view photo archive
 
TO DO
Cracked window Tom has the window
UPGRADES
---
CRITICAL PATH
Wed    Jul 1      Inspection (Concrete Wall) (1)      
Thu    Jul 2      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
    Verify Window & Roof Structure (0)      
    Patio (0)      
    Rough In Microwave Vent (0)      
Fri    Jul 3      Inspection (Rough In Plumbing) (1)      
Mon    Jul 6      Inspection (Rough In Electric) (1)      
Tue    Jul 7      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Exterior Stone (0)      
    Set Electric Meter (0) *       
    Inspection (Main Water Line) (0)      
Wed    Jul 8      Interior Trim - Paint (1)      
    Ceiling Fans (0)      
Thu    Jul 9      Blower Door Test (1)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
Fri    Jul 10      Stain Hardwood Stairs (1) *       
TO DO - COMPLETED OR DELETED
Kate - Buyer Needs To Make Selections Hooray!
Missing kitchen wall cabinet
Siding ships May 5
Stair railing?
Cover countertops?
Trim installed at new window in bedroom
Large(ish) hole in hall bathtub Trim
Side splash on kitchen counter-for 103?
Please cover Carpet- KK -5/22
Trim piece needed on stairs 5/26
Snap lights in bedroom? Replace with flush mount light
Attic cover 5/26 Tom will tell Tim
Busted k cabinet Probably covered by microwave
Drywall patch kitchen Jill to talk to Tim
Snap light in bedroom 3
Water pipes in basement?
Vanity top in here In garage - Tom/Jill will remove
Lightbulbs needed Jill
Caulk MB tub Painters
Quite a bit of paint touch up Painters
MB closet shelving tweaks and half bath mirror needed 6/6
Silicone sink countertops Painters
Broken glass in garage door Ordered, picking up 6/15
Garage access over weekend? Buyer is asking - thoughts?
Splash blocks Tom will add these today 6/17
Living Room Fan-Kate investigating
Coded lockbox 1010
UPGRADES - COMPLETED
    Level Three Quartz - Calacutta Classique ($1575 included in amendment)  
    Upgraded Cabinetry Kitchen and Baths ($1000 included in amendment)  
    French Model Fridge ($850 included in amendment)  
    Upgraded Carpet and Pad on Stairs and Upstairs ($1100 included in amendment)  
    Upgraded Touch 20 kitchen faucet in BN ($250 included in amendment)  
    Additional ceiling fan in bedroom that backs up to stairwell ($150 included in amendment)  
    Expanded Driveway ($1200 included in amendment)  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  11.21.2021    
-- -- Selections Sheet Signed (0)  11.21.2021    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  11.21.2021    
-- -- Deposit For Upgrades Received (0)  11.21.2021    
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       in process 1/6
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Settlement Agent Confirmed (0)  11.21.2021    
-- -- Framing I (9)       in process 1/20
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *        in process 2/10
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)       SS with French Fridge
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *        Week of July 5?
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       In process 2/17
-- -- Plumbing Rough In (4)       In process 3/7
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       3/8
-- -- Exterior Vinyl (0) *        In process 5/15
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       BN Hinges
-- -- Drywall (Hang) (4) *        In process 3/17
-- -- Loan Approval (0)  11.21.2021    
-- -- Deed Preparation (0)  11.21.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Should be done 3/27-still appears to need final sanding 3/28
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)       Being built
-- -- Mailbox (0)  11.21.2021    
-- -- Cabinet Installation (2) *        Installing 4/7
-- -- Granite Installation (1) *        Scheduled for 4/29 or 4/30
-- -- Interior Trim - Install (3) *        Almost complete 4/11
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        On site 4/17
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (0)       Jill will take care of it
-- -- Deliver Plumbing / Lighting Fixtures (0)       Plumbing PO sent- Tom call for delivery- Lighting Ordered
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *        Ron waiting on a few final items to come in. Will install ASAP
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (1) *       
-- -- Electric Trim Out (3) *        In process 5/31
-- -- HVAC Trim Out (1) *        in process 5/19
-- -- Plumbing Trim Out (2) *        Starting ASAP Standard BN Plumbing; Touch 20 Kitchen Faucet
-- -- Install Appliances (0) *        Need stove 6/6
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Thurs, Jun 17 - Pattie Crawford
-- -- Inspection (Final Building) (4) *        Thurs, Jun 10
-- -- Pre Walk Through (0)       Jill and Courtney
-- -- Cleaning (1)       In process 6/6
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *       
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Request Trash Tote From POA Manager (0)      
-- -- Closing (1)       Monday, 6/21@ 9AM
-- -- Remove Coded Lockbox (0)