Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
|
-- |
-- |
Carters Grove Brick- country beige vinyl |
|
|
-- |
-- |
Red front door |
|
|
-- |
-- |
Parking space? |
|
|
-- |
-- |
Front door handle, interior, installed upside down. |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Final cleaning |
|
|
-- |
-- |
PRIORITIES: Driveway, Curb, Water Meter |
ASAP |
|
-- |
-- |
waiting on 1 window |
Is window laying in basement replacement? |
|
-- |
-- |
Need tub liners in hall bath and MB |
|
|
-- |
-- |
Reinspect of framing and plumbing |
|
|
-- |
-- |
Reinspect of framing, plumbing, electrical |
Tues, Jan 22 |
|
-- |
-- |
Truss repair |
|
|
-- |
-- |
Adjust width of master bathroom linen closet |
|
|
-- |
-- |
Replace front door and frame |
Ready to be picked up |
|
-- |
-- |
Missing insulation at side window? (Pic) |
|
|
-- |
-- |
Bathroom vanity door (pic) |
Tom will check it out and check with Kyle |
|
-- |
-- |
Replace all hinges to oil rub bronze |
Part of Basement still needs done |
|
-- |
-- |
Unfinished basement drywall issues |
|
|
-- |
-- |
Cultured Marble Install |
27th or 28th |
|
-- |
-- |
Trim at front door and tile |
Mitch? Osbaldo? |
|
-- |
-- |
They will be doing a home inspection; |
Monday 4/22 |
|
-- |
-- |
Install missing cultured marble backsplash |
Still missing 4/10 |
|
-- |
-- |
Coded Lockbox 1028 |
|
|
-- |
-- |
Garage door has wide gaps on each side (pic) |
Osbaldo |
|
-- |
-- |
Pave driveway |
|
|
-- |
-- |
Home Inpsection on Apr 22 |
|
|
-- |
-- |
Home Inspection on Apr 22 |
|
|
-- |
-- |
Needs house number |
|
|
-- |
-- |
Hall light fixtures? Not correct? |
And MB? |
|
-- |
-- |
Add missing light fixtures |
June 17 ? |
|
-- |
-- |
Inspection list left on island |
|
|
-- |
-- |
Paint attic access panel |
|
|
-- |
-- |
Drywall imperfections throughout |
|
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
Caulk shoe mold and foyer where at gaps and shoe mold at bottom of steps |
|
|
-- |
-- |
Missing light fixtures three oil rubbed bronze single sconces and master ceiling fan |
|
|
-- |
-- |
Missing shoe mold hall bathroom |
|
|
-- |
-- |
Up bath- toe kick chipped needs touch up |
|
|
-- |
-- |
Paint in side of vanity up hall bath |
|
|
-- |
-- |
Master shower drain needed in ORB |
In warehouse. Waiting for Tom to pick up and to install. |
|
-- |
-- |
Paint shoe mold master bathroom |
|
|
-- |
-- |
Install master shower rod |
|
|
-- |
-- |
Need ORB hinge bottom of handrail |
|
|
-- |
-- |
Shoe mold needs caulked painted and at island and in kitchen |
|
|
-- |
-- |
Add top hinge/door stop to powder bath door |
|
|
-- |
-- |
Clean drywall dust wall registers |
|
|
-- |
-- |
Add door stop patio doors |
|
|
-- |
-- |
Replace kitchen cabinet door |
|
|
-- |
-- |
Missing hinge screws- basement door closet under stairs |
|
|
-- |
-- |
Adjust inside light switch front door |
|
|
-- |
-- |
Change hinges to ORB and adjust double doors going into HVAC |
|
|
-- |
-- |
Power wash patio/siding and privacy panel |
|
|
-- |
-- |
Upgrades = $3017.50 |
|
|
-- |
-- |
Replace outdoor spigot |
Hall Mechanical |
|
-- |
-- |
Screens in master bedroom |
Tom |
|
-- |
-- |
Water staining on ceiling of master bedroom |
3/9/2021 - Kate // Tom will follow up with Joel (5/27) |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
Sep 21 or 24 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
Starting Oct 9 |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
Delivered Monday, Dec 4 |
|
-- |
-- |
Windows & Doors (0) |
Delivered Monday, Dec 4 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
Almost done as of Apr 4 |
|
-- |
-- |
Driveway (0) |
Extra parking space/patio done 3/20 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Complete soon as of Jan 7 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Mon, Jan 14 - morning |
|
-- |
-- |
Plumbing Rough In (4) |
Everything complete except tub valves as of Jan 3 |
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
Siding starting Mar 14 |
|
-- |
-- |
Insulation (2) |
Tue, Jan 15 ? |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
Partners to dig ditch for conduit to transformer |
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Waiting on brick to be complete |
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Done by Wed, Feb 13 |
|
-- |
-- |
Paint 1 (1) |
Sat, Feb 16 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Deliver Feb 22/delivered 2/27 |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
Finished except at tile as of Mar 18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Starting Mar 11 |
|
-- |
-- |
Paint 2 (3) |
Mostly done Mar 25 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Mon, Mar 11 |
|
-- |
-- |
Shoe Moulding (0) |
In process as of Apr 8 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Apr 9 - 10 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
By Wed Apr 17 |
|
-- |
-- |
Electric Trim Out (3) |
|
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Mostly done as of Apr 4 |
|
-- |
-- |
Install Appliances (0) * |
Schedule for Apr 12 |
|
-- |
-- |
Paint 3 (2) * |
Ready for Isaac, Tom will tell Isaac Apr 15 |
|
-- |
-- |
Carpet (2) |
Kate will schedule with Eric |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Mon Apr 22 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Friday 19th - Sunday 21st |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Tuesday 4/23 afternoon |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
-- |
-- |
Closing (1) |
Friday 4/26 |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|