--   --   Touch up front door paint Isaac/ not done 12/14
--   --   Rachel = 434-422-2380
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Inspection (Final HVAC) (1)      
Tue    Dec 10      Inspection (Final Plumbing) (1)      
Wed    Dec 11      Inspection (Final Electric) (1)      
Thu    Dec 12      Stain Hardwood Stairs (1)      
Fri    Dec 13      Schedule Closing (0)      
Fri    Dec 13      Keys to Settlement Agent (0)      
Fri    Dec 13      Review Settlement Statement (0)      
Fri    Dec 13      Jerry Signs Closing Documents (0)      
Fri    Dec 13      Request Trash Tote From POA Manager (0)      
Fri    Dec 13      Remove Coded Lockbox (0)      
--   --   Pour garage slab
--   --   GREEN FRONT DOOR
--   --   Dormer windows
--   --   Framing adjustment - upstairs bath needs to be 25" not 23.5" Vanity and top will come into doorway opening
--   --   Carters grove brick, ivory vinyl on back
--   --   Fix pantry framing
--   --   Add gable
--   --   PLEASE WIDEN DRIVEWAY FOR A SECOND PARKING SPOT
--   --   EggSHELL Paint
--   --   CODED LOCKBOX --- 1028
--   --   Final keys?
--   --   Get water check on Monday to submit
--   --   Davenport to install deadbolts And door knobs And mirrors
--   --   Fix Creak at top of stairs two bedroom level Osbaldo
--   --   Fix creaking floor along the wall in guest bedrooms Osbaldo
--   --   Fix drywall hole around escutcheon in hall bathroom Osbaldo
--   --   Fix cap at top of half wall on stairs Isaac trim
--   --   Fix overflow on tub in hall bathroom Tom will tell Kara
--   --   Fix over cuts in all drywall at receptacles Osbaldo
--   --   Caulk in front of all tubs and showers Osbaldo
--   --   Install window screens Osbaldo
--   --   Patch drywall hole I just gotten behind toilet in upstairs hall bathroom Osbaldo
--   --   Drywall hole escutcheon master bathroom shower head Osbaldo
--   --   Six messed up the drywall and ceiling at tray in master bedroom Joe
--   --   Creek in floor in master bedroom near master bathroom wall Osbaldo
--   --   Final paint touch up Isaac
--   --   Staining steps Isaac
--   --   Green door
--   --   Install semi-frameless swinging shower door in master bathroom Ron measuring July 30, arrives a week or two later
--   --   Adjust drainage in backyard
--   --   Adjust drainage in backyard - large puddles of stagnant water Tom
--   --   Water seems to be seeping into the garage from the left interior wall.
--   --   Fix drywall and ceiling at tray in master bedroom Joe
--   --   Fix drywall bowing in bonus room (to right upon entry) Joe
--   --   Was $200 upgrade for hardwood in pantry to include space under stairs? no
--   --   Was eggshell paint used? Isaac
--   --   Paint touch up throughout
--   --   Touch up paint at front door Isaac
--   --   Clean brick exterior Mason
--   --   Install missing outlet plates, tighten outlet plates, add outlet plate screws
--   --   Tighten door hinges at downstairs bathroom door
--   --   Install shower curtain rod in downstairs bathroom
--   --   Add support for floating threshold at person door to garage
--   --   Remove cover on smoke detector in basement bonus room
--   --   Remove sticker from far right living room window
--   --   Install missing light bulb in kitchen pendant light
--   --   Fix bow in drywall in pantry - wall above fire extinguisher Osbaldo
--   --   Caulk gap at drywall and trim in bonus space behind pantry
--   --   Paint closet doors in guest bedrooms Isaac - edges
--   --   Adjust door to left guest bedroom which will not stay open
--   --   Install hardware on pocket door to laundry room
--   --   Caulk at perimeter of dryer vent pan will look better without caulk
--   --   Adjust master bathroom linen closet handle
--   --   Replace broken threshold between downstairs bathroom and bonus room Eric
--   --   Repair door bell Harry
--   --   Clean in closet under stairs Osbaldo
--   --   Remove drywall and paint from carpet in upstairs hall ?
--   --   Install missing cable outlet in bonus room Harry
--   --   Paint drywall patch in pantry and install shelves
--   --   Add missing moratr to piece of brick at top right of exterior garage door
--   --   Clean and vacuum the townhouse Kelly
--   --   Paint patched drywall in bonus room Isaac - paint
--   --   Paint drywall patch in pantry and install shelves Isaac - paint
--   --   Add missing mortar to piece of brick at top right of exterior garage door Osbaldo will look at it, but repair may not be possible
--   --   Repair front door knob Greg
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)       October 23 and 24
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)       Monday, May 7
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)       Sidewalk done, driveway in process, patio is formed ready to be poured
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)       Fri, July 20
-- -- HVAC Rough In (4)       Started as of 4/16
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       Ready to start Apr 23, back May 1 to finish
-- -- Electric Rough In (4)       Graves, done by Apr 30
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)       Tuesday, May 8
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Hanging Mon May 14
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)       Ready to paint as of May 21
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivered June 8, Installed June 11
-- -- Granite Installation (1) *        June 28
-- -- Interior Trim - Install (3)       Isaac
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)       Thursday June 21
-- -- Shoe Moulding (0)       Isaac
-- -- Shelving, Door Knobs, Fire Extinguisher (0)      
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)       Please get check Monday
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       Nearly complete. chandelier extend
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Not started as of July 2
-- -- Install Appliances (0) *        Tuesday, July 10
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Pushing this to the end of the week of 7/23
-- -- Inspection (Final Building) (2) *        July 17
-- -- Pre Walk Through (0)       6/12
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1)       End of week 6/24?...depending on progress
-- -- Payment for Upgrades (0)       $120 credit
-- -- Closing (1)