Tiara Brown 540-560-5154 |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
PEARL VINYL, RED FRONT DOOR |
Green ok??? |
|
-- |
-- |
Creaking hardwood floor in Foyer off of front door. |
Buddy / Osbaldo |
|
-- |
-- |
Better cover floors |
Osbaldo |
|
-- |
-- |
Powder bathroom drywall patch on escutcheon behind toilet |
Drywaller |
|
-- |
-- |
Rattling bathroom fan in the powder bathroom |
TBD |
|
-- |
-- |
Add light to basement closet under stairs |
Graves |
|
-- |
-- |
Loose post and handrail leading to second floor |
Osbaldo |
|
-- |
-- |
Once Hardwood floors are cleaned Eric to come back with the stain marker to go over nail holes in kitchen floor |
Eagle |
|
-- |
-- |
3/4 to 1 inch between baseboard and subfloor... should be 1/2” thicker pad? |
|
|
-- |
-- |
Baseboard in up hall bath |
|
|
-- |
-- |
Crack in master bedroom floor to be nailed down/sanded/filled. |
Osbaldo + Eagle |
|
-- |
-- |
Drywall patches in master bathroom where outlets were cut in incorrectly |
Osbaldo |
|
-- |
-- |
The baseboard in master bathroom |
|
|
-- |
-- |
Big creek at the top of stairs in bedroom level |
Osbaldo |
|
-- |
-- |
Small hump to be sanded in middle of floor in second bedroom |
Osbaldo |
|
-- |
-- |
Actually all sub floor joints upstairs need to be looked at and potential he sanded to prevent humps after carpet is installed |
Osbaldo |
|
-- |
-- |
Take a top piece of nosing in lower it so Carpet will be flush with the floor |
Osbaldo |
|
-- |
-- |
Patty and caulk crown mold miters in living room |
Painter |
|
-- |
-- |
3/4" to 1" baseboard above sub floor. Should be 1/4". Lower trim? Thicker pad and double tack strip? |
Buddy / Osbaldo |
|
-- |
-- |
Install dishwasher |
|
|
-- |
-- |
Coded Lockbox 2016 |
|
|
-- |
-- |
Goal = Closing Jan 31 |
|
|
-- |
-- |
Shoe molding downstairs bath (see pic) |
|
|
-- |
-- |
Closet holes/missing shelving (see pic) |
|
|
-- |
-- |
Small crack/ ceiling MB (see pic) |
Kate to add blue tape |
|
-- |
-- |
Flickering lights in master bathroom. |
|
|
-- |
-- |
I just double closet doors in upstairs second bedroom |
|
|
-- |
-- |
I just Laundry room pocket door |
|
|
-- |
-- |
Install trim basement bathroom cabinet |
|
|
-- |
-- |
Ceiling seam in LR (see pic) |
Kate to add blue tape |
|
-- |
-- |
Drywall hole behind pedestal sink |
Osbaldo |
|
-- |
-- |
Address trim issue on landing going to basement |
Osbaldo |
|
-- |
-- |
Sand sharp edge at bottom of steps basement |
Osbaldo |
|
-- |
-- |
Very visible semen basement. Eric to address? |
|
|
-- |
-- |
I just basement slider |
Osbaldo |
|
-- |
-- |
Loose handrail going upstairs |
Osbaldo |
|
-- |
-- |
Sand miter on handrail on stairs landing |
Isaac |
|
-- |
-- |
Upstairs closet doors to be adjusted |
Osbaldo |
|
-- |
-- |
Need to sand and touchup wall in master bathroom |
Isaac |
|
-- |
-- |
Crack in master shower |
Osbaldo - maybe |
|
-- |
-- |
Very visible cement basement. Eric to address? |
|
|
-- |
-- |
Very visible seam located in the basement. Eric to address? |
Carpet - Eric |
|
-- |
-- |
Photos after cleaning |
|
|
-- |
-- |
Final Paint Touch Up Monday Morning 14th |
Isaac |
|
-- |
-- |
Light fixture falling in kitchen (see pic) |
|
|
-- |
-- |
Crack in mb tub (pic) |
Osbaldo sanded and will return one more time to fill in 1/23 |
|
-- |
-- |
|
|
|
-- |
-- |
Coded Lockbox New 7878 |
|
|
-- |
-- |
Black spot on basement carpet |
Eric going to check today 2/10 |
|
-- |
-- |
Patch drywall |
Joe put in contact with Tiara. Likely to complete week of 2/24 |
|
-- |
-- |
Carpet stain |
|
|
-- |
-- |
Get report/picture from mold inspector-find solution |
Tom to inspect prior to remediation 6/23 GWB |
|
-- |
-- |
Greg to spray mold killer |
Spraying again today 8/27 |
|
-- |
-- |
Replace trim 16 ft |
JB |
|
-- |
-- |
replace pad and wash carpet |
Eagle replacing pad Mon. 9/21 GWB |
|
-- |
-- |
Replace carpet and damaged pad |
Eric knows and eagle to schedule withTiara |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
Trusses are set |
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Wed, Aug 15 |
|
-- |
-- |
Plumbing Rough In (4) |
Finishing Aug 13 |
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Starting Aug 20 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Sanding Fri, Aug 31 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Delivered 9/21, Install 9/24 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
Finishing Sep 17 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In process as of Sep 27 |
|
-- |
-- |
Paint 2 (3) |
Week of Oct 8 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Ready as of Oct 8 |
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
|
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Final cleaning Mon, Jan 14? |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Tues, Jan 22 @ 9:15 AM |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|