Touch up front door paint |
Isaac/ not done 12/14 |
|
-- |
-- |
Rachel = 434-422-2380 |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Pour garage slab |
|
|
-- |
-- |
GREEN FRONT DOOR |
|
|
-- |
-- |
Dormer windows |
|
|
-- |
-- |
Framing adjustment - upstairs bath needs to be 25" not 23.5" |
Vanity and top will come into doorway opening |
|
-- |
-- |
Carters grove brick, ivory vinyl on back |
|
|
-- |
-- |
Fix pantry framing |
|
|
-- |
-- |
Add gable |
|
|
-- |
-- |
PLEASE WIDEN DRIVEWAY FOR A SECOND PARKING SPOT |
|
|
-- |
-- |
EggSHELL Paint |
|
|
-- |
-- |
CODED LOCKBOX --- 1028 |
|
|
-- |
-- |
Final keys? |
|
|
-- |
-- |
Get water check on Monday to submit |
|
|
-- |
-- |
Davenport to install deadbolts And door knobs |
And mirrors |
|
-- |
-- |
Fix Creak at top of stairs two bedroom level |
Osbaldo |
|
-- |
-- |
Fix creaking floor along the wall in guest bedrooms |
Osbaldo |
|
-- |
-- |
Fix drywall hole around escutcheon in hall bathroom |
Osbaldo |
|
-- |
-- |
Fix cap at top of half wall on stairs |
Isaac trim |
|
-- |
-- |
Fix overflow on tub in hall bathroom |
Tom will tell Kara |
|
-- |
-- |
Fix over cuts in all drywall at receptacles |
Osbaldo |
|
-- |
-- |
Caulk in front of all tubs and showers |
Osbaldo |
|
-- |
-- |
Install window screens |
Osbaldo |
|
-- |
-- |
Patch drywall hole I just gotten behind toilet in upstairs hall bathroom |
Osbaldo |
|
-- |
-- |
Drywall hole escutcheon master bathroom shower head |
Osbaldo |
|
-- |
-- |
Six messed up the drywall and ceiling at tray in master bedroom |
Joe |
|
-- |
-- |
Creek in floor in master bedroom near master bathroom wall |
Osbaldo |
|
-- |
-- |
Final paint touch up |
Isaac |
|
-- |
-- |
Staining steps |
Isaac |
|
-- |
-- |
Green door |
|
|
-- |
-- |
Install semi-frameless swinging shower door in master bathroom |
Ron measuring July 30, arrives a week or two later |
|
-- |
-- |
Adjust drainage in backyard |
|
|
-- |
-- |
Adjust drainage in backyard - large puddles of stagnant water |
Tom |
|
-- |
-- |
Water seems to be seeping into the garage from the left interior wall. |
|
|
-- |
-- |
Fix drywall and ceiling at tray in master bedroom |
Joe |
|
-- |
-- |
Fix drywall bowing in bonus room (to right upon entry) |
Joe |
|
-- |
-- |
Was $200 upgrade for hardwood in pantry to include space under stairs? |
no |
|
-- |
-- |
Was eggshell paint used? |
Isaac |
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
Touch up paint at front door |
Isaac |
|
-- |
-- |
Clean brick exterior |
Mason |
|
-- |
-- |
Install missing outlet plates, tighten outlet plates, add outlet plate screws |
|
|
-- |
-- |
Tighten door hinges at downstairs bathroom door |
|
|
-- |
-- |
Install shower curtain rod in downstairs bathroom |
|
|
-- |
-- |
Add support for floating threshold at person door to garage |
|
|
-- |
-- |
Remove cover on smoke detector in basement bonus room |
|
|
-- |
-- |
Remove sticker from far right living room window |
|
|
-- |
-- |
Install missing light bulb in kitchen pendant light |
|
|
-- |
-- |
Fix bow in drywall in pantry - wall above fire extinguisher |
Osbaldo |
|
-- |
-- |
Caulk gap at drywall and trim in bonus space behind pantry |
|
|
-- |
-- |
Paint closet doors in guest bedrooms |
Isaac - edges |
|
-- |
-- |
Adjust door to left guest bedroom which will not stay open |
|
|
-- |
-- |
Install hardware on pocket door to laundry room |
|
|
-- |
-- |
Caulk at perimeter of dryer vent pan |
will look better without caulk |
|
-- |
-- |
Adjust master bathroom linen closet handle |
|
|
-- |
-- |
Replace broken threshold between downstairs bathroom and bonus room |
Eric |
|
-- |
-- |
Repair door bell |
Harry |
|
-- |
-- |
Clean in closet under stairs |
Osbaldo |
|
-- |
-- |
Remove drywall and paint from carpet in upstairs hall |
? |
|
-- |
-- |
Install missing cable outlet in bonus room |
Harry |
|
-- |
-- |
Paint drywall patch in pantry and install shelves |
|
|
-- |
-- |
Add missing moratr to piece of brick at top right of exterior garage door |
|
|
-- |
-- |
Clean and vacuum the townhouse |
Kelly |
|
-- |
-- |
Paint patched drywall in bonus room |
Isaac - paint |
|
-- |
-- |
Paint drywall patch in pantry and install shelves |
Isaac - paint |
|
-- |
-- |
Add missing mortar to piece of brick at top right of exterior garage door |
Osbaldo will look at it, but repair may not be possible |
|
-- |
-- |
Repair front door knob |
Greg |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
October 23 and 24 |
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
Monday, May 7 |
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Sidewalk done, driveway in process, patio is formed ready to be poured |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
Fri, July 20 |
|
-- |
-- |
HVAC Rough In (4) |
Started as of 4/16 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
Ready to start Apr 23, back May 1 to finish |
|
-- |
-- |
Electric Rough In (4) |
Graves, done by Apr 30 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Tuesday, May 8 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Hanging Mon May 14 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
Ready to paint as of May 21 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivered June 8, Installed June 11 |
|
-- |
-- |
Granite Installation (1) * |
June 28 |
|
-- |
-- |
Interior Trim - Install (3) |
Isaac |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
|
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Thursday June 21 |
|
-- |
-- |
Shoe Moulding (0) |
Isaac |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Please get check Monday |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Nearly complete. chandelier extend |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Not started as of July 2 |
|
-- |
-- |
Install Appliances (0) * |
Tuesday, July 10 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Pushing this to the end of the week of 7/23 |
|
-- |
-- |
Inspection (Final Building) (2) * |
July 17 |
|
-- |
-- |
Pre Walk Through (0) |
6/12 |
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
End of week 6/24?...depending on progress |
|
-- |
-- |
Payment for Upgrades (0) |
$120 credit |
|
-- |
-- |
Closing (1) |
|
|