add seed adn straw to yard |
Tom is aware as of 7/29 |
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Savannah Brick |
|
|
-- |
-- |
Bone Vinyl |
Started 2/6 |
|
-- |
-- |
Red front door |
|
|
-- |
-- |
Green Front Door |
|
|
-- |
-- |
Parking space? |
|
|
-- |
-- |
Pretty significant bump in floor in master bedroom/bathroom (see pic) |
Tom and Osbaldo will address |
|
-- |
-- |
Need liners in every shower/bathtub |
Need one in basement |
|
-- |
-- |
Upstairs window missing |
|
|
-- |
-- |
Replace window in front (marked w large blue X) |
|
|
-- |
-- |
Patch slabs near garages (all units) |
Osbaldo |
|
-- |
-- |
Awaiting replacement cabinet parts |
|
|
-- |
-- |
Cultured Marble Install |
Just need one piece of side splash/on site just needs installed |
|
-- |
-- |
Lots of cabinets in garage? For other units? |
|
|
-- |
-- |
Fill space above window on side of townhouse |
PVC board, Greg |
|
-- |
-- |
Crack on ceiling near kitchen |
|
|
-- |
-- |
Coded Lockbox 6208 |
|
|
-- |
-- |
Pave |
|
|
-- |
-- |
Pave driveway |
Partially paved 4/17 |
|
-- |
-- |
Still needs electric trim out (none in basement) |
Working on it 4/20 |
|
-- |
-- |
Missing kitchen hardware |
|
|
-- |
-- |
Stair railing needed |
|
|
-- |
-- |
Repair blemish on side of cabinet above refrigerator |
Kyle |
|
-- |
-- |
Home Inspection Monday, April 29 at 4PM |
Buyer doing pre walk through on Apr 27 |
|
-- |
-- |
Pendant lights need to be extended |
|
|
-- |
-- |
Hardware to be installed in kitchen |
Kyle -4/31 |
|
-- |
-- |
Floor vent in laundry room doesn’t quite fit |
Osbaldo |
|
-- |
-- |
Adjust closet doors in upstairs bedrooms |
Osbaldo |
|
-- |
-- |
Missing hardware upstairs hall bathroom |
Kyle 4/31 |
|
-- |
-- |
Stairwell sconce lights installed upside down |
Osbaldo |
|
-- |
-- |
Remove all cardboard’s from hardwood floor cleaning today |
Osbaldo |
|
-- |
-- |
Drywall patch basement shower head escutcheon |
Osbaldo |
|
-- |
-- |
Missing hardware basement bathroom |
Kyle |
|
-- |
-- |
Missing side splash basement bathroom vanity |
Remove from under sink |
|
-- |
-- |
Clean floors |
|
|
-- |
-- |
Downspout & paper removal |
|
|
-- |
-- |
Closing next week 4/6 |
|
|
-- |
-- |
Mark corners of property |
|
|
-- |
-- |
Basement bonus room ceiling dent |
|
|
-- |
-- |
Drain spout front side |
Drain spout is there but needs to be dug out a bit to fit |
|
-- |
-- |
Need splash blocks |
Adjust location and mulch |
|
-- |
-- |
Touch up kitchen shoe mold |
|
|
-- |
-- |
Tighten threshold at top of stairs |
|
|
-- |
-- |
Caulk tile in foyer by stairs |
|
|
-- |
-- |
Cut wire from dining light fixture |
|
|
-- |
-- |
caulking exterior windows |
|
|
-- |
-- |
corner cabinet adjustement |
|
|
-- |
-- |
secure skin on fridge cabient |
|
|
-- |
-- |
retape and skim ceiling in binus room |
|
|
-- |
-- |
exposed nail master carpet |
|
|
-- |
-- |
floor pops in second and third bedroom floor |
|
|
-- |
-- |
address trim on handrail to BR level |
|
|
-- |
-- |
clean garage floor |
|
|
-- |
-- |
wash outside garage door |
|
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
tighten master shower handle |
|
|
-- |
-- |
secure skin on fridge cabinet |
|
|
-- |
-- |
Paint ceiling in bonus room |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
Mon, Oct 8 |
|
-- |
-- |
Pour Slab (1) * |
Tue, Oct 9 |
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Patio done/front patio done |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Scheduled for Tues, Jan 22 |
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
Buyer requests to do an electrical walk through |
|
-- |
-- |
Exterior Vinyl (0) * |
Working on it 3/20-90% complete 3/23 |
|
-- |
-- |
Insulation (2) |
90% completed 1/23 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Tues, Jan 29 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Finishing by Wed, Feb 13 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Complete by Mar 7 |
|
-- |
-- |
Granite Installation (1) * |
Mar 27 |
|
-- |
-- |
Interior Trim - Install (3) |
Mitch is working on trim as of Feb 18/in progress 2/23 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Working on Mar 25 |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
Mitch working 4/10 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
Wed, Apr 17 |
|
-- |
-- |
Electric Trim Out (3) |
Started 3/23 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Started 4/6 |
|
-- |
-- |
Install Appliances (0) * |
Ready by Apr 12 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
In process as of Apr 8 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Mon, Apr 22 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
In process |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Wed, May 15 at 1:00 PM |
|
-- |
-- |
Payment for Upgrades (0) |
$2450? |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
Fri, May 17 |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|