CONGERS - 10  ::  2832 Belgian Drive
[ BUILD: 20200001991 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
Cracked window Tom has the window
UPGRADES
---
CRITICAL PATH
Tue    Feb 3      Inspection (Concrete Wall) (1)      
Wed    Feb 4      Inspection (Conduit Under Slab) (1)      
    Inspection (Drain Tile) (0)      
    Verify Window & Roof Structure (0)      
    Patio (0)      
    Rough In Microwave Vent (0)      
Thu    Feb 5      Inspection (Rough In Plumbing) (1)      
Fri    Feb 6      Inspection (Rough In Electric) (1)      
Mon    Feb 9      Inspection (Framing) (1) *       
    Inspection (Deck Piers) (0)      
    Exterior Stone (0)      
    Set Electric Meter (0) *       
    Inspection (Main Water Line) (0)      
Tue    Feb 10      Interior Trim - Paint (1)      
    Ceiling Fans (0)      
Wed    Feb 11      Blower Door Test (1)      
    Inspection (Final HVAC) (0)      
    Inspection (Final Plumbing) (0)      
    Inspection (Final Electric) (0)      
Thu    Feb 12      Stain Hardwood Stairs (1) *       
TO DO - COMPLETED OR DELETED
Kate - Buyer Needs To Make Selections Hooray!
Missing kitchen wall cabinet
Siding ships May 5
Stair railing?
Cover countertops?
Trim installed at new window in bedroom
Large(ish) hole in hall bathtub Trim
Side splash on kitchen counter-for 103?
Please cover Carpet- KK -5/22
Trim piece needed on stairs 5/26
Snap lights in bedroom? Replace with flush mount light
Attic cover 5/26 Tom will tell Tim
Busted k cabinet Probably covered by microwave
Drywall patch kitchen Jill to talk to Tim
Snap light in bedroom 3
Water pipes in basement?
Vanity top in here In garage - Tom/Jill will remove
Lightbulbs needed Jill
Caulk MB tub Painters
Quite a bit of paint touch up Painters
MB closet shelving tweaks and half bath mirror needed 6/6
Silicone sink countertops Painters
Broken glass in garage door Ordered, picking up 6/15
Garage access over weekend? Buyer is asking - thoughts?
Splash blocks Tom will add these today 6/17
Living Room Fan-Kate investigating
Coded lockbox 1010
UPGRADES - COMPLETED
    Level Three Quartz - Calacutta Classique ($1575 included in amendment)  
    Upgraded Cabinetry Kitchen and Baths ($1000 included in amendment)  
    French Model Fridge ($850 included in amendment)  
    Upgraded Carpet and Pad on Stairs and Upstairs ($1100 included in amendment)  
    Upgraded Touch 20 kitchen faucet in BN ($250 included in amendment)  
    Additional ceiling fan in bedroom that backs up to stairwell ($150 included in amendment)  
    Expanded Driveway ($1200 included in amendment)  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  11.21.2021    
-- -- Selections Sheet Signed (0)  11.21.2021    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  11.21.2021    
-- -- Deposit For Upgrades Received (0)  11.21.2021    
-- -- Building Permit (30) *       
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       in process 1/6
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Settlement Agent Confirmed (0)  11.21.2021    
-- -- Framing I (9)       in process 1/20
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *        in process 2/10
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)       SS with French Fridge
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *        Week of July 5?
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       In process 2/17
-- -- Plumbing Rough In (4)       In process 3/7
-- -- Electric Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       3/8
-- -- Exterior Vinyl (0) *        In process 5/15
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)       BN Hinges
-- -- Drywall (Hang) (4) *        In process 3/17
-- -- Loan Approval (0)  11.21.2021    
-- -- Deed Preparation (0)  11.21.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Should be done 3/27-still appears to need final sanding 3/28
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)       Being built
-- -- Mailbox (0)  11.21.2021    
-- -- Cabinet Installation (2) *        Installing 4/7
-- -- Granite Installation (1) *        Scheduled for 4/29 or 4/30
-- -- Interior Trim - Install (3) *        Almost complete 4/11
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *        On site 4/17
-- -- Luxury Vinyl Tile (0)      
-- -- Paint 2 (3)      
-- -- Cover Floors (0)       Jill will take care of it
-- -- Deliver Plumbing / Lighting Fixtures (0)       Plumbing PO sent- Tom call for delivery- Lighting Ordered
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *        Ron waiting on a few final items to come in. Will install ASAP
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (1) *       
-- -- Electric Trim Out (3) *        In process 5/31
-- -- HVAC Trim Out (1) *        in process 5/19
-- -- Plumbing Trim Out (2) *        Starting ASAP Standard BN Plumbing; Touch 20 Kitchen Faucet
-- -- Install Appliances (0) *        Need stove 6/6
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Thurs, Jun 17 - Pattie Crawford
-- -- Inspection (Final Building) (4) *        Thurs, Jun 10
-- -- Pre Walk Through (0)       Jill and Courtney
-- -- Cleaning (1)       In process 6/6
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *       
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Request Trash Tote From POA Manager (0)      
-- -- Closing (1)       Monday, 6/21@ 9AM
-- -- Remove Coded Lockbox (0)