- -- Install Appliances (0) *        Finish range installation
-- -- Carpet (2)       6/30
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Tuesday morning
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1) *