CONGERS - 25  ::  2910 Belgian Drive
[ BUILD: 20200002177 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Tue    Nov 4      Inspection (Concrete Wall) (1)      
Wed    Nov 5      Inspection (Conduit Under Slab) (1)      
Thu    Nov 6      Inspection (Drain Tile) (0)      
Thu    Nov 6      Verify Window & Roof Structure (0)      
Thu    Nov 6      Patio (0)      
Thu    Nov 6      Rough In Microwave Vent (0)      
Thu    Nov 6      Inspection (Rough In Plumbing) (1)      
Fri    Nov 7      Inspection (Rough In Electric) (1)      
Mon    Nov 10      Inspection (Framing) (1) *       
Tue    Nov 11      Inspection (Deck Piers) (0)      
Tue    Nov 11      Exterior Stone (0)      
Tue    Nov 11      Set Electric Meter (0) *       
Tue    Nov 11      Inspection (Main Water Line) (0)      
Tue    Nov 11      Order Plumbing / Lighting Fixtures (0)      
Tue    Nov 11      Interior Trim - Paint (1)      
Wed    Nov 12      Ceiling Fans (0)      
Wed    Nov 12      Blower Door Test (1)      
Thu    Nov 13      Inspection (Final HVAC) (1)      
Fri    Nov 14      Inspection (Final Plumbing) (1)      
Mon    Nov 17      Inspection (Final Electric) (1)      
Tue    Nov 18      Stain Hardwood Stairs (1) *       
--   --   Kitchen framing issue
--   --   Weird MB windows 5/31
--   --   MB drywall framing issue?
--   --   Drywall damage kitchen 7/18 In process of repairing 8/11
--   --   Drawer hardware
--   --   Drywall corner top level stairs
--   --   Junction powder bath
--   --   Dishwasher
--   --   Sod
--   --   CODED LOCKBOX 2525
--   --   Light bulb in wall sconce
--   --   Powder pedestal
--   --   Powder light and plate by front door needed
--   --   MB shelving finish installing Fri, 9/24
--   --   Plumber to hook up dishwasher/sink/pedestal
--   --   Finish staining steps
--   --   Kitchen faucet Arriving Mon, 9/20?
--   --   Install stove? 9/22
--   --   Shave MB closet door down
--   --   Screens
--   --   Final poly on steps?
--   --   Remove dishwasher in basement Tom, 9/27
--   --   Hall shower head patching Jill will tell painter
--   --   Electric receptacle needed but front door Jill
--   --   Getting CO Concerns
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  11.21.2021    
-- -- Selections Sheet Signed (0)  11.21.2021    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  11.21.2021    
-- -- Deposit For Upgrades Received (0)  11.21.2021    
-- -- Building Permit (30) *       
    French Model Fridge  
    Painted White Cabinetry  
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)       in process 1/16
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       in process 3/3
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Settlement Agent Confirmed (0)  11.21.2021    
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)       SS with French Fridge
-- -- Deck (0)      
-- -- Gutters (0)  09.01.2021    
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0) *   09.06.2021    
-- -- Sod / Seed / Landscaping (0)  09.07.2021    
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)       Almost complete 6/2
-- -- Electric Rough In (4)       In process 6/6
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)  09.06.2021    
-- -- Order Interior Doors & Trim (0)       BN hinges
-- -- Drywall (Hang) (4) *       
-- -- Loan Approval (0)  11.21.2021    
-- -- Deed Preparation (0)  11.21.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process 6/30
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)  09.15.2021     Mailbox
-- -- Mailbox (0)  11.21.2021    
-- -- Cabinet Installation (2) *        In process-need pulls 7/14
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        In process 8/4
-- -- Luxury Vinyl Plank (3) *   08.28.2021     In process 8/25
-- -- Luxury Vinyl Tile (0)  09.01.2021    
-- -- Paint 2 (3)  09.06.2021     In process 9/1
-- -- Cover Floors (1)  09.23.2021    
-- -- Deliver Plumbing / Lighting Fixtures (0)  09.07.2021     BN Plumbing and BN Lighting
-- -- Shoe Moulding (0)  09.06.2021    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   09.18.2021     Almost complete 9/18
-- -- Install Coded Lockbox (add extra keys) (0)  09.16.2021    
-- -- Pay Water / Sewer Taps (0)  09.07.2021    
-- -- Set Water Meter (0) *   09.07.2021    
-- -- Electric Trim Out (3) *   09.18.2021     All but powder bath light
-- -- HVAC Trim Out (1) *   09.15.2021    
-- -- Plumbing Trim Out (2) *   09.18.2021     BN Plumbing
-- -- Install Appliances (0) *   09.07.2021     SS with French
-- -- Paint 3 (2) *   09.06.2021    
-- -- Carpet (2)  09.23.2021     In process 9/22
-- -- Appraiser Confirms Construction Completion (0)  11.11.2021    
-- -- Inspection (Final Building) (2) *   09.23.2021     TBD
-- -- Pre Walk Through (0)  09.23.2021    
-- -- Cleaning (1)  09.29.2021     Just touch up after painters repairs
-- -- Certificate of Occupancy (1) *   09.30.2021    
-- -- C.O. to Lender (0)  09.30.2021    
-- -- Schedule Closing (0)  11.11.2021     Nov 9 at 12:30 PM
-- -- Buyer Walk Through (1) *   09.30.2021     Wed, 9/29 at 10AM
-- -- Payment for Upgrades (0)  11.23.2021     $1450
-- -- Keys to Settlement Agent (0)  10.07.2021    
-- -- Review Settlement Statement (0)  10.07.2021    
-- -- Jerry Signs Closing Documents (0)  11.11.2021    
-- -- Request Trash Tote From POA Manager (0)  09.27.2021    
-- -- Closing (1)  11.11.2021    
-- -- Remove Coded Lockbox (0)  11.12.2021