-- |
-- |
Touch up paint on front door at white scratch/spot |
Isaac/not done 12/14 |
|
-- |
-- |
Curb of driveway at one side is very high |
Tom will Adam that Jerry said Adam should fix it. |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Pour garage slab |
|
|
-- |
-- |
GOLD FRONT DOOR |
|
|
-- |
-- |
Extended patio is not possible? |
Please let Basil know |
|
-- |
-- |
Bone vinyl |
|
|
-- |
-- |
Possible want a fence |
Tom marking out borders |
|
-- |
-- |
12 x 18 deck instead of patio, with stairs |
June 4 |
|
-- |
-- |
Fix pantry framing |
|
|
-- |
-- |
Remove gable |
|
|
-- |
-- |
Expanded deck or expanded patio?? |
|
|
-- |
-- |
WIDEN DRIVEWAY |
|
|
-- |
-- |
Instruct buyer to drop off ceiling fans when its time for electrical punch out |
Kate will take care of this. |
|
-- |
-- |
Need peep hole and door knobs |
Complete by Wed, June 13 |
|
-- |
-- |
Siding on dormers |
Greg |
|
-- |
-- |
Wrap garage doors |
Greg |
|
-- |
-- |
CODED LOCKBOX --- 8600 |
|
|
-- |
-- |
Steps for deck |
|
|
-- |
-- |
Repair drain leak |
Thursday, Jul 5 |
|
-- |
-- |
Carpet in room in basement |
Jul 12 |
|
-- |
-- |
Final paint and staining steps |
|
|
-- |
-- |
Install appliances |
In garage |
|
-- |
-- |
Christian Graves to extend pendant lighting over island |
Christian |
|
-- |
-- |
Finishing electrical |
Christian |
|
-- |
-- |
Patch drywall hole in master closet |
Osbaldo |
|
-- |
-- |
Closet doors to be trimmed and adjusted and both upstairs bedrooms |
Isaac |
|
-- |
-- |
Small patch in upstairs hall bathroom |
Osbaldo |
|
-- |
-- |
Caulk in front of tubs and showers |
Osbaldo |
|
-- |
-- |
Patch hole next to electrical outlet in upstairs right guest bedroom |
Osbaldo |
|
-- |
-- |
Patch drywall hole on landing at stairs |
Osbaldo |
|
-- |
-- |
Install handrails on stairwells |
Isaac |
|
-- |
-- |
Caps for screw holes French doors |
Osbaldo |
|
-- |
-- |
PVC board at French doors exterior |
Osbaldo |
|
-- |
-- |
Install screens on the windows and doors |
Osbaldo |
|
-- |
-- |
Patch concrete in the basement bonus room |
Osbaldo |
|
-- |
-- |
Patch hole at dishwasher |
Osbaldo |
|
-- |
-- |
Install deadbolt at back the French door |
Davenport |
|
-- |
-- |
I just bathroom door lock on master bathroom |
Osbaldo |
|
-- |
-- |
Address access panel in master closet |
Osbaldo |
|
-- |
-- |
Check all door hardware to make sure doors close properly |
Osbaldo |
|
-- |
-- |
Wash out garage |
Osbaldo |
|
-- |
-- |
Need covers for low-voltage box and electrical panel in garage |
Christian |
|
-- |
-- |
|
|
|
-- |
-- |
Cable missing in bonus room |
Christian at Graves needs to go back |
|
-- |
-- |
Remove cardboards |
|
|
-- |
-- |
Install appliances |
Tuesday 6/17 |
|
-- |
-- |
Right rear corner of the house downspouts should be extended to have water drain at least 6 feet from the house |
|
|
-- |
-- |
Replace board along outside edge of the deck that is warped and curves upwards |
|
|
-- |
-- |
Secure a cover on open junction box near the ceiling in utility closet |
Osbaldo 7/23 |
|
-- |
-- |
Covers requested for fluorescent lights and first floor closet both second floor closet in the basement utility room |
|
|
-- |
-- |
Add caulking around the escutcheon plate and tub spout and second floor and basement bathrooms |
|
|
-- |
-- |
Showerhead in both the second floor in master bathroom have a leak where the showerhead attaches to the shower arm the head should be removed and a layer of plumbers tape applied to the threats of the shower arm |
|
|
-- |
-- |
First floor bathroom does not latch and stay closed the striker plate on the door frame needs to be adjusted |
|
|
-- |
-- |
Add a doorstop to basement bathroom door |
|
|
-- |
-- |
Yellow door |
|
|
-- |
-- |
Davenport- Please make sure to always check and readjust the striker plates so that doors closed securely |
Tom to relay this to Davenport |
|
-- |
-- |
Clean under kitchen sink |
|
|
-- |
-- |
Raise pendant lights up 6 inches |
Osbaldo 7/23l |
|
-- |
-- |
Touch up paint throughout paint stair risers |
Tom to talk to Isaac today 7/23 |
|
-- |
-- |
Railing Tom. |
Tom to give a price...should handle outside of closing. |
|
-- |
-- |
Install cover over cable outet in living room |
Tom to get cover from Graves |
|
-- |
-- |
Adjust closet door in smallest bedroom that is hard to close |
Osbaldo |
|
-- |
-- |
Patch drywall holes at ceiling by outlet |
Osbaldo - in garage |
|
-- |
-- |
Secure loose hardwood at top of stairs from main entrance |
Osbaldo |
|
-- |
-- |
Remove stain on carpet in bonus room |
Eric called buyer...buyer will contact Eric when he has the room cleaned out |
|
-- |
-- |
Refrigerator drawer keeps falling out |
Cabinet drawer |
|
-- |
-- |
Fill holes in back yard |
Pettit |
|
-- |
-- |
Cable outlet instead of full cover plate |
bonus room |
|
-- |
-- |
Cable missing in outside box |
Christian at Graves needs to go back |
|
-- |
-- |
Weatherstripping at threshold between garage and hall |
Osbaldo |
|
-- |
-- |
Master bathroom door cannot be locked |
|
|
-- |
-- |
Draft coming in at one of the dining room windows |
|
|
-- |
-- |
Upstairs floors (mostly in small bedrooms) creak close to walls |
|
|
-- |
-- |
Master Bathroom door cannot be locked |
|
|
-- |
-- |
Osbaldo to go at 10:00 on Monday 1/28 |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
October 23 and 24 |
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
Finishing up |
|
-- |
-- |
Install Stairs (0) |
Wed, Apr 4 |
|
-- |
-- |
Windows & Doors (0) |
Half as of 4/9 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
Stocking Wed, Apr 11 |
|
-- |
-- |
Order Cabinets (0) |
Tues, May 1 |
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
Wed, June 27 |
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
Seed and straw Mon Jul 16 |
|
-- |
-- |
HVAC Rough In (4) |
Wed, Apr 11 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Friday, April 27 |
|
-- |
-- |
Plumbing Rough In (4) |
Monday 4/23 in process- complete today |
|
-- |
-- |
Electric Rough In (4) |
Monday 4/23 |
|
-- |
-- |
Exterior Vinyl (0) * |
After 119 |
|
-- |
-- |
Insulation (2) |
Monday, April 30 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Last skim coat - Fri, May 11 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
Wed, Jun 13 |
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivered June 1, Installed June 4 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
Isaac Galindez trim guy |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Started as of May 21 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
In process of doing so as of June 25 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Add peephole to front door |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Jerry will let Nicolette know |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process of doing so as of June 25 |
|
-- |
-- |
HVAC Trim Out (1) |
Needs to be hooked up as of June 25 |
|
-- |
-- |
Plumbing Trim Out (2) |
Just waiting on half bathroom |
|
-- |
-- |
Install Appliances (0) * |
Scheduled for Thursday, June 28 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
Scheduled for Monday, July 2 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
Johnny Hensley - July 20 or 23 |
|
-- |
-- |
Inspection (Final Building) (2) * |
Mon, Jul 16 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Sunday, July 15 - Monday, July 16 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
And to Welby |
|
-- |
-- |
Buyer Walk Through (1) |
|
|
-- |
-- |
Payment for Upgrades (0) |
$2200? |
|
-- |
-- |
Closing (1) |
|
|