- 92  ::  346 Sapphire Drive
[ BUILD: 16060053 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Pearl Vinyl, Yellow Door
--   --   Hole in Tub Mindy meeting repair man on Friday 1/27
--   --   Kelly to clean floors once more before closing
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Order Tubs / Showers (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Install Stairs (0)      
Thu    May 1      House Number and Status in Window (0)      
Thu    May 1      Order Appliances (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Garage Door (0) *       
Tue    May 6      Mailbox (0)      
Tue    May 6      Order Plumbing / Lighting Fixtures (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Cover Floors (1)      
Thu    May 8      Deliver Plumbing / Lighting Fixtures (0)      
Thu    May 8      Shoe Moulding (0)      
Thu    May 8      Set Water Meter (0) *       
Thu    May 8      Ceiling Fans (0)      
Thu    May 8      Blower Door Test (1)      
Fri    May 9      Paint 3 (2) *       
Tue    May 13      Appraiser Confirms Construction Completion (0)      
Tue    May 13      Inspection (Final HVAC) (1)      
Wed    May 14      Inspection (Final Plumbing) (1)      
Thu    May 15      Inspection (Final Electric) (1)      
Fri    May 16      Stain Hardwood Stairs (1)      
Mon    May 19      Certificate of Occupancy (1) *       
Tue    May 20      C.O. to Lender (0)      
Tue    May 20      Schedule Closing (0)      
Tue    May 20      Payment for Upgrades (0)      
Tue    May 20      Keys to Settlement Agent (0)      
Tue    May 20      Review Settlement Statement (0)      
Tue    May 20      Jerry Signs Closing Documents (0)      
Tue    May 20      Request Trash Tote From POA Manager (0)      
Tue    May 20      Closing (1)      
Wed    May 21      Remove Coded Lockbox (0)      
--   --   Do we want trim down the stairs to the basement-needs handrail for code
--   --   Deck handrail
--   --   Need vinyl in pantry Jan 4 or 5
--   --   1/4 finish shoemold
--   --   Finish shoe moulding Jan 4
--   --   Paint touch up- today?
--   --   Harry to clean up trash today
--   --   Curb & Gutter Tuesday 1/24
--   --   Water Meter (City) Thursday, Jan 19
--   --   Sidewalk Wednesday, Jan 25
--   --   Top Soil
--   --   Sod 1/27
--   --   Foundation repair
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       8/29 framing in process
-- -- Order Steps (0)      
-- -- Framing II (8)       In process
-- -- Framing III (8) *        9/19 finishing stairs and completing punch out today
-- -- Windows & Doors (0) *        9/19 almost complete
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)       Wednesday 1/25
-- -- HVAC Rough In (4)       10/24 will finish today
-- -- Inspection (Rough In HVAC) (1)       10/31
-- -- Plumbing Rough In (4)       10/24 will finish today
-- -- Electric Rough In (4)       10/28 inspection
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *        11/1
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        11/7 in process
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       11/16
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivery Nov 23, Install Nov 28
-- -- Granite Installation (1) *        12/15
-- -- Interior Trim - Install (3) *        Finishing by 12/3
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Marcus in process
-- -- Paint 2 (3)       Beginning 12/5
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        In process
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Ben checking in with Jerry
-- -- Electric Trim Out (3)       1/5
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       1/4
-- -- Install Appliances (0) *        Monday-Wednesday?
-- -- Carpet (2)       Jan 9- in process
-- -- Inspection (Final Building) (2) *        Friday, January 20
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)       Wednesday 1/18
-- -- Buyer Walk Through (1)