reseed yard as needed |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Tom will inspect framing |
Finished basement with full bathroom |
|
-- |
-- |
Install last two twin windows (Jan 3) |
|
|
-- |
-- |
EXTEND DECK |
Tom |
|
-- |
-- |
Set furnace |
|
|
-- |
-- |
final paint touch up as marked |
|
|
-- |
-- |
final cleaning |
|
|
-- |
-- |
shoemold at base of french doors |
|
|
-- |
-- |
adjust closet doors upstairs bedrooms |
|
|
-- |
-- |
caulk in front of tubs and shower |
|
|
-- |
-- |
hall bath- fasten baseboard beside door |
|
|
-- |
-- |
add caluk to tile at laundry threshold |
|
|
-- |
-- |
caulk all toilets |
|
|
-- |
-- |
sand and paint rough door edges |
|
|
-- |
-- |
paint tops of doors |
|
|
-- |
-- |
adjust patio door |
|
|
-- |
-- |
basement bath- secure shoemold by door |
|
|
-- |
-- |
adjust basement patio door and latch |
|
|
-- |
-- |
access panel for water main cut off |
|
|
-- |
-- |
access panel low voltage box |
|
|
-- |
-- |
adjust door latch basement closet under stairs |
|
|
-- |
-- |
install window screens |
|
|
-- |
-- |
caulk bottom of all doors and jams on first floor |
|
|
-- |
-- |
dust all lights |
|
|
-- |
-- |
coat closet does not latch |
|
|
-- |
-- |
repair any damaged flooring after cardboard is removed |
|
|
-- |
-- |
install all shelves in kitchen cabinets |
|
|
-- |
-- |
fix hold in ceiling pantry |
|
|
-- |
-- |
clean tape off of light fixture in pantry |
|
|
-- |
-- |
put stop on pocket door so it will not open too far |
|
|
-- |
-- |
paint access panel to door in master closet |
|
|
-- |
-- |
fix ceiling in master bedroom at fan |
|
|
-- |
-- |
put strip at bathroom door in basement |
|
|
-- |
-- |
cut off bottom door going into furnace room |
|
|
-- |
-- |
put 2 screws in return air cover in furnace room |
|
|
-- |
-- |
put shoe molding down in closet under steps |
|
|
-- |
-- |
Put stop on master bathroom door |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
Framing to begin this week 10/16 |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
Sod needed |
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Tues, Feb 13 ? |
|
-- |
-- |
Plumbing Rough In (4) |
Mon, Jan 29 |
|
-- |
-- |
Electric Rough In (4) |
Finishing Mon, Feb 12 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Wed, Feb 14 ? |
|
-- |
-- |
Inspection (Insulation) (1) |
Thurs, Feb 15 |
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Stock Tuesday, Feb 20 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Will be finished Friday 3/9 |
|
-- |
-- |
Paint 1 (1) |
Monday 3/12 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
Fire extinguisher? |
|
-- |
-- |
Cabinet Installation (2) * |
Del Mar 23, Installed Mar 26 |
|
-- |
-- |
Granite Installation (1) * |
Thursday 4/19 |
|
-- |
-- |
Interior Trim - Install (3) |
Nearly complete |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Almost done as of Mar 19 |
|
-- |
-- |
Paint 2 (3) |
Tuesday 4/3 |
|
-- |
-- |
Cover Floors (1) |
Monday 4/9 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Maybe done? |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Melissa to take the check to pay. Tom to tell Melissa 4/23 |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Ready for Harry |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Tues, 4/17 |
|
-- |
-- |
Install Appliances (0) * |
Present, but not set, Apr 19 Need water |
|
-- |
-- |
Paint 3 (2) * |
Now, Apr 19 |
|
-- |
-- |
Carpet (2) |
4/16 installing now |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Lender ordering Friday, Apr 27 |
|
-- |
-- |
Inspection (Final Building) (2) * |
As soon as we have water |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
$3374 |
|
-- |
-- |
Closing (1) |
Friday, May 4 |
|