Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Note: buyer changed tile from rectangle to square gray summit tile |
|
|
-- |
-- |
Remove the shower |
Mindy |
|
-- |
-- |
Repair the shower |
Mindy |
|
-- |
-- |
Can the buyer move his washer/dryer in before construction is complete? |
Tell Morgan.... |
|
-- |
-- |
Finish drywall at front door |
|
|
-- |
-- |
GREEN FRONT DOOR |
Needs painting as of October 13 |
|
-- |
-- |
Cover appliances |
Osbaldo |
|
-- |
-- |
Broken window in living room |
Tom will order sash |
|
-- |
-- |
CODED LOCKBOX --- 6787 |
|
|
-- |
-- |
Shoemold |
Mitch - Mon, Mar 12 |
|
-- |
-- |
Put fridge in place |
Osbaldo |
|
-- |
-- |
Fix window trim in upstairs bedroom |
Osbaldo?? |
|
-- |
-- |
Trim down closet doors in upstairs bedrooms |
Mitch |
|
-- |
-- |
Floor pops in middle of master bedroom |
Osbaldo |
|
-- |
-- |
Stain and seal hardwood treads on stairs |
|
|
-- |
-- |
Paint touchups throughout thome |
Isaac |
|
-- |
-- |
tighten all shower escutheons |
Osbaldo |
|
-- |
-- |
Adjust closet doors and trim bottom of doors |
Osbaldo - In bedroom behind hall bath |
|
-- |
-- |
Adjust patio doors |
Osbaldo |
|
-- |
-- |
Move fridge closer to cabinets |
Osbaldo |
|
-- |
-- |
Sliding glass door adjustment and adjust lock |
Osbaldo |
|
-- |
-- |
In basement, fix white wrap in corner |
|
|
-- |
-- |
Cut sewer clean out outside |
Osbaldo |
|
-- |
-- |
Fix front door dents or replace door |
Isaac |
|
-- |
-- |
Patch hole in brick where porch ties to house |
|
|
-- |
-- |
Caulk windows outside |
Osbaldo |
|
-- |
-- |
Adjust deadbolt |
Osbaldo |
|
-- |
-- |
Remove sticker from attic window |
Osbaldo |
|
-- |
-- |
Add pipe to downspout in front |
Osbaldo |
|
-- |
-- |
Fix laundry door |
Osbaldo |
|
-- |
-- |
Remove excess caulk from bath tub |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
In process as of Nov 13 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Inspection, Tues Dec 11 |
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
Harry starts Mon, Dec 4 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Maybe Mon, Dec 18 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Starting hanging Jan 2 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs sanding/ finish drywall at front door |
|
-- |
-- |
Paint 1 (1) |
Friday 1/19 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Del 2/2, install 2/5- nearly complete |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
In process by Darrell complete by Monday 2/5 |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Starting Monday 2/5 |
|
-- |
-- |
Paint 2 (3) |
2/15- in process |
|
-- |
-- |
Cover Floors (1) |
Wed, Feb 21 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
In process |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Fixtures being delivered Thursday 2/22 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Fixtures being delivered Thursday 2/22 |
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Paint 3 (2) * |
After shoemold |
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Robbie Miller going Friday, Mar 16 |
|
-- |
-- |
Inspection (Final Building) (2) * |
Fri, Mar 9 |
|
-- |
-- |
Pre Walk Through (0) |
Kate, Osbaldo, Tom - Thursday |
|
-- |
-- |
Cleaning (1) |
Wed, Mar 28 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Fri, Mar 23 |
|
-- |
-- |
Payment for Upgrades (0) |
$2,825 |
|
-- |
-- |
Closing (1) |
|
|