CONGERS - 10  ::  2832 Belgian Drive
[ BUILD: 20200001991 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Cracked window Tom has the window
Tue    Nov 4      Inspection (Concrete Wall) (1)      
Wed    Nov 5      Inspection (Conduit Under Slab) (1)      
Thu    Nov 6      Inspection (Drain Tile) (0)      
Thu    Nov 6      Verify Window & Roof Structure (0)      
Thu    Nov 6      Patio (0)      
Thu    Nov 6      Rough In Microwave Vent (0)      
Thu    Nov 6      Inspection (Rough In Plumbing) (1)      
Fri    Nov 7      Inspection (Rough In Electric) (1)      
Mon    Nov 10      Inspection (Framing) (1) *       
Tue    Nov 11      Inspection (Deck Piers) (0)      
Tue    Nov 11      Exterior Stone (0)      
Tue    Nov 11      Set Electric Meter (0) *       
Tue    Nov 11      Inspection (Main Water Line) (0)      
Tue    Nov 11      Interior Trim - Paint (1)      
Wed    Nov 12      Ceiling Fans (0)      
Wed    Nov 12      Blower Door Test (1)      
Thu    Nov 13      Inspection (Final HVAC) (1)      
Fri    Nov 14      Inspection (Final Plumbing) (1)      
Mon    Nov 17      Inspection (Final Electric) (1)      
Tue    Nov 18      Stain Hardwood Stairs (1) *       
--   --   Kate - Buyer Needs To Make Selections Hooray!
--   --   Missing kitchen wall cabinet
--   --   Siding ships May 5
--   --   Stair railing?
--   --   Cover countertops?
--   --   Trim installed at new window in bedroom
--   --   Large(ish) hole in hall bathtub Trim
--   --   Side splash on kitchen counter-for 103?
--   --   Please cover Carpet- KK -5/22
--   --   Trim piece needed on stairs 5/26
--   --   Snap lights in bedroom? Replace with flush mount light
--   --   Attic cover 5/26 Tom will tell Tim
--   --   Busted k cabinet Probably covered by microwave
--   --   Drywall patch kitchen Jill to talk to Tim
--   --   Snap light in bedroom 3
--   --   Water pipes in basement?
--   --   Vanity top in here In garage - Tom/Jill will remove
--   --   Lightbulbs needed Jill
--   --  
--   --   Caulk MB tub Painters
--   --   Quite a bit of paint touch up Painters
--   --   MB closet shelving tweaks and half bath mirror needed 6/6
--   --   Silicone sink countertops Painters
--   --   Broken glass in garage door Ordered, picking up 6/15
--   --   Garage access over weekend? Buyer is asking - thoughts?
--   --   Splash blocks Tom will add these today 6/17
--   --   Living Room Fan-Kate investigating
--   --   Coded lockbox 1010
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  11.21.2021    
-- -- Selections Sheet Signed (0)  11.21.2021    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  11.21.2021    
-- -- Deposit For Upgrades Received (0)  11.21.2021    
-- -- Building Permit (30) *       
    Level Three Quartz - Calacutta Classique ($1575 included in amendment)  
    Expanded Driveway ($1200 included in amendment)  
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       in process 1/6
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Settlement Agent Confirmed (0)  11.21.2021    
-- -- Framing I (9)       in process 1/20
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *        in process 2/10
-- -- Order Cabinets (0)      
    Upgraded Cabinetry Kitchen and Baths ($1000 included in amendment)  
-- -- Order Appliances (0)       SS with French Fridge
    French Model Fridge ($850 included in amendment)  
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *        Week of July 5?
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       In process 2/17
-- -- Plumbing Rough In (4)       In process 3/7
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       3/8
-- -- Exterior Vinyl (0) *        In process 5/15
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       BN Hinges
-- -- Drywall (Hang) (4) *        In process 3/17
-- -- Loan Approval (0)  11.21.2021    
-- -- Deed Preparation (0)  11.21.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Should be done 3/27-still appears to need final sanding 3/28
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)       Being built
-- -- Mailbox (0)  11.21.2021    
-- -- Cabinet Installation (2) *        Installing 4/7
-- -- Granite Installation (1) *        Scheduled for 4/29 or 4/30
-- -- Interior Trim - Install (3) *        Almost complete 4/11
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        On site 4/17
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (1)       Jill will take care of it
-- -- Deliver Plumbing / Lighting Fixtures (0)       Plumbing PO sent- Tom call for delivery- Lighting Ordered
    Upgraded Touch 20 kitchen faucet in BN ($250 included in amendment)  
    Additional ceiling fan in bedroom that backs up to stairwell ($150 included in amendment)  
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Ron waiting on a few final items to come in. Will install ASAP
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        In process 5/31
-- -- HVAC Trim Out (1) *        in process 5/19
-- -- Plumbing Trim Out (2) *        Starting ASAP Standard BN Plumbing; Touch 20 Kitchen Faucet
-- -- Install Appliances (0) *        Need stove 6/6
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Thurs, Jun 17 - Pattie Crawford
-- -- Inspection (Final Building) (2) *        Thurs, Jun 10
-- -- Pre Walk Through (0)       Jill and Courtney
-- -- Cleaning (1)       In process 6/6
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *       
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Request Trash Tote From POA Manager (0)      
-- -- Closing (1)       Monday, 6/21@ 9AM
-- -- Remove Coded Lockbox (0)