Fri |
Sep 20 |
Ratified Contract? (0)
|
|
|
Fri |
Sep 20 |
$2500 Deposit Received (0)
|
|
|
Fri |
Sep 20 |
Association Packet Requested (0)
|
|
|
Fri |
Sep 20 |
Association Packet Received (0)
|
|
|
Fri |
Sep 20 |
Selections Meeting (0)
|
|
|
Fri |
Sep 20 |
Selections Sheet Signed (0)
|
|
|
Fri |
Sep 20 |
Amendment for Upgrades (B,S,L,T,BCP) (0)
|
|
|
Fri |
Sep 20 |
Deposit For Upgrades Received (0)
|
|
|
Fri |
Sep 20 |
Inspection (Concrete Wall) (1)
|
|
|
Mon |
Sep 23 |
Inspection (Conduit Under Slab) (1)
|
|
|
Tue |
Sep 24 |
Inspection (Drain Tile) (0)
|
|
|
Tue |
Sep 24 |
Settlement Agent Confirmed (0)
|
|
|
Tue |
Sep 24 |
Verify Window & Roof Structure (0)
|
|
|
Tue |
Sep 24 |
Order Appliances (0)
|
|
|
Tue |
Sep 24 |
Patio (0)
|
|
|
Tue |
Sep 24 |
Rough In Microwave Vent (0)
|
|
|
Tue |
Sep 24 |
Inspection (Rough In Plumbing) (1)
|
|
|
Wed |
Sep 25 |
Inspection (Rough In Electric) (1)
|
|
|
Thu |
Sep 26 |
Inspection (Deck Piers) (0)
|
|
|
Thu |
Sep 26 |
Inspection (Framing) (1)
|
|
|
Fri |
Sep 27 |
Exterior Stone (0)
|
|
|
Fri |
Sep 27 |
Set Electric Meter (0)
|
|
|
Fri |
Sep 27 |
Inspection (Main Water Line) (0)
|
|
|
Fri |
Sep 27 |
Loan Approval (0)
|
|
|
Fri |
Sep 27 |
Deed Preparation (0)
|
|
|
Fri |
Sep 27 |
Mailbox (0)
|
|
|
Fri |
Sep 27 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 27 |
Interior Trim - Paint (1)
|
|
|
Mon |
Sep 30 |
Ceiling Fans (0)
|
|
|
Mon |
Sep 30 |
Blower Door Test (1)
|
|
|
Tue |
Oct 1 |
Inspection (Final HVAC) (1)
|
|
|
Wed |
Oct 2 |
Inspection (Final Plumbing) (1)
|
|
|
Thu |
Oct 3 |
Inspection (Final Electric) (1)
|
|
|
Fri |
Oct 4 |
Stain Hardwood Stairs (1)
|
|
|
Mon |
Oct 7 |
Schedule Closing (0)
|
|
|
Mon |
Oct 7 |
Keys to Settlement Agent (0)
|
|
|
Mon |
Oct 7 |
Review Settlement Statement (0)
|
|
|
Mon |
Oct 7 |
Jerry Signs Closing Documents (0)
|
|
|
Mon |
Oct 7 |
Request Trash Tote From POA Manager (0)
|
|
|
Mon |
Oct 7 |
Remove Coded Lockbox (0)
|
|
|
|
-- |
-- |
CHARLESTON BRICK, PEARL VINYL, GOLD FRONT DOOR |
|
|
-- |
-- |
Buyer Walk Through - Fri, Jul 13 @ 9 AM |
|
|
-- |
-- |
PAINT Ghost ship 4007 Dash three a Valspar four main house color |
|
|
-- |
-- |
Paint- Ghost ship 4007-3A Valspar main house color |
|
|
-- |
-- |
Paint- Linwood Sands HGSW2506 Sherwin Williams for all the bathrooms |
|
|
-- |
-- |
Paint- Powder Bath- Ghost Ship |
|
|
-- |
-- |
Last few light fixtures |
|
|
-- |
-- |
Set water meter and connect |
|
|
-- |
-- |
Stoop footer on Monday |
Nov 5 |
|
-- |
-- |
Block and brick for stoop on Tuesday, Nov 6 |
|
|
-- |
-- |
Refrigerator |
Monday, Nov 12 |
|
-- |
-- |
Few more shelves and locks |
|
|
-- |
-- |
Remove mortar from front door |
Painter |
|
-- |
-- |
Front porch - pour and railing |
Need railing |
|
-- |
-- |
Gold Front Door |
|
|
-- |
-- |
Final segment of sidewalk |
Partners |
|
-- |
-- |
Street sign |
Not yet as of Nov 29 |
|
-- |
-- |
Railing for porch |
Monday |
|
-- |
-- |
CODED LOCKBOX 1331 |
|
|
-- |
-- |
Peep hole and linen closet shelves |
Monday |
|
-- |
-- |
Front landscaping after porches |
Week of Nov 26 |
|
-- |
-- |
Front door handle installed upside down |
|
|
-- |
-- |
Final paint touch up |
|
|
-- |
-- |
Final cleaning |
|
|
-- |
-- |
Range drawer needs to be fixed |
Mats appliances 11/24 |
|
-- |
-- |
Need screen in upstairs small bedroom window |
|
|
-- |
-- |
Small Nick in trim on the window in small up bedroom |
Buddy |
|
-- |
-- |
Need three window screens and upstairs bedrooms |
Ordered |
|
-- |
-- |
Paint access panel to attic. |
|
|
-- |
-- |
Remove stickers up master window |
Buddy |
|
-- |
-- |
Touch ups up hall bath |
Buddy |
|
-- |
-- |
|
|
|
-- |
-- |
Need door to back bonus room |
|
|
-- |
-- |
Swap out scratched mirrors- both up baths and basement bath |
Dec 4 |
|
-- |
-- |
Two small holes in up bath above mirror to be filled |
Hall bath |
|
-- |
-- |
Replace mirror in basement bathroom |
|
|
-- |
-- |
|
|
|
-- |
-- |
Scratches in up hall bath |
Dec 4 |
|
-- |
-- |
Door under stairs does not latch |
Buddy |
|
-- |
-- |
Powder room bath needs toilet paper holder |
|
|
-- |
-- |
Mats appliances is coming to fix the range handle and dishwasher and 11/24 |
Nov 29 |
|
-- |
-- |
Need mailbox keys |
Buddy |
|
-- |
-- |
Master bathroom towel rack is unlevel |
|
|
-- |
-- |
Bedroom with a double door closet couldn’t open vent severely damaged |
|
|
-- |
-- |
Areas where wood floor is damaged |
|
|
-- |
-- |
Master bedroom, rise in score between bathroom and ceiling fan area near double windows. |
|
|
-- |
-- |
Funds Escrowed For Fence = $5850 |
(with West View Title) |
|
-- |
-- |
Remove coded lockbox |
|
|
-- |
-- |
Building Permit (30)
|
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
|
|
|
-- |
-- |
Order Windows & Doors (0)
|
|
|
-- |
-- |
Stake Out Home (1)
|
|
|
-- |
-- |
Excavate (2)
|
|
|
-- |
-- |
Inspection (Footers) (1)
|
|
|
-- |
-- |
Pour Footers (1)
|
|
|
-- |
-- |
Set Forms (2)
|
|
|
-- |
-- |
Pour Foundation Walls (1)
|
|
|
-- |
-- |
Plumb Slab (2)
|
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
|
|
|
-- |
-- |
Prepare Slab (1)
|
|
|
-- |
-- |
Inspection (Slab) (1)
|
|
|
-- |
-- |
Pour Slab (1)
|
|
|
-- |
-- |
Framing I (9)
|
|
|
-- |
-- |
Order Steps (0)
|
|
|
-- |
-- |
Order Tubs / Showers (0)
|
|
|
-- |
-- |
Framing II (8)
|
|
|
-- |
-- |
Framing III (8)
|
|
|
-- |
-- |
Install Stairs (0)
|
|
|
-- |
-- |
Windows & Doors (0)
|
|
|
-- |
-- |
House Number and Status in Window (0)
|
|
|
-- |
-- |
Roofing (0)
|
Starting June 18 81,80,79 and black papered today before rain. |
|
-- |
-- |
Order Cabinets (0)
|
|
|
-- |
-- |
Deck (0)
|
In process as of Sep 20 |
|
-- |
-- |
Gutters (0)
|
Ordered as of Sep 20 |
|
-- |
-- |
Driveway (0)
|
|
|
-- |
-- |
Privacy Divider / Fence (0)
|
Almost complete as of Dec 13 |
|
-- |
-- |
Sod / Seed / Landscaping (0)
|
Thursday, Nov 8 |
|
-- |
-- |
HVAC Rough In (4)
|
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
|
|
|
-- |
-- |
Plumbing Rough In (4)
|
|
|
-- |
-- |
Electric Rough In (4)
|
|
|
-- |
-- |
Exterior Vinyl (0)
|
|
|
-- |
-- |
Insulation (2)
|
|
|
-- |
-- |
Inspection (Insulation) (1)
|
|
|
-- |
-- |
Inspection (Electric Service) (0)
|
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
|
|
|
-- |
-- |
Order Interior Doors & Trim (0)
|
|
|
-- |
-- |
Drywall (Hang) (4)
|
Finishing August 6 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
|
Sanding Aug 13 |
|
-- |
-- |
Paint 1 (1)
|
|
|
-- |
-- |
Garage Door (0)
|
|
|
-- |
-- |
House Numbers (0)
|
Need keys for mailboxes |
|
-- |
-- |
Cabinet Installation (2)
|
Delivered 9/7, Install 9/10 |
|
-- |
-- |
Granite Installation (1)
|
Mon, Oct 8 |
|
-- |
-- |
Interior Trim - Install (3)
|
|
|
-- |
-- |
Luxury Vinyl Plank (3)
|
|
|
-- |
-- |
Luxury Vinyl Tile (0)
|
|
|
-- |
-- |
Paint 2 (3)
|
|
|
-- |
-- |
Cover Floors (1)
|
Monday, Oct 29 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
|
|
|
-- |
-- |
Shoe Moulding (0)
|
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
|
Still waiting as of Oct 8, needs peephole |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
|
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
|
|
|
-- |
-- |
Set Water Meter (0)
|
Need more dirt at water crock |
|
-- |
-- |
Electric Trim Out (3)
|
Waiting on a few fixtures |
|
-- |
-- |
HVAC Trim Out (1)
|
Oct 18 / 19 |
|
-- |
-- |
Plumbing Trim Out (2)
|
|
|
-- |
-- |
Install Appliances (0)
|
Waiting on installation date from Jeff |
|
-- |
-- |
Paint 3 (2)
|
|
|
-- |
-- |
Carpet (2)
|
Oct 29 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
|
|
|
-- |
-- |
Inspection (Final Building) (2)
|
Hopefully Tuesday, Nov 13 |
|
-- |
-- |
Pre Walk Through (0)
|
Tuesday, Nov 12 or Wednesday, Nov 13 |
|
-- |
-- |
Cleaning (1)
|
Monday, Nov 12 |
|
-- |
-- |
Certificate of Occupancy (1)
|
|
|
-- |
-- |
C.O. to Lender (0)
|
|
|
-- |
-- |
Buyer Walk Through (1)
|
|
|
-- |
-- |
Payment for Upgrades (0)
|
|
|
-- |
-- |
Closing (1)
|
Thursday, Nov 29 at 2PM |
|