Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
GOLD FRONT DOOR |
|
|
-- |
-- |
Charlston brick, bone vinyl |
|
|
-- |
-- |
WIDEN DRIVEWAY |
|
|
-- |
-- |
Green door |
|
|
-- |
-- |
Green door |
|
|
-- |
-- |
Repaint door green |
|
|
-- |
-- |
CODED LOCKBOX --- 1274 |
|
|
-- |
-- |
Harry -- last three lights |
|
|
-- |
-- |
Repair chipped granite at stove |
Thursday, Aug 16 |
|
-- |
-- |
Fixing back step in patio |
|
|
-- |
-- |
Lights over mirrors |
Waiting on mirrors |
|
-- |
-- |
Would like to close on Aug 24 |
|
|
-- |
-- |
Fence |
Need price for six foot privacy fence instead |
|
-- |
-- |
Buyer would like to know if she can store things inside starting Fri, Aug 17 |
In the basement |
|
-- |
-- |
Water intrusion in basement bonus room |
Tom will look at this |
|
-- |
-- |
Last coat of poly on steps |
Mon, Aug 20 |
|
-- |
-- |
Paint Touch Up Throughout |
|
|
-- |
-- |
Receptacle needed outside of powder bathroom |
|
|
-- |
-- |
Secure Low Voltage Box |
|
|
-- |
-- |
Light Bulb for garage opener |
Osbaldo |
|
-- |
-- |
Caulk condensate line |
Osbaldo - around freon line |
|
-- |
-- |
Flashing between patio and siding |
Osbaldo - needs metal from Tom |
|
-- |
-- |
Crown Moulding at top of steps needs adjustment |
|
|
-- |
-- |
replace sash LR window |
|
|
-- |
-- |
Oak Shoemold at back patio door |
|
|
-- |
-- |
Oak Shoemold at back patio door |
|
|
-- |
-- |
Install Screens |
|
|
-- |
-- |
Patch chipped concrete |
Osbaldo |
|
-- |
-- |
Need Paint Touch Up Pens CK |
|
|
-- |
-- |
Replace floor register living room |
|
|
-- |
-- |
Replace front door handle installed incorrectly |
Wed, Aug 29 |
|
-- |
-- |
Final cleaning of floors |
|
|
-- |
-- |
replace toilet tank in up bathroom |
|
|
-- |
-- |
touch up drywall corners on tray ceiling |
|
|
-- |
-- |
adjust attic access panel |
|
|
-- |
-- |
master bath tub repair |
|
|
-- |
-- |
squeak in up bedroom floors |
|
|
-- |
-- |
Need latch hardware laundry door |
|
|
-- |
-- |
Mason- replace brick- right of garage door |
Tom told the mason |
|
-- |
-- |
Need screen on patio door |
|
|
-- |
-- |
Install fence |
|
|
-- |
-- |
Install flashing at patio |
|
|
-- |
-- |
Backyard fine tuning |
|
|
-- |
-- |
Caulking and painting |
|
|
-- |
-- |
ceiling to be painted after drywall fix |
Kate communicated to Maher on 7/22 |
|
-- |
-- |
correct dryer vent needed so leak does not reoccur?- TOM- Ronnie? |
leak into kitchen; Tom and GREG to meet with Cynthia to discuss. |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
October 23 and 24 |
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
|
|
-- |
-- |
Privacy Divider / Fence (0)
|
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
In process as of Apr 30 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
In process as of Monday, May 7 |
|
-- |
-- |
Electric Rough In (4)
|
Harry - just started as of Monday, May 7 |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
Thursday, May 17 |
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
Starting May 22 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
|
|
-- |
-- |
Paint 1 (1)
|
|
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
Installed June 26 |
|
-- |
-- |
Granite Installation (1)
|
|
|
-- |
-- |
Interior Trim - Install (3)
|
Finishing as of June 25 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
This week June 18 |
|
-- |
-- |
Paint 2 (3)
|
In process as of July 2 |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
In process 7/23 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
Mon, Aug 13 |
|
-- |
-- |
Set Water Meter (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
Harry |
|
-- |
-- |
HVAC Trim Out (1)
|
|
|
-- |
-- |
Plumbing Trim Out (2)
|
Mast & Brunk |
|
-- |
-- |
Install Appliances (0)
|
Scheduled for August 1 |
|
-- |
-- |
Paint 3 (2)
|
Tom will talk to Isaac |
|
-- |
-- |
Carpet (2)
|
8/6 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Jeff Eye going Aug 17 or soon thereafter |
|
-- |
-- |
Inspection (Final Building) (2)
|
Tues, Aug 14 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
Tues, Aug 21 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Tues, Aug 21 @ 5PM |
|
-- |
-- |
Payment for Upgrades (0)
|
$2,286 |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Closing (1)
|
Prefers to close Aug 24 |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|