| TO DO |
|
|
Cracked window |
Tom has the window |
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
|
Tue
|
Feb 3
|
Inspection (Concrete Wall) (1) |
|
|
|
Wed
|
Feb 4
|
Inspection (Conduit Under Slab) (1) |
|
|
|
|
|
Inspection (Drain Tile) (0) |
|
|
|
|
|
Verify Window & Roof Structure (0) |
|
|
|
|
|
Patio (0) |
|
|
|
|
|
Rough In Microwave Vent (0) |
|
|
|
Thu
|
Feb 5
|
Inspection (Rough In Plumbing) (1) |
|
|
|
Fri
|
Feb 6
|
Inspection (Rough In Electric) (1) |
|
|
|
Mon
|
Feb 9
|
Inspection (Framing) (1) * |
|
|
|
|
|
Inspection (Deck Piers) (0) |
|
|
|
|
|
Exterior Stone (0) |
|
|
|
|
|
Set Electric Meter (0) * |
|
|
|
|
|
Inspection (Main Water Line) (0) |
|
|
|
Tue
|
Feb 10
|
Interior Trim - Paint (1) |
|
|
|
|
|
Ceiling Fans (0) |
|
|
|
Wed
|
Feb 11
|
Blower Door Test (1) |
|
|
|
|
|
Inspection (Final HVAC) (0) |
|
|
|
|
|
Inspection (Final Plumbing) (0) |
|
|
|
|
|
Inspection (Final Electric) (0) |
|
|
|
Thu
|
Feb 12
|
Stain Hardwood Stairs (1) * |
|
|
|
| TO DO - COMPLETED OR DELETED |
|
|
Kate - Buyer Needs To Make Selections |
Hooray! |
|
|
|
Missing kitchen wall cabinet |
|
|
|
|
Siding ships May 5 |
|
|
|
|
Stair railing? |
|
|
|
|
Cover countertops? |
|
|
|
|
Trim installed at new window in bedroom |
|
|
|
|
Large(ish) hole in hall bathtub |
Trim |
|
|
|
Side splash on kitchen counter-for 103? |
|
|
|
|
Please cover Carpet- KK -5/22 |
|
|
|
|
Trim piece needed on stairs 5/26 |
|
|
|
|
Snap lights in bedroom? |
Replace with flush mount light |
|
|
|
Attic cover 5/26 |
Tom will tell Tim |
|
|
|
Busted k cabinet |
Probably covered by microwave |
|
|
|
Drywall patch kitchen |
Jill to talk to Tim |
|
|
|
Snap light in bedroom 3 |
|
|
|
|
Water pipes in basement? |
|
|
|
|
Vanity top in here |
In garage - Tom/Jill will remove |
|
|
|
Lightbulbs needed |
Jill |
|
|
|
|
|
|
|
|
Caulk MB tub |
Painters |
|
|
|
Quite a bit of paint touch up |
Painters |
|
|
|
MB closet shelving tweaks and half bath mirror needed 6/6 |
|
|
|
|
Silicone sink countertops |
Painters |
|
|
|
Broken glass in garage door |
Ordered, picking up 6/15 |
|
|
|
Garage access over weekend? |
Buyer is asking - thoughts? |
|
|
|
Splash blocks |
Tom will add these today 6/17 |
|
|
|
Living Room Fan-Kate investigating |
|
|
|
|
Coded lockbox 1010 |
|
|
|
| UPGRADES - COMPLETED |
| |
|
Level Three Quartz - Calacutta Classique ($1575 included in amendment)
|
|
| |
|
Upgraded Cabinetry Kitchen and Baths ($1000 included in amendment)
|
|
| |
|
French Model Fridge ($850 included in amendment)
|
|
| |
|
Upgraded Carpet and Pad on Stairs and Upstairs ($1100 included in amendment)
|
|
| |
|
Upgraded Touch 20 kitchen faucet in BN ($250 included in amendment)
|
|
| |
|
Additional ceiling fan in bedroom that backs up to stairwell ($150 included in amendment)
|
|
| |
|
Expanded Driveway ($1200 included in amendment)
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
| -- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
| -- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
| -- |
-- |
Selections Meeting (0) 11.21.2021 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 11.21.2021 |
|
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.21.2021 |
|
|
| -- |
-- |
Deposit For Upgrades Received (0) 11.21.2021 |
|
|
| -- |
-- |
Building Permit (30) * |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) |
|
|
| -- |
-- |
Order Windows & Doors (0) |
|
|
| -- |
-- |
Stake Out Home (1) |
|
|
| -- |
-- |
Excavate (2) |
|
|
| -- |
-- |
Inspection (Footers) (1) |
|
|
| -- |
-- |
Pour Footers (1) * |
|
|
| -- |
-- |
Set Forms (2) |
|
|
| -- |
-- |
Pour Foundation Walls (1) |
|
|
| -- |
-- |
Plumb Slab (2) |
in process 1/6 |
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
| -- |
-- |
Prepare Slab (1) |
|
|
| -- |
-- |
Inspection (Slab) (1) |
|
|
| -- |
-- |
Pour Slab (1) * |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 11.21.2021 |
|
|
| -- |
-- |
Framing I (9) |
in process 1/20 |
|
| -- |
-- |
Order Steps (0) |
|
|
| -- |
-- |
Order Tubs / Showers (0) |
|
|
| -- |
-- |
Framing II (8) |
|
|
| -- |
-- |
Framing III (8) * |
|
|
| -- |
-- |
Install Stairs (0) * |
|
|
| -- |
-- |
Windows & Doors (0) * |
|
|
| -- |
-- |
House Number and Status in Window (0) |
|
|
| -- |
-- |
Roofing (0) * |
in process 2/10 |
|
| -- |
-- |
Order Cabinets (0) |
|
|
| -- |
-- |
Order Appliances (0) |
SS with French Fridge |
|
| -- |
-- |
Deck (0) |
|
|
| -- |
-- |
Gutters (0) |
|
|
| -- |
-- |
Driveway (0) * |
|
|
| -- |
-- |
Privacy Divider / Fence (0) * |
Week of July 5? |
|
| -- |
-- |
Sod / Seed / Landscaping (0) |
|
|
| -- |
-- |
HVAC Rough In (4) |
In process 2/17 |
|
| -- |
-- |
Plumbing Rough In (4) |
In process 3/7 |
|
| -- |
-- |
Electric Rough In (4) |
|
|
| -- |
-- |
Inspection (Rough In HVAC) (1) |
3/8 |
|
| -- |
-- |
Exterior Vinyl (0) * |
In process 5/15 |
|
| -- |
-- |
Insulation (2) * |
|
|
| -- |
-- |
Inspection (Insulation) (1) |
|
|
| -- |
-- |
Inspection (Electric Service) (0) |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) |
BN Hinges |
|
| -- |
-- |
Drywall (Hang) (4) * |
In process 3/17 |
|
| -- |
-- |
Loan Approval (0) 11.21.2021 |
|
|
| -- |
-- |
Deed Preparation (0) 11.21.2021 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Should be done 3/27-still appears to need final sanding 3/28 |
|
| -- |
-- |
Paint 1 (1) |
|
|
| -- |
-- |
Garage Door (0) |
|
|
| -- |
-- |
House Numbers (0) |
Being built |
|
| -- |
-- |
Mailbox (0) 11.21.2021 |
|
|
| -- |
-- |
Cabinet Installation (2) * |
Installing 4/7 |
|
| -- |
-- |
Granite Installation (1) * |
Scheduled for 4/29 or 4/30 |
|
| -- |
-- |
Interior Trim - Install (3) * |
Almost complete 4/11 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
| -- |
-- |
Luxury Vinyl Plank (3) * |
On site 4/17 |
|
| -- |
-- |
Luxury Vinyl Tile (0) |
|
|
| -- |
-- |
Paint 2 (3) |
|
|
| -- |
-- |
Cover Floors (0) |
Jill will take care of it |
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Plumbing PO sent- Tom call for delivery- Lighting Ordered |
|
| -- |
-- |
Shoe Moulding (0) |
|
|
| -- |
-- |
Shelving, Door Knobs, Fire Extinguisher (1) * |
Ron waiting on a few final items to come in. Will install ASAP |
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) |
|
|
| -- |
-- |
Set Water Meter (1) * |
|
|
| -- |
-- |
Electric Trim Out (3) * |
In process 5/31 |
|
| -- |
-- |
HVAC Trim Out (1) * |
in process 5/19 |
|
| -- |
-- |
Plumbing Trim Out (2) * |
Starting ASAP Standard BN Plumbing; Touch 20 Kitchen Faucet |
|
| -- |
-- |
Install Appliances (0) * |
Need stove 6/6 |
|
| -- |
-- |
Paint 3 (2) * |
|
|
| -- |
-- |
Carpet (2) |
|
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) |
Thurs, Jun 17 - Pattie Crawford |
|
| -- |
-- |
Inspection (Final Building) (4) * |
Thurs, Jun 10 |
|
| -- |
-- |
Pre Walk Through (0) |
Jill and Courtney |
|
| -- |
-- |
Cleaning (1) |
In process 6/6 |
|
| -- |
-- |
Certificate of Occupancy (1) * |
|
|
| -- |
-- |
C.O. to Lender (0) |
|
|
| -- |
-- |
Schedule Closing (0) |
|
|
| -- |
-- |
Buyer Walk Through (1) * |
|
|
| -- |
-- |
Payment for Upgrades (0) |
|
|
| -- |
-- |
Keys to Settlement Agent (0) |
|
|
| -- |
-- |
Review Settlement Statement (0) |
|
|
| -- |
-- |
Jerry Signs Closing Documents (0) |
|
|
| -- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
| -- |
-- |
Closing (1) |
Monday, 6/21@ 9AM |
|
| -- |
-- |
Remove Coded Lockbox (0) |
|
|