Melissa and Tariq 702-596-5697 |
mellysaw@gmail.com |
|
Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
|
-- |
-- |
CARTERS GROVE BRICK, BONE VINYL, GOLD FRONT DOOR |
|
|
-- |
-- |
Add three HDMI outlets living room master and bonus room. |
|
|
-- |
-- |
Extend the deck |
|
|
-- |
-- |
Hardwood steps - yay! |
Delivered Sep 21 |
|
-- |
-- |
Shower head |
American Standard Shower Head Shower Accessory |
|
-- |
-- |
Replace microwave |
On order |
|
-- |
-- |
Back ordered stove |
On order |
|
-- |
-- |
Door locks |
Mon, Dec 3 |
|
-- |
-- |
Hand rails |
|
|
-- |
-- |
CODED LOCKBOX 2963 |
|
|
-- |
-- |
Floors need to be covered |
|
|
-- |
-- |
Hairline scratches by refrigerator |
Eagle will fix this |
|
-- |
-- |
Small amount of popping floor in second maybe third bedroom |
Buddy / Osbaldo |
|
-- |
-- |
Just master bathroom door |
Osbaldo |
|
-- |
-- |
Just laundry room pocket door |
Osbaldo |
|
-- |
-- |
Brass hinges on Upper bedroom door to be swapped out with brushed nickel |
Osbaldo (get from Tom) |
|
-- |
-- |
Buddy and fill nail holes and center kitchen board in Hardwick |
|
|
-- |
-- |
Clean putty adn fill nail holes in hardwood boards in kitchen |
Eagle will fix this |
|
-- |
-- |
Remove debris from garbage disposal. |
Osbaldo |
|
-- |
-- |
Secure range outlet to the floor. |
|
|
-- |
-- |
Apply flexible sealant over cracked masonry coating where front water line goes through wall. |
Osbaldo |
|
-- |
-- |
Connect drain line to water heater drain pan. |
Osbaldo |
|
-- |
-- |
Seal gap between front light and brick with flexible caulking. |
Osbaldo |
|
-- |
-- |
Fasten front and rear spigots to walls with screws. |
Osbaldo |
|
-- |
-- |
Apply flexible caulking at the gaps between the bottoms of the front windows and the brick. |
Osbaldo |
|
-- |
-- |
Fill gaps between the sides of the kick plate and the rear door with flexible caulking. |
Osbaldo |
|
-- |
-- |
Repair right side track that is disconnected on drawer in island cabinet. |
|
|
-- |
-- |
Repair window at kitchen sink that does not lock. |
|
|
-- |
-- |
Install proper type (2-A:10-B:C) of fire extinguisher. |
|
|
-- |
-- |
Install window screens. |
Back ordered |
|
-- |
-- |
Adjust windows that do not fully seal at the top when closed. |
Osbaldo |
|
-- |
-- |
Add trim nails where trim is loose around attic access panel. |
Osbaldo |
|
-- |
-- |
Adjust rear door jamb and lock plate so that it can close properly. |
Osbaldo |
|
-- |
-- |
Remove dirt that is blocking rear downspout and install a splash block. |
Osbaldo |
|
-- |
-- |
Seal cracks and gaps in front and rear door jambs and apply final coat of paint. |
Osbaldo |
|
-- |
-- |
Hole in ceiling of laundry room (see pic) |
|
|
-- |
-- |
Clean off the back of the pantry door before painting again |
Osbaldo |
|
-- |
-- |
Upstairs closet doors to be adjusted in second and third bedroom |
Osbaldo |
|
-- |
-- |
Review Warranty Requests |
mellysaw@gmail.com |
|
-- |
-- |
Possible leak at baseboard molding in basement bonus room |
Going in Monday 2/10 to investigate |
|
-- |
-- |
Missing screen door |
|
|
-- |
-- |
Adjust pocket door |
Issac to finish Monday 2/10 |
|
-- |
-- |
Cut off sewer clean out |
|
|
-- |
-- |
Add rope to weep holes |
|
|
-- |
-- |
Tom and Kate to meet with Melissa week of Dec 2 |
4PM on Thurs, Dec 5 |
|
-- |
-- |
Reverse handrail(s) |
Issac to finish Monday 2/10 |
|
-- |
-- |
Spray mold killer |
Greg to spray this afternoon |
|
-- |
-- |
Replace small piece of drywall |
JB to finish friday |
|
-- |
-- |
replace small piece of Trim |
JB to replace Friday 9/4 |
|
-- |
-- |
Replace rear siding |
JB should have done this but need to confirm GWB |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
Trusses are set |
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Order Appliances (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
|
|
-- |
-- |
Privacy Divider / Fence (0)
|
Fri, Dec 7 |
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
Ready |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
Fri, Aug 31 |
|
-- |
-- |
Plumbing Rough In (4)
|
Starting Wed, Aug 22 |
|
-- |
-- |
Electric Rough In (4)
|
Finishing Tues, Aug 21 |
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
Hanging as of Sep 10 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
Skim Sep 24; Sanding Sep 27 |
|
-- |
-- |
Paint 1 (1)
|
Still need as of Oct 1 |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
Install starting Oct 1 |
|
-- |
-- |
Granite Installation (1)
|
|
|
-- |
-- |
Interior Trim - Install (3)
|
Install starting Oct 1 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
Started as of Oct 8 |
|
-- |
-- |
Paint 2 (3)
|
|
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
Not started as of Nov 12 - Virginia Installations |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
Mostly done as of Nov 12 |
|
-- |
-- |
HVAC Trim Out (1)
|
Ready for Ronnie |
|
-- |
-- |
Plumbing Trim Out (2)
|
|
|
-- |
-- |
Install Appliances (0)
|
Tues, Nov 27 |
|
-- |
-- |
Paint 3 (2)
|
Fri, Dec 14 |
|
-- |
-- |
Carpet (2)
|
Mon, Nov 26 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
Buddy thinks maybe, possibly, Dec 4 |
|
-- |
-- |
Pre Walk Through (0)
|
Kate - Dec 3 |
|
-- |
-- |
Cleaning (1)
|
Tues, Dec 18 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Schedule Closing (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
Tues, Dec 18 @ 2:45 PM |
|
-- |
-- |
Payment for Upgrades (0)
|
$3,567.03 |
|
-- |
-- |
Keys to Settlement Agent (0)
|
|
|
-- |
-- |
Review Settlement Statement (0)
|
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
|
|
|
-- |
-- |
Closing (1)
|
Friday, Dec 21 |
|
-- |
-- |
Remove Coded Lockbox (0)
|
|
|