Stone along left side of driveway never replaced after water meter excavation |
|
|
-- |
-- |
Gutter on back of house leaks at corner seam |
Greg will take a look at this 7/29 |
|
-- |
-- |
Buyer requested one year warranty punch items on 7/22- Kate responded by email and let buyers know we would be following up week of 7/29 |
FOLLOW UP ON PUNCH ITEMS WEEK OF 7/29- TOM/JB |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Pour garage slab |
|
|
-- |
-- |
RED FRONT DOOR |
|
|
-- |
-- |
5 foot tub/shower instead of shower only in master |
|
|
-- |
-- |
Country beige vinyl |
|
|
-- |
-- |
Confirm -- tub/shower in both baths? |
|
|
-- |
-- |
Tub/shower in both baths! |
|
|
-- |
-- |
Re-frame back of townhouse |
In process |
|
-- |
-- |
Pocket door to master bathroom |
|
|
-- |
-- |
Ceiling fans in guest rooms |
|
|
-- |
-- |
Framing wall in back of basement bonus room |
|
|
-- |
-- |
WIDEN DRIVEWAY |
|
|
-- |
-- |
WIDEN DRIVEWAY |
|
|
-- |
-- |
Need selection sheet |
|
|
-- |
-- |
Leak at top left corner of bump out in the basement |
Insulation is wet too |
|
-- |
-- |
Install deco light switches |
Tom telling Christian |
|
-- |
-- |
Install square electrical receptacles |
Tom telling Christian |
|
-- |
-- |
Oil Rubbed Bronze Light Fixtures |
Waiting to hear from Kara |
|
-- |
-- |
Front door sticks |
Osbaldo |
|
-- |
-- |
Peep hole |
Greg |
|
-- |
-- |
Moisture in concrete floor in unfinished bonus room? |
Tom will check on it today 7/23 |
|
-- |
-- |
Red |
|
|
-- |
-- |
Red door |
|
|
-- |
-- |
Buyer dropping off mirrors to be installed |
|
|
-- |
-- |
CODED LOCKBOX --- 9889 |
|
|
-- |
-- |
Change out faucet from oil rubbed bronze To stainless |
|
|
-- |
-- |
Wall bowed out on stairs??? |
|
|
-- |
-- |
Outlet to be moved- Master bath over sink |
Tom will tell Christian |
|
-- |
-- |
Remove towel bar to wall opposite vanity? |
Greg |
|
-- |
-- |
Patch drywall |
At stairs |
|
-- |
-- |
Master bedroom floor squeaks center of room |
|
|
-- |
-- |
Master bedroom drywall areas to be addressed on Tray ceiling |
|
|
-- |
-- |
Need attic access Panel-in master closet |
|
|
-- |
-- |
Install bathroom mirrors |
|
|
-- |
-- |
Adjust up closet doors in second and third bedroom |
|
|
-- |
-- |
Install door hardware on up closet bedroom |
|
|
-- |
-- |
Stain steps |
Evening of Mon, Aug 13 - dry by Wed mid-day |
|
-- |
-- |
Install handrail |
|
|
-- |
-- |
Sand all drywall patches |
|
|
-- |
-- |
Many electrical plates need to be screwed tighter to the wall |
|
|
-- |
-- |
Missing electrical faceplate in hallway leading to kitchen |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Clear out bonus room |
|
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Label electrical panel box |
|
|
-- |
-- |
Secure exterior receptacle at back of house |
|
|
-- |
-- |
Reverse (fix) hot and cold on upstairs hall bath |
|
|
-- |
-- |
Repair water hydrant on front with broken handle |
|
|
-- |
-- |
Peephole to be installe din front door |
|
|
-- |
-- |
Hole in staircase stringerat top of stairs from second to third floor |
|
|
-- |
-- |
Board on top of half wall on third floor cut and installed crooked |
|
|
-- |
-- |
Screen on back door does not close without latching |
|
|
-- |
-- |
Baseboard where dining room and powder room walls intersect sticks out and has a very sharp edge |
|
|
-- |
-- |
Latch on door from foyer to garage gets stuck and does not fully extend |
|
|
-- |
-- |
Chipped drywall at bottom of stairwell from 2nd to 3rd floor |
|
|
-- |
-- |
CLoset door hardware needed |
|
|
-- |
-- |
Holes in drywall in further most corners of pantry |
|
|
-- |
-- |
Lightbulbs missing in kitchen lights |
|
|
-- |
-- |
Address patch job where outlet was moved in master bath |
|
|
-- |
-- |
Trim on landing between 1st adn 2nd floor seems incomplete |
|
|
-- |
-- |
Mudding not finished on half wall above landing to main level where molding meets the wall |
|
|
-- |
-- |
Solution found to leaking dampness in unfinihsed portion of basement? |
|
|
-- |
-- |
Scratches in up bath shower |
|
|
-- |
-- |
Scratches in up bath shower |
Tom is coordinating with the tub repair person |
|
-- |
-- |
Paint sand top of hall bath/shower |
Tom will call Isaac |
|
-- |
-- |
Need oil rubbed bronze flush mount light |
Tom will install |
|
-- |
-- |
I just right wall sconce on stairwell |
|
|
-- |
-- |
Final cleaning the floors and wipe surfaces |
|
|
-- |
-- |
Dimmer switch flickers in living room |
|
|
-- |
-- |
Move the vanity light in the powder room space it based on upstairs bathrooms |
|
|
-- |
-- |
Missing screw on outside water Spicket back patio |
|
|
-- |
-- |
Better fill for nail holes at black door trim |
|
|
-- |
-- |
Towel bar and hook in master bathroom |
Carlos |
|
-- |
-- |
Landing to second floor gap in flooring |
Osbaldo will do the complicated thing Tom described |
|
-- |
-- |
Peep hole in front door to be moved |
|
|
-- |
-- |
Front door paint touch up |
Not done 12/14 |
|
-- |
-- |
Wall in powder room to be painted from patch |
|
|
-- |
-- |
Need buyer contact info |
|
|
-- |
-- |
Adam number- 7576209858 |
|
|
-- |
-- |
Fix flooring at landing on stairs and shoe mold |
|
|
-- |
-- |
Touch up paint trim |
Osbaldo |
|
-- |
-- |
Install flashing at patio |
Osbaldo |
|
-- |
-- |
Loud grinding sound in garbage disposal |
Tom |
|
-- |
-- |
Patch drywall corners |
Joe |
|
-- |
-- |
Repalce Master bath fan |
Osbaldo to get fan from Harry |
|
-- |
-- |
Replacing stone? |
Brown stone between driveways |
|
-- |
-- |
Paint stairwell |
Isaac |
|
-- |
-- |
Request (Jan 10) for the entire townhouse to be repainted |
|
|
-- |
-- |
Basement Water Issues |
|
|
-- |
-- |
Leak in foundation wall still occurring |
|
|
-- |
-- |
Multiple drywall touch up areas - cracks, nail pops, etc. |
Tom to talk to Joe 7/29 |
|
-- |
-- |
homeowners notified about drain/driveway issue? |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
October 23 and 24 |
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
In process as of Apr 30 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Done as of Monday, May 7 |
|
-- |
-- |
Electric Rough In (4) |
Done week of May 7 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
Mon, May 14 |
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Hanging as of May 17 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Installed June 26 |
|
-- |
-- |
Granite Installation (1) * |
July 11 - 13 |
|
-- |
-- |
Interior Trim - Install (3) |
Finishing today June 18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Working on this today June 18 |
|
-- |
-- |
Paint 2 (3) |
Started as of July 2 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Started |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 7/23 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Needs to take place. Tom to get with him on that. |
|
-- |
-- |
Install Appliances (0) * |
Scheduled for July 27 |
|
-- |
-- |
Paint 3 (2) * |
Final painting |
|
-- |
-- |
Carpet (2) |
Aug 9 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
Thursday, Aug 9 |
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|