ADDR
- 117  ::  374 Tanzanite Drive
[ BUILD: 17040010 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Order Appliances (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Inspection (Final HVAC) (1)      
Fri    Dec 26      Inspection (Final Plumbing) (1)      
Mon    Dec 29      Inspection (Final Electric) (1)      
Tue    Dec 30      Stain Hardwood Stairs (1) *       
Wed    Dec 31      Request Trash Tote From POA Manager (0)      
--   --   Missing Twin Dormers
--   --   Repair damaged tub Mindy - waiting on water and electricity
--   --   Adjust sewer stub is too close too the firewall Mindy
--   --   Garage door
--   --   Powder bath, change door swing Kate will tell Mitch
--   --   Pave driveway
--   --   Remove debris on Thursday for cleaners Tom
--   --   CODED LOCKBOX --- 3438
--   --   Where are extra keys?
--   --   COMCAST
--   --   Install weather stripping
--   --   Creaks in floor in 2nd and 3rd bedroom
--   --   Adjust laundry room door which is difficult to close
--   --   Upper level newel post needs sanding
--   --   Touch up paint
--   --   Remove coded lockbox
--   --   Vacuum floor vent ductwork
--   --   Repair bow in hall flooring above stairway Monday, Dec 18 - Eric
--   --   Install screens Arriving Monday, Dec 18
--   --   Paint final coat on front door (green)
--   --   Adjust cabinets next to refrigerator Adjust right door, straighten bar on left door
--   --   Repair missing chunk of window in master bedroom Isaac
--   --   Remove glue in corner of left window in master bedroom
--   --   Install missing bracket at shelves in master closet
--   --   Caulk gap at floor in pantry and install quarter round
--   --   Install missing stopper at upstairs hall bath Mindy
--   --   Clean inside refrigerator
--   --   Install PVC under back patio door
--   --   Adjust front door so lock is secure
--   --   Secure upper railing going to kitchen
--   --   Patch holes in mechnical room Majyer
--   --   Install additional light in basement
--   --   Touch up paint at edge of lower overhang Ceiling of foyer - Majyjyjyer
--   --   Clean basement bath
--   --   Secure plumbing in basement bathroom
--   --   Connect garage door opener to door
--   --   Fill and paint gaps at garage door frame
--   --   Raise chandelier Tom will tell Harry
--   --   Repair flooring issues on kitchen half of main level Tom meeting her today 4/23 after 12.
--   --   Cracked foundation wall Materials on order as of Aug 27
--   --   Extended warranty on foundation?
--   --   Patch drywall
--   --   Install carpet
--   --   Baseboard and paint
--   --   Water leak/drywall repair Ronnie re-caulking a/c line
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)       Started 9/7
-- -- Electric Rough In (4)       8/28 in process
-- -- Inspection (Rough In HVAC) (1)       Thursday, Sept14
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Complete today 10/9
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       Tue, Oct 10
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        in process
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        In process
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Beginning 10/23
-- -- Paint 2 (3)       In process
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Nearly complete- finishing week of 12/4
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Pay Mon, Dec 4
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        Nearly Complete- finishing 12/4
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *        Tue, Dec 5
-- -- Install Appliances (0) *        Mon, Dec 4
-- -- Paint 3 (2) *        In Process now complete by 12/4
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Wed, Dec 6 - Mindy will schedule
-- -- Pre Walk Through (0)       Thursday after meeting 12/7
-- -- Cleaning (1)       Tom will follow up with Kelly
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *       
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)       Wed, Dec 13 @ 12PM @ WVT
-- -- Remove Coded Lockbox (0)