Leaking gutter seam above back deck |
Davenport |
|
-- |
-- |
Flooring issue in pantry - bulging |
Jill will look at it |
|
Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Needs front window (bedroom) |
|
|
-- |
-- |
Liners needed in all bathtubs |
|
|
-- |
-- |
Microwave vent needs framing (drywall covering it) 4/10 |
|
|
-- |
-- |
Pulls needed on up vanities 4/18 |
Just MB vanity now |
|
-- |
-- |
Flashing above front door looks odd |
|
|
-- |
-- |
|
|
|
-- |
-- |
Missing pull kitchen |
|
|
-- |
-- |
Back patio step needed? 5/18 |
|
|
-- |
-- |
CODED LOCKBOX 0130 |
|
|
-- |
-- |
MICROWAVE VENTED? |
Happy to confirm when electric is on 6/12 |
|
-- |
-- |
Powder baths need junction boxes |
|
|
-- |
-- |
Paint master bedroom door |
|
|
-- |
-- |
Kitchen blemish drywall repair 6/12 |
Painter |
|
-- |
-- |
Doorknob to master bed needed |
|
|
-- |
-- |
Living room snap light needed |
|
|
-- |
-- |
These steps needed stained as well |
|
|
-- |
-- |
Shower rod needed |
|
|
-- |
-- |
Electrical cover hall bath needed |
And laundry |
|
-- |
-- |
Front light needed |
And rear lights |
|
-- |
-- |
Powder fan needed |
And hall bath |
|
-- |
-- |
Paint tops and bottoms of doors |
Painter - July 8 |
|
-- |
-- |
Replace deck board with purple stain? |
Tom |
|
-- |
-- |
Cracked deck boards - replace? |
Tom. Court green-taped |
|
-- |
-- |
Put back insulation |
Jill |
|
-- |
-- |
Patch LR ceiling |
Drywaller |
|
-- |
-- |
Touch up paint needed |
Painter |
|
-- |
-- |
Laundry electrical cover needed |
Jill |
|
-- |
-- |
Put globes on powder bath after straightening fixture |
Jill |
|
-- |
-- |
Remove trash behind townhouse |
Jill |
|
-- |
-- |
Final clean |
Cleaner |
|
-- |
-- |
Drywall seam to be sanded over island and around pendant lights |
|
|
-- |
-- |
Plugs in French and front door |
Jill |
|
-- |
-- |
Lots of little drywall and paint issues in powder bathroom |
Painter |
|
-- |
-- |
Finish installing light in powder bathroom |
|
|
-- |
-- |
Small hole to be patched by stairs to the upper level |
Drywaller |
|
-- |
-- |
Sand drywall ceiling hall bath |
Drywaller |
|
-- |
-- |
Paint touch ups |
Painter |
|
-- |
-- |
Drywall repair at pendant light on kitchen ceiling |
Painter |
|
-- |
-- |
Repair living room ceiling near snap light |
Drywaller |
|
-- |
-- |
More screws needed for powder bath light switch |
Jill |
|
-- |
-- |
Paint tops of all doors |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Put globes on powder bathroom light |
|
|
-- |
-- |
Various Drywall issues and paint issues in front hall closet |
Drywall |
|
-- |
-- |
Fix wobbly ceiling fan in master bedroom |
Tom or electrician |
|
-- |
-- |
Adjust second and third bedroom closet doors |
|
|
-- |
-- |
Reattach basement insulation |
|
|
-- |
-- |
Install media cover in basement |
|
|
-- |
-- |
Many drywall issues throughout the home |
|
|
-- |
-- |
Final paint touch up |
Painter |
|
-- |
-- |
|
|
|
-- |
-- |
Trash can storage area |
need siding |
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.14.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.11.2022 |
1/4/2022: sent to Maggie for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.22.2022 |
1/21/2022: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.22.2022 |
|
|
-- |
-- |
Building Permit (30) 11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.11.2021 |
|
|
-- |
-- |
Stake Out Home (1) 11.08.2021 |
|
|
-- |
-- |
Excavate (2) 11.29.2021 |
|
|
-- |
-- |
Inspection (Footers) (1) 11.29.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 01.05.2023 |
|
|
-- |
-- |
Pour Footers (1) 11.29.2021 |
|
|
-- |
-- |
Set Forms (2) 12.06.2021 |
in process 12/1 |
|
-- |
-- |
Pour Foundation Walls (1) 12.09.2021 |
|
|
-- |
-- |
Plumb Slab (2) 12.13.2021 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 01.05.2023 |
|
|
-- |
-- |
Prepare Slab (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 01.05.2023 |
|
|
-- |
-- |
Pour Slab (1) * 12.20.2021 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.26.2022 |
|
|
-- |
-- |
Framing I (9) 01.03.2022 |
|
|
-- |
-- |
Order Steps (0) 12.20.2021 |
|
|
-- |
-- |
Order Tubs / Showers (0) 12.09.2021 |
|
|
-- |
-- |
Framing II (8) 01.17.2022 |
|
|
-- |
-- |
Framing III (8) * 02.03.2022 |
|
|
-- |
-- |
Install Stairs (0) 02.24.2022 |
|
|
-- |
-- |
Windows & Doors (0) 03.13.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.28.2022 |
|
|
-- |
-- |
Roofing (0) 02.17.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 02.24.2022 |
Standard |
|
-- |
-- |
Deck (0) 04.25.2022 |
In process 2-16 Expanded Deck 12 x 18 |
|
-- |
-- |
Gutters (0) 05.02.2022 |
|
|
-- |
-- |
Driveway (0) 06.18.2022 |
STANDARD - Fri, June 17 |
|
-- |
-- |
Patio (0) 01.05.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.25.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 06.29.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 02.24.2022 |
in process 2/16 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.24.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.21.2022 |
In process 3/12 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 01.05.2023 |
|
|
-- |
-- |
Electric Rough In (4) 03.17.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 01.05.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 01.05.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 01.05.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.18.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 03.30.2022 |
3/25 or 3/26 |
|
-- |
-- |
Inspection (Insulation) (1) 03.31.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.02.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 01.05.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 03.10.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.10.2022 |
|
|
-- |
-- |
Loan Approval (0) 06.30.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.18.2022 |
In process 4/10 |
|
-- |
-- |
Paint 1 (1) 04.20.2022 |
|
|
-- |
-- |
Garage Door (0) 04.04.2022 |
|
|
-- |
-- |
House Numbers (0) 06.29.2022 |
|
|
-- |
-- |
Mailbox (0) 07.03.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.18.2022 |
4/14 |
|
-- |
-- |
Granite Installation (1) * 05.07.2022 |
5/6 |
|
-- |
-- |
Interior Trim - Install (3) 05.07.2022 |
Needs painting 4/27 |
|
-- |
-- |
Interior Trim - Paint (1) 01.05.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.26.2022 |
In process 5/25 |
|
-- |
-- |
Luxury Vinyl Tile (0) 05.25.2022 |
In process 5/21 |
|
-- |
-- |
Paint 2 (3) 05.30.2022 |
|
|
-- |
-- |
Cover Floors (1) 06.01.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 05.26.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 06.05.2022 |
In process 6/1 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 06.05.2022 |
Brushed Nickel accessories. In process 6/1 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.08.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 06.09.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 06.18.2022 |
Few items need completion 6/15 |
|
-- |
-- |
Ceiling Fans (0) 06.08.2022 |
Living Room |
|
-- |
-- |
HVAC Trim Out (1) 06.15.2022 |
Furnace set 6/1 |
|
-- |
-- |
Plumbing Trim Out (2) 06.05.2022 |
Brushed Nickel Standard. In process 6/1 |
|
-- |
-- |
Install Appliances (0) * 06.08.2022 |
|
|
-- |
-- |
Paint 3 (2) * 05.30.2022 |
|
|
-- |
-- |
Carpet (2) 05.26.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 07.05.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 01.05.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 01.05.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 01.05.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.29.2022 |
Wed, Jun 29 |
|
-- |
-- |
Pre Walk Through (0) 07.03.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.29.2022 |
|
|
-- |
-- |
Cleaning (1) 07.06.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 06.30.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 06.30.2022 |
|
|
-- |
-- |
Schedule Closing (0) 07.07.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 07.07.2022 |
|
|
-- |
-- |
Payment for Upgrades (0) 06.30.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.28.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 07.08.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.30.2022 |
Wednesday, June 29, 1:00 PM |
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.28.2022 |
|
|
-- |
-- |
Closing (1) 07.08.2022 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 07.27.2022 |
|
|