- 76  ::  310 Sapphire Drive
[ BUILD: 1802-0115 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Stephen Payne
--   --   Cracked master bathroom floor tile Joe, Tile Time, is scheduling with Stephen and Tom a good time to come out
--   --   Upstairs flooring and subflooring creaks throughout upper floor Will be fixed at same time as Tile
--   --   Cracked tile in basement bathroom Joe, Tile Time, is scheduling with Stephen and Tom a good time to come out
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Inspection (Final HVAC) (1)      
Tue    Dec 10      Inspection (Final Plumbing) (1)      
Wed    Dec 11      Inspection (Final Electric) (1)      
Thu    Dec 12      Stain Hardwood Stairs (1)      
Fri    Dec 13      Request Trash Tote From POA Manager (0)      
--   --   COUNTRY BEIGE VINYL- GREEN FRONT DOOR
--   --   Added window in basement Framed and window was delivered to be installed this week 7/23
--   --   Crown mounding main level
--   --   Once cabients and gtanite are in schedule customer walk through
--   --   Buyer providing mirrors
--   --   Buyer Walk Through - Nov 9 @ 12:30 PM
--   --   Buyer to drop off mirrors- lights to be installed above mirrors
--   --   Mirrors- master bathroom- dimensions are 28x 40- options for sconce lights?
--   --   Yard amendment
--   --   Loud noise in ductwork
--   --   Need to close by Dec 15!
--   --   Potential “hump” in master floor (see pic)
--   --   Potential “hump” in master floor (see pic)
--   --   CODED LOCKBOX 1225
--   --   Fill nail holes In Centcenter board in kitchen Buddy
--   --   Squeaky floor and up hallway by wall between full bath and laundry room
--   --   Floor pops in second bedroom all along wall between rooms Osbaldo
--   --   Flip-flops in other upstairs that ran by wall Between rooms Osbaldo
--   --   Add electrical outlet to pantry
--   --   Upstairs guest bedroom trim issues (see pics)
--   --   Benjamin Meredith, Inspection, Fri, Dec 14, 9AM;
--   --   Paint touch up
--   --   Fix two large drywall holes behind hall and master bath mirrors
--   --   Replace window grids in basement
--   --   Stain nail holes in kitchen hardwood
--   --   No stain pen - need new one for coco cabinet
--   --   Replace nosing at top of stairs
--   --   hose faucet is loose at the wall in the 1st floor bathroom ( below the sink. left side)
--   --   Observed a cracked gable end truss in the attic, as well as a loose nail plate adjacent; recommend having a licensed contractor repair. (See Figure #10)
--   --   Recommend installing gutter downspout extensions where they are missing to improve the water control at the perimeter of the foundation. (See Figure #1) (See Figure #2)
--   --   Observed the rear hose faucet is loose at the wall; recommend having the faucet fastened as intended. (See Figure #5)
--   --   Noted master bedroom Arc fault breaker does not trip when tested, and there is a wire extending into the breaker panel that is missing its wire clamp; recommend repair by a licensed electrician. (See Figure #3) (See Figure #4)
--   --   Observed cracked floor tiles in the master bathroom; recommend repair as necessary. (See Figure #6)
--   --   Second floor bedroom door knob is loose; recommend repair. (See Figure #8)
--   --   Second floor rear bedroom window lock does not function as intended; recommend repair. (See Figure #9)
--   --   The basement bathroom shower head water flow is minimal; recommend further evaluation and repair as necessary. (See Figure #7)
--   --   We noticed that the water flow/pressure throughout the house is very weak - it was noted in the punch list). -------------
--   --   Raise powder bath mirror several inches
--   --   Drywall holes in upstairs bathroom outlets below mirrors
--   --   Raise powder bath mirror two inches
--   --   Missing screens
--   --   Issue with coax cable inside the home
--   --   Water leak at light above refrigerator Will need drywall, paint
--   --   Crack in tile in master and basement bathroom Joe
--   --   Low flow at basement shower
--   --   Cracking tile floors Tile is in as of June 17
--   --   Low water pressure in the basement shower Bobby in contact with Stephen
--   --   Truss meeting - 2PM on Jan 2
--   --   Creaky floors
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)       Tue, Mar 27
-- -- Pour Footers (1)       Tue, Mar 27
-- -- Set Forms (2)       Mon, Apr 2
-- -- Pour Foundation Walls (1)       Wed, Apr 4
-- -- Plumb Slab (2)       finish 76-81 Mon (4/16) pending weather - insp (4/17)
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *        Wed 4/25 start- approximately 2 day
-- -- Framing I (9)       Two to three weeks as of May 7, 2018
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *        Trusses Tuesday June 12 ALL SET
-- -- Install Stairs (0)       Monday, July 9
-- -- Windows & Doors (0)       Missing three windows
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)       Waiting on plywood
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       Starting July 30
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       Bobby - hopefully starting Tues, Sept 4
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)       Tuesday, Sep 11
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)       Just waiting on water lines
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Starting Sep 14
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Needs sanding as of Oct 1
-- -- Paint 1 (1)       Week of Oct 8
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivered 10/1, installed 10/2
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)       Started as of Oct 11
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Shelving, No mirrors needed
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       Missing eight snap lights
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)      
-- -- Install Appliances (0) *        Thu Dec 6
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Tell Scott Brown
-- -- Inspection (Final Building) (2) *        Tuesday afternoon (Dec 11)
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Dec 13 at 12:20 PM
-- -- Payment for Upgrades (0)       $725
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)       Dec 14 at 11AM
-- -- Remove Coded Lockbox (0)