CODED LOCKBOX --- 7134 |
|
|
-- |
-- |
Remove coded lockbox |
|
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Install Stairs (0)
|
|
|
Tue |
Sep 24 |
House Number and Status in Window (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
Mon |
Sep 30 |
Shoe Moulding (0)
|
|
|
Mon |
Sep 30 |
Set Water Meter (0)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Schedule Closing (0)
|
|
|
Mon |
Oct 7 |
Payment for Upgrades (0)
|
|
|
Mon |
Oct 7 |
Keys to Settlement Agent (0)
|
|
|
Mon |
Oct 7 |
Review Settlement Statement (0)
|
|
|
Mon |
Oct 7 |
Jerry Signs Closing Documents (0)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
Mon |
Oct 7 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
Trimmed entrance in wall under lower stairs for cat entrance |
Check with Dara at electrical walk through |
|
-- |
-- |
Half door at closet under lower stairs |
Check with Dara at electrical walk through |
|
-- |
-- |
Add closet to basement room |
|
|
-- |
-- |
Framing and Electrical Walk Through, Mon 5PM |
|
|
-- |
-- |
Framing and Electrical Walk Through, Mon 5:30 PM |
|
|
-- |
-- |
Tub shower needs to be installed in basement bathroom. Tab is now on site |
|
|
-- |
-- |
Cat door, half door under stairs, outlet under stairs |
|
|
-- |
-- |
A few deck boards to be addressed |
Osbaldo |
|
-- |
-- |
Remove materials from kitchen |
|
|
-- |
-- |
Basement bath tile? |
10/10 |
|
-- |
-- |
Order Mailboxes! |
Kate?- How many Scott? |
|
-- |
-- |
Install cat door from Lowe's on door to storage closet |
https://goo.gl/mkYVUZ |
|
-- |
-- |
Install Light in closet under stairs -NO OUTLET |
Harry |
|
-- |
-- |
Install mailbox |
Osbaldo will install the mailbox- Saturday or Monday |
|
-- |
-- |
Deck boards |
Osbaldo |
|
-- |
-- |
Garage Door |
Wed, Oct 11 |
|
-- |
-- |
Connect sewer lines |
Mindy |
|
-- |
-- |
Hoping for final appraisal Monday the 13th |
|
|
-- |
-- |
The really cool fancy brick |
|
|
-- |
-- |
Look at bowed window in dining room |
Osbaldo will look at it |
|
-- |
-- |
Master tile |
Complete repair and add grout |
|
-- |
-- |
Paint touch up under closet |
|
|
-- |
-- |
Door swing going into basement room wrong....??? |
|
|
-- |
-- |
Remove trash |
Osbaldo |
|
-- |
-- |
Need shoe around base of cabinet in basement bathroom |
Jeff |
|
-- |
-- |
Paint touch up in closet under stairs |
|
|
-- |
-- |
Install fridge |
Osbaldo will check |
|
-- |
-- |
Paint touch up pantry |
|
|
-- |
-- |
Fill all nail holes from mirrors |
|
|
-- |
-- |
Mailboxes labeled? Keys? |
Osbaldo? |
|
-- |
-- |
Toilet out far from wall in basement bath-can't open door |
|
|
-- |
-- |
Pave driveway |
|
|
-- |
-- |
Push fridge back- take cardboard out from under fridge |
|
|
-- |
-- |
Missing ceiling light- up hallway globe |
Still waiting on this from Ferguson |
|
-- |
-- |
Replace carpet and pad in basement |
Eagle Carpet |
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Repair nicks on cabinets |
Classic Kitchen |
|
-- |
-- |
Fill holes in shoe moulding at kitchen cabinets |
Classic Kitchen |
|
-- |
-- |
Adjust patio doors and install screens |
|
|
-- |
-- |
Add landscaping to box in backyard |
|
|
-- |
-- |
Repair nick in living room window |
Tom will coordinate |
|
-- |
-- |
Caulk at base of tubs |
|
|
-- |
-- |
Tighten master bathroom toilet seat |
Tom |
|
-- |
-- |
Adjust cabinet doors in upstairs hall bathroom |
Classic Kitchen |
|
-- |
-- |
Reinstall basement door and remove second door |
|
|
-- |
-- |
Install Street Sign |
Tuesday (per Mark the street sign guy) |
|
-- |
-- |
Needs hot water |
Mindy |
|
-- |
-- |
Install window screens |
Arriving Monday, Dec 18 |
|
-- |
-- |
COMCAST |
|
|
-- |
-- |
Install baseboard in basement |
|
|
-- |
-- |
Caulk in master bathroom at tub |
|
|
-- |
-- |
Install missing door knob in basement |
|
|
-- |
-- |
Touch up paint at basement door |
Isaac |
|
-- |
-- |
Where is garage door remote? |
|
|
-- |
-- |
Clean caulk out of bathtub |
Kelly |
|
-- |
-- |
Caulk at master bathroom at tub |
Isaac |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
6/13 |
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
6/26 framing second floor |
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
Thurs, Nov 2 |
|
-- |
-- |
Driveway (0)
|
Pouring Mon, Nov 20??? |
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
Landscaping done in front. Pettit put seed instead of sod and did not seed on side or back |
|
-- |
-- |
HVAC Rough In (4)
|
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Tues, Aug 15 |
|
-- |
-- |
Plumbing Rough In (4)
|
|
|
-- |
-- |
Electric Rough In (4)
|
Will be complete today 8/7 |
|
-- |
-- |
Exterior Vinyl (0)
|
Vinyl to start Tue, Oct 10 |
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
HEC to run conduit today |
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
Meter boxes are set, waiting on connection to meter box |
|
-- |
-- |
Order Interior Doors & Trim (0)
|
9/7: Mitch needs to order this ASAP |
|
-- |
-- |
Drywall (Hang) (4)
|
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
8/28 beginning today |
|
-- |
-- |
Paint 1 (1)
|
Saturday 9/9 |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
Osbaldo will put it in Mon, Nov 27 |
|
-- |
-- |
Cabinet Installation (2)
|
Delivered Sept 15, Installed Sept 18 |
|
-- |
-- |
Granite Installation (1)
|
Mon, Oct 2 |
|
-- |
-- |
Interior Trim - Install (3)
|
Mitch starting 9/11/2017 |
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Joe was waiting on tile |
|
-- |
-- |
Paint 2 (3)
|
Color on walls today 10/5 |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
waiting on buyer approval of designs |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
Mindy will request check from Nicolette on Mon, Nov 13 |
|
-- |
-- |
Electric Trim Out (3)
|
10/26: Harry is working on it |
|
-- |
-- |
HVAC Trim Out (1)
|
|
|
-- |
-- |
Plumbing Trim Out (2)
|
Close as of Oct 30 |
|
-- |
-- |
Install Appliances (0)
|
Installing Tues, Nov 7 |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
Thu, Oct 26 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Maybe waiting on driveway |
|
-- |
-- |
Inspection (Final Building) (2)
|
Thu, Nov 30 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
To Be Completed on Monday and Touch Up after Punch Out |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Monday 12/4 at 10:30- Pre-possession on evening of 12/6 |
|
-- |
-- |
Closing (1)
|
Wed, Dec 13 @ 9AM @ WVT |
|