| Tue | Dec 16 | Ratified Contract? (0) | ||
| Tue | Dec 16 | $2500 Deposit Received (0) | ||
| Tue | Dec 16 | Association Packet Requested (0) | ||
| Tue | Dec 16 | Association Packet Received (0) | ||
| Tue | Dec 16 | Selections Meeting (0) | ||
| Tue | Dec 16 | Selections Sheet Signed (0) | ||
| Tue | Dec 16 | Amendment for Upgrades (B,S,L,T,BCP) (0) | ||
| Tue | Dec 16 | Deposit For Upgrades Received (0) | ||
| Tue | Dec 16 | Inspection (Concrete Wall) (1) | ||
| Wed | Dec 17 | Inspection (Conduit Under Slab) (1) | ||
| Thu | Dec 18 | Inspection (Drain Tile) (0) | ||
| Thu | Dec 18 | Settlement Agent Confirmed (0) | ||
| Thu | Dec 18 | Verify Window & Roof Structure (0) | ||
| Thu | Dec 18 | Order Appliances (0) | ||
| Thu | Dec 18 | Patio (0) | ||
| Thu | Dec 18 | Rough In Microwave Vent (0) | ||
| Thu | Dec 18 | Inspection (Rough In Plumbing) (1) | ||
| Fri | Dec 19 | Inspection (Rough In Electric) (1) | ||
| Mon | Dec 22 | Inspection (Framing) (1) * | ||
| Tue | Dec 23 | Inspection (Deck Piers) (0) | ||
| Tue | Dec 23 | Exterior Stone (0) | ||
| Tue | Dec 23 | Set Electric Meter (0) * | ||
| Tue | Dec 23 | Inspection (Main Water Line) (0) | ||
| Tue | Dec 23 | Loan Approval (0) | ||
| Tue | Dec 23 | Deed Preparation (0) | ||
| Tue | Dec 23 | Mailbox (0) | ||
| Tue | Dec 23 | Order Plumbing / Lighting Fixtures (0) | ||
| Tue | Dec 23 | Interior Trim - Paint (1) | ||
| Wed | Dec 24 | Ceiling Fans (0) | ||
| Wed | Dec 24 | Blower Door Test (1) | ||
| Thu | Dec 25 | Inspection (Final HVAC) (1) | ||
| Fri | Dec 26 | Inspection (Final Plumbing) (1) | ||
| Mon | Dec 29 | Inspection (Final Electric) (1) | ||
| Tue | Dec 30 | Stain Hardwood Stairs (1) * | ||
| Wed | Dec 31 | Schedule Closing (0) | ||
| Wed | Dec 31 | Keys to Settlement Agent (0) | ||
| Wed | Dec 31 | Review Settlement Statement (0) | ||
| Wed | Dec 31 | Jerry Signs Closing Documents (0) | ||
| Wed | Dec 31 | Request Trash Tote From POA Manager (0) | ||
| Wed | Dec 31 | Remove Coded Lockbox (0) | ||
| -- | -- | Install Stairs | ||
| -- | -- | Move outlet in master for mirror | Tom will call Vicente | |
| -- | -- | Letter from Trusswerks about "flipped" truss needed to city | Trying again | |
| -- | -- | |||
| -- | -- | No CO by Feb 15 = $500; No CO by Mar 15 = $1000 | ||
| -- | -- | Set meter bases | Thu, Jan 25 | |
| -- | -- | Final trim out after doors arrive | ||
| -- | -- | Fill nail holes and paint trim | January 4/6 | |
| -- | -- | Start up the heater | ||
| -- | -- | Whole House Blinds- including french doors | not | |
| -- | -- | HEC installing electric in front of townhouses | Monday, Jan 22 | |
| -- | -- | Curb & Gutter | This morning 2/12 | |
| -- | -- | Road | ||
| -- | -- | Water test | waiting on results | |
| -- | -- | ordering new handles for fridge | Tuesday, Feb 20 | |
| -- | -- | Final siding (return on front, A on front) | ||
| -- | -- | Pantry shelving | ||
| -- | -- | Pour front stoop and back pad | Ready to be poured - pour Feb 13? | |
| -- | -- | Sidewalk | Mon, Feb 19 | |
| -- | -- | Install new mirror | ||
| -- | -- | Need door knob on linen closet door | Kate will coordinate with Ron | |
| -- | -- | Install handrails at stairs | Mitch | |
| -- | -- | Need kitchen shoe mold Classic | Checking on timing | |
| -- | -- | Remove excess tile | Osbaldo | |
| -- | -- | Clear off deck | Osbaldo | |
| -- | -- | Where does buyer what his one dimmer switch? Kate to email and confirm | ||
| -- | -- | Install water meter | ||
| -- | -- | GREEN FRONT DOOR | ||
| -- | -- | GREEN FRONT DOOR | ||
| -- | -- | Entry stairs | Handrails 2/15 | |
| -- | -- | Front door receptacle | Vincente will move receptacle | |
| -- | -- | Paint touch up/ sand paint nail holes | ||
| -- | -- | Connect outside HVAC unit | Tuesday | |
| -- | -- | Sweep off deck | ||
| -- | -- | Hole drywall above bath shower in hall bath | ||
| -- | -- | Cut off bottom of closet doors. Up bedroom closet | ||
| -- | -- | Caulk around trim and upstairs hall bathroom | ||
| -- | -- | Caulk at & of trim in hallway before master bedroom | ||
| -- | -- | Nicks in upstairs master bathtub | ||
| -- | -- | Crack at ceiling in upstairs master bedroom closet | ||
| -- | -- | Paint attic access panel | Isaac | |
| -- | -- | Crack near ceiling in master bedroom | ||
| -- | -- | Install screens in windows | Osbaldo - after cleaning | |
| -- | -- | CODED LOCKBOX --- 2062 | ||
| -- | -- | Home Inspection - March 7th at 9:00 AM | ||
| -- | -- | Shower door installation | Monday 3/5 | |
| -- | -- | blind installation | JB put them in - maybe | |
| -- | -- | Hose out basement floors | Osbaldo | |
| -- | -- | Caulk around kitchen sink | Osbaldo | |
| -- | -- | Drywall cracks in master bathroom | Isaac- 3/7 | |
| -- | -- | Recut paint lines master bedroom | Isaac | |
| -- | -- | Adjust laundry pocket door | Osbaldo | |
| -- | -- | Drywall patch around hall bath shower head | Osbaldo | |
| -- | -- | Just closet doors and upstairs bedrooms | ||
| -- | -- | Water pressure hall bath tub | Mindy | |
| -- | -- | Over fridge and remove blue tape | ||
| -- | -- | Continue hardwood to top of basement steps | Eric | |
| -- | -- | Remove sticker on the window in attic | Osbaldo | |
| -- | -- | Adjust closet doors and upstairs bedrooms | Osbaldo | |
| -- | -- | Move over fridge and remove blue tape | Osbaldo | |
| -- | -- | Caulk at kitchen backsplash | Osbaldo | |
| -- | -- | Adjust size of laundry room doorway | ||
| -- | -- | Cut off sewer clean outs | ||
| -- | -- | Building Permit (30) * | ||
| -- | -- | Order Roof & Floor Trusses (1) | ||
| -- | -- | Order Windows & Doors (0) | ||
| -- | -- | Stake Out Home (1) | ||
| -- | -- | Excavate (2) | ||
| -- | -- | Inspection (Footers) (1) | ||
| -- | -- | Pour Footers (1) * | ||
| -- | -- | Set Forms (2) | ||
| -- | -- | Pour Foundation Walls (1) | ||
| -- | -- | Plumb Slab (2) | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) | ||
| -- | -- | Prepare Slab (1) | ||
| -- | -- | Inspection (Slab) (1) | ||
| -- | -- | Pour Slab (1) * | ||
| -- | -- | Framing I (9) | ||
| -- | -- | Order Steps (0) | ||
| -- | -- | Order Tubs / Showers (0) | ||
| -- | -- | Framing II (8) | ||
| -- | -- | Framing III (8) * | ||
| -- | -- | Install Stairs (0) * | ||
| -- | -- | Windows & Doors (0) * | In process | |
| -- | -- | House Number and Status in Window (0) | ||
| -- | -- | Roofing (0) * | ||
| -- | -- | Order Cabinets (0) | ||
| -- | -- | Deck (0) | ||
| -- | -- | Gutters (0) | Soon? (Feb 13?) | |
| -- | -- | Driveway (0) * | ||
| -- | -- | Privacy Divider / Fence (0) * | Premier | |
| -- | -- | Sod / Seed / Landscaping (0) | Pettit will complete after sidewalk is complete | |
| -- | -- | HVAC Rough In (4) | Almost done as of 10/30 | |
| -- | -- | Plumbing Rough In (4) | Finishing week of 10/23 | |
| -- | -- | Electric Rough In (4) | Finished by Tues, Nov 14 | |
| -- | -- | Inspection (Rough In HVAC) (1) | Wed, Nov 15 -- Mindy will schedule | |
| -- | -- | Exterior Vinyl (0) * | 1/21 siding 3/4 of the way complete | |
| -- | -- | Insulation (2) * | Thu, Nov 16 | |
| -- | -- | Inspection (Insulation) (1) | ||
| -- | -- | Inspection (Electric Service) (0) | ||
| -- | -- | Inspection (Main Sewer Line) (0) | Meter to be set Thu, Feb 1? | |
| -- | -- | Order Interior Doors & Trim (0) | ||
| -- | -- | Drywall (Hang) (4) * | Joe | |
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * | Done by Mon, Dec 18 | |
| -- | -- | Paint 1 (1) | Mon, Dec 18 | |
| -- | -- | Garage Door (0) | ||
| -- | -- | House Numbers (0) | ||
| -- | -- | Cabinet Installation (2) * | Del Jan 5, Install Jan 8 | |
| -- | -- | Granite Installation (1) * | Tues, Jan 23 | |
| -- | -- | Interior Trim - Install (3) * | Mitch to start Tues, Dec 19? | |
| -- | -- | Luxury Vinyl Plank (3) * | ||
| -- | -- | Luxury Vinyl Tile (0) | 1/22 | |
| -- | -- | Paint 2 (3) | 1/9 | |
| -- | -- | Cover Floors (1) | Thursday? | |
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) | ||
| -- | -- | Shoe Moulding (0) | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * | all complete except pantry | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) | Keys in island drawer | |
| -- | -- | Pay Water / Sewer Taps (0) | ||
| -- | -- | Set Water Meter (0) * | ||
| -- | -- | Electric Trim Out (3) * | Nearly complete (vanity lights and exterior) | |
| -- | -- | HVAC Trim Out (1) * | Week of Jan 22 | |
| -- | -- | Plumbing Trim Out (2) * | 1/29 | |
| -- | -- | Install Appliances (0) * | Jan 25 | |
| -- | -- | Paint 3 (2) * | 1/30 | |
| -- | -- | Carpet (2) | Jan 29 | |
| -- | -- | Appraiser Confirms Construction Completion (0) | ||
| -- | -- | Inspection (Final Building) (2) * | Feb 22 | |
| -- | -- | Pre Walk Through (0) | After meeting Thursday | |
| -- | -- | Cleaning (1) | In process | |
| -- | -- | Certificate of Occupancy (1) * | ||
| -- | -- | C.O. to Lender (0) | ||
| -- | -- | Buyer Walk Through (1) * | ||
| -- | -- | Payment for Upgrades (0) | ||
| -- | -- | Closing (1) | Friday, Mar 9 @ 10:00 AM | |