Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Schedule Closing (0)
|
|
|
Mon |
Oct 7 |
Keys to Settlement Agent (0)
|
|
|
Mon |
Oct 7 |
Review Settlement Statement (0)
|
|
|
Mon |
Oct 7 |
Jerry Signs Closing Documents (0)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
Mon |
Oct 7 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
BONE VINYL, RED FRONT DOOR |
|
|
-- |
-- |
BUYER WOULD LIKE TO DO ELECTRICAL WALK THROUGH |
|
|
-- |
-- |
Convert 2 BR to 3 BR |
|
|
-- |
-- |
CODED LOCKBOX 6208 |
|
|
-- |
-- |
CODED LOCKBOX 6208 |
|
|
-- |
-- |
Has loose slab floor upstairs near the spare bedroom and bathroom entrance been addressed? |
|
|
-- |
-- |
Has the loose subfloor upstairs near guest bedroom and bathroom entrance been addressed? |
|
|
-- |
-- |
Extend paint color and kitchen to extend all the way to the corner to the right of the French doors leading to the deck |
|
|
-- |
-- |
Powder room toilet |
|
|
-- |
-- |
Carpet on stairs |
|
|
-- |
-- |
Need handrail on stairs |
|
|
-- |
-- |
Install chandelier |
|
|
-- |
-- |
Basement stairwell hand rail |
|
|
-- |
-- |
Fill nail holes in upstairs hall bathroom. |
|
|
-- |
-- |
Replace upstairs hall bathroom and master bathroom mirrors that have cut scratches |
Nov 29 |
|
-- |
-- |
Adjust up bedroom closets |
Buddy |
|
-- |
-- |
Buyer wuold like fan blades turned to the darker side. |
|
|
-- |
-- |
Final Cleaning |
|
|
-- |
-- |
paint touch up thorughout |
|
|
-- |
-- |
Replace range handle |
Waiting as of Dec 13 |
|
-- |
-- |
Caulk door frame up BR with double doors |
|
|
-- |
-- |
Install light in MAster B-room after paint touch up |
|
|
-- |
-- |
address gap between trim and carept at top of stairs |
|
|
-- |
-- |
Adjust doors to patio |
|
|
-- |
-- |
Mop basement floor |
|
|
-- |
-- |
Clean basement windows |
Nov 29 |
|
-- |
-- |
Clean off paint- trim piece base of patio doors |
|
|
-- |
-- |
Brick around steps |
Thu, Dec 13 |
|
-- |
-- |
Hole under sink - looks like a hose should be there? |
Buddy - needs grate for toe kick vent |
|
-- |
-- |
Brick needs to be re-attached to front stoop |
Dennis- supposed to happen 4/17 |
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
Missing one window |
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
|
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
|
|
-- |
-- |
Gutters (0)
|
|
|
-- |
-- |
Driveway (0)
|
|
|
-- |
-- |
Privacy Divider / Fence (0)
|
Thu, Dec 13 |
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
|
|
-- |
-- |
HVAC Rough In (4)
|
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
|
|
-- |
-- |
Electric Rough In (4)
|
|
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
Thursday, August 2 |
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
|
|
-- |
-- |
Paint 1 (1)
|
Tues, Aug 14 |
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
|
|
-- |
-- |
Cabinet Installation (2)
|
Delivered 9/7, Install 9/11 |
|
-- |
-- |
Granite Installation (1)
|
Oct 8 |
|
-- |
-- |
Interior Trim - Install (3)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
|
|
-- |
-- |
Paint 2 (3)
|
In process as of Sep 20 |
|
-- |
-- |
Cover Floors (1)
|
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
Still waiting as of Oct 8, needs peephole |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
|
|
-- |
-- |
Electric Trim Out (3)
|
Just need missing fixtures- Buyer has chandelier to be installed in Guest bedroom upstairs. |
|
-- |
-- |
HVAC Trim Out (1)
|
Setting outside unit Nov 8-ish |
|
-- |
-- |
Plumbing Trim Out (2)
|
Waiting on plumber as of Oct 18 |
|
-- |
-- |
Install Appliances (0)
|
Installing Nov 8 |
|
-- |
-- |
Paint 3 (2)
|
Week of Nov 5 |
|
-- |
-- |
Carpet (2)
|
TBD |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
Dean Martin, 804-437-4316, Wed, Nov 27 |
|
-- |
-- |
Inspection (Final Building) (2)
|
Hopefully Tuesday, Nov 13 |
|
-- |
-- |
Pre Walk Through (0)
|
|
|
-- |
-- |
Cleaning (1)
|
After 81 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
|
|
-- |
-- |
Payment for Upgrades (0)
|
$1,910 |
|
-- |
-- |
Closing (1)
|
|
|