Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Install Stairs |
|
|
-- |
-- |
Move outlet in master for mirror |
Tom will call Vicente |
|
-- |
-- |
Letter from Trusswerks about "flipped" truss needed to city |
Trying again |
|
-- |
-- |
|
|
|
-- |
-- |
No CO by Feb 15 = $500; No CO by Mar 15 = $1000 |
|
|
-- |
-- |
Set meter bases |
Thu, Jan 25 |
|
-- |
-- |
Final trim out after doors arrive |
|
|
-- |
-- |
Fill nail holes and paint trim |
January 4/6 |
|
-- |
-- |
Start up the heater |
|
|
-- |
-- |
Whole House Blinds- including french doors |
not |
|
-- |
-- |
HEC installing electric in front of townhouses |
Monday, Jan 22 |
|
-- |
-- |
Curb & Gutter |
This morning 2/12 |
|
-- |
-- |
Road |
|
|
-- |
-- |
Water test |
waiting on results |
|
-- |
-- |
ordering new handles for fridge |
Tuesday, Feb 20 |
|
-- |
-- |
Final siding (return on front, A on front) |
|
|
-- |
-- |
Pantry shelving |
|
|
-- |
-- |
Pour front stoop and back pad |
Ready to be poured - pour Feb 13? |
|
-- |
-- |
Sidewalk |
Mon, Feb 19 |
|
-- |
-- |
Install new mirror |
|
|
-- |
-- |
Need door knob on linen closet door |
Kate will coordinate with Ron |
|
-- |
-- |
Install handrails at stairs |
Mitch |
|
-- |
-- |
Need kitchen shoe mold Classic |
Checking on timing |
|
-- |
-- |
Remove excess tile |
Osbaldo |
|
-- |
-- |
Clear off deck |
Osbaldo |
|
-- |
-- |
Where does buyer what his one dimmer switch? Kate to email and confirm |
|
|
-- |
-- |
Install water meter |
|
|
-- |
-- |
GREEN FRONT DOOR |
|
|
-- |
-- |
GREEN FRONT DOOR |
|
|
-- |
-- |
Entry stairs |
Handrails 2/15 |
|
-- |
-- |
Front door receptacle |
Vincente will move receptacle |
|
-- |
-- |
Paint touch up/ sand paint nail holes |
|
|
-- |
-- |
Connect outside HVAC unit |
Tuesday |
|
-- |
-- |
Sweep off deck |
|
|
-- |
-- |
Hole drywall above bath shower in hall bath |
|
|
-- |
-- |
Cut off bottom of closet doors. Up bedroom closet |
|
|
-- |
-- |
Caulk around trim and upstairs hall bathroom |
|
|
-- |
-- |
Caulk at & of trim in hallway before master bedroom |
|
|
-- |
-- |
Nicks in upstairs master bathtub |
|
|
-- |
-- |
Crack at ceiling in upstairs master bedroom closet |
|
|
-- |
-- |
Paint attic access panel |
Isaac |
|
-- |
-- |
Crack near ceiling in master bedroom |
|
|
-- |
-- |
Install screens in windows |
Osbaldo - after cleaning |
|
-- |
-- |
CODED LOCKBOX --- 2062 |
|
|
-- |
-- |
Home Inspection - March 7th at 9:00 AM |
|
|
-- |
-- |
Shower door installation |
Monday 3/5 |
|
-- |
-- |
blind installation |
JB put them in - maybe |
|
-- |
-- |
Hose out basement floors |
Osbaldo |
|
-- |
-- |
Caulk around kitchen sink |
Osbaldo |
|
-- |
-- |
Drywall cracks in master bathroom |
Isaac- 3/7 |
|
-- |
-- |
Recut paint lines master bedroom |
Isaac |
|
-- |
-- |
Adjust laundry pocket door |
Osbaldo |
|
-- |
-- |
Drywall patch around hall bath shower head |
Osbaldo |
|
-- |
-- |
Just closet doors and upstairs bedrooms |
|
|
-- |
-- |
Water pressure hall bath tub |
Mindy |
|
-- |
-- |
Over fridge and remove blue tape |
|
|
-- |
-- |
Continue hardwood to top of basement steps |
Eric |
|
-- |
-- |
Remove sticker on the window in attic |
Osbaldo |
|
-- |
-- |
Adjust closet doors and upstairs bedrooms |
Osbaldo |
|
-- |
-- |
Move over fridge and remove blue tape |
Osbaldo |
|
-- |
-- |
Caulk at kitchen backsplash |
Osbaldo |
|
-- |
-- |
Adjust size of laundry room doorway |
|
|
-- |
-- |
Cut off sewer clean outs |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
In process |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
Soon? (Feb 13?) |
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
Premier |
|
-- |
-- |
Sod / Seed / Landscaping (0) |
Pettit will complete after sidewalk is complete |
|
-- |
-- |
HVAC Rough In (4) |
Almost done as of 10/30 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Wed, Nov 15 -- Mindy will schedule |
|
-- |
-- |
Plumbing Rough In (4) |
Finishing week of 10/23 |
|
-- |
-- |
Electric Rough In (4) |
Finished by Tues, Nov 14 |
|
-- |
-- |
Exterior Vinyl (0) * |
1/21 siding 3/4 of the way complete |
|
-- |
-- |
Insulation (2) |
Thu, Nov 16 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Meter to be set Thu, Feb 1? |
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Joe |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Done by Mon, Dec 18 |
|
-- |
-- |
Paint 1 (1) |
Mon, Dec 18 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Del Jan 5, Install Jan 8 |
|
-- |
-- |
Granite Installation (1) * |
Tues, Jan 23 |
|
-- |
-- |
Interior Trim - Install (3) |
Mitch to start Tues, Dec 19? |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
1/22 |
|
-- |
-- |
Paint 2 (3) |
1/9 |
|
-- |
-- |
Cover Floors (1) |
Thursday? |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
all complete except pantry |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
Keys in island drawer |
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Nearly complete (vanity lights and exterior) |
|
-- |
-- |
HVAC Trim Out (1) |
Week of Jan 22 |
|
-- |
-- |
Plumbing Trim Out (2) |
1/29 |
|
-- |
-- |
Install Appliances (0) * |
Jan 25 |
|
-- |
-- |
Paint 3 (2) * |
1/30 |
|
-- |
-- |
Carpet (2) |
Jan 29 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Feb 22 |
|
-- |
-- |
Pre Walk Through (0) |
After meeting Thursday |
|
-- |
-- |
Cleaning (1) |
In process |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Closing (1) |
Friday, Mar 9 @ 10:00 AM |
|