Kitchen corner cabinet door |
|
|
-- |
-- |
Caulk kitchen corner cabinet |
|
|
-- |
-- |
Patch master bathroom bath tub |
Waiting on new repair material |
|
-- |
-- |
Sand and paint kitchen window trim |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
TWO MASTER SUITES |
See floor plans |
|
-- |
-- |
Country Beige-GOLD DOOR |
|
|
-- |
-- |
Is basement finished? Framing and electric are in??? |
|
|
-- |
-- |
Mold on green board (more than normal-pic) |
|
|
-- |
-- |
Are the walls and plumbing in the right spot in the basement? |
See pics 4/14 |
|
-- |
-- |
Water leak at back right corner of basement? |
Damp all along back edge/corners |
|
-- |
-- |
No 2 nd door leading to 2nd master suite. Correct? |
|
|
-- |
-- |
Crown molding needed 5/19 |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Bathroom cabinets |
Toe kick-still missing 6/22 |
|
-- |
-- |
Kate update buyer in timing after Thursday ops meeting |
|
|
-- |
-- |
Drywall repair master bath |
Joe Meally- TOM TO COMMUNCIATE |
|
-- |
-- |
Basement dripping water from wall into puddle, see pic 7/3 |
|
|
-- |
-- |
CODED LOCKBOX 6666 |
|
|
-- |
-- |
Install upper 9 inch cabinet door Kitchen |
Kyle Litten Monday/Tuesday July 6-7 |
|
-- |
-- |
Install ceiling fan |
|
|
-- |
-- |
Install handrail |
JB |
|
-- |
-- |
Caulk in front of all tubs and showers |
JB |
|
-- |
-- |
Paint touch up laundry room |
Maher |
|
-- |
-- |
Adjust cabinet doors in master bath. First cabinet doors to be adjusted |
Kyle Litten Monday/Tuesday July 6-7 |
|
-- |
-- |
Drywall patch right side vanity light in master bathroom |
Joe Meally- TOM TO COMMUNCIATE |
|
-- |
-- |
Master bath shower floor drain needed |
Tom |
|
-- |
-- |
Install dining chandelier |
Harry- to arrive Tuesday/Wednesday |
|
-- |
-- |
PVC board underneath patio door |
JB |
|
-- |
-- |
Kate update buyer on timing beginning of the week |
|
|
-- |
-- |
Add screw covers to patio doors |
JB or painter |
|
-- |
-- |
Install screens |
JBj patio door 7/29 |
|
-- |
-- |
Tighten up for switch receptacle in kitchen |
JB |
|
-- |
-- |
Install shoe in front of patio door |
JB |
|
-- |
-- |
Install low-voltage covers |
Tom/Harry? |
|
-- |
-- |
Caulk toilet and pedestal sink |
All but half bath |
|
-- |
-- |
Clean up back yard (7/7) |
Tom/JB |
|
-- |
-- |
Drain spout outside 7/7 |
Tom/JB |
|
-- |
-- |
Island cabinet door wont shut |
|
|
-- |
-- |
Touch up paint throughout |
|
|
-- |
-- |
Insulation in basement |
|
|
-- |
-- |
MB light issue 7/20 |
|
|
-- |
-- |
MB closet fix shelf |
|
|
-- |
-- |
Tub repair |
|
|
-- |
-- |
Fan in master bathroom |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
Kate will check with Kimberly |
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Soon as of Mar 14 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Mon, Apr 8 |
|
-- |
-- |
Plumbing Rough In (4) |
Starting soon as of Apr 1 |
|
-- |
-- |
Electric Rough In (4) |
|
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Tues, Apr 9 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Starting Apr 15 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Should be done Monday |
|
-- |
-- |
Paint 1 (1) |
Ready for paint on April 30 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
Only Mailbox needed- Tom to set this week. |
|
-- |
-- |
Cabinet Installation (2) * |
|
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
Starting May 13 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
Waiting on some lighting fixtures |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Started as of May 13 |
|
-- |
-- |
Paint 2 (3) |
In process 5/22 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
On site |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
finishing week of 7/1 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
ASAP |
|
-- |
-- |
Set Water Meter (0) |
Hopefully by Tuesday 7/9 |
|
-- |
-- |
Electric Trim Out (3) |
All but dining chandelier & closet lights in bedrooms |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
Waiting on plumber |
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
|
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
July 25 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Completed by Tom |
|
-- |
-- |
Payment for Upgrades (0) |
$1,800 |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
West View Title - Anna |
|
-- |
-- |
Closing (1) |
This week of 7/29 |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|