- 63  ::  2241 Deyerle Avenue
[ BUILD: 1903-0039 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Wed    Nov 27      Ratified Contract? (0)      
Wed    Nov 27      $2500 Deposit Received (0)      
Wed    Nov 27      Association Packet Requested (0)      
Wed    Nov 27      Association Packet Received (0)      
Wed    Nov 27      Selections Meeting (0)      
Wed    Nov 27      Selections Sheet Signed (0)      
Wed    Nov 27      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    Nov 27      Deposit For Upgrades Received (0)      
Wed    Nov 27      Inspection (Concrete Wall) (1)      
Thu    Nov 28      Inspection (Conduit Under Slab) (1)      
Fri    Nov 29      Inspection (Drain Tile) (0)      
Fri    Nov 29      Settlement Agent Confirmed (0)      
Fri    Nov 29      Verify Window & Roof Structure (0)      
Fri    Nov 29      Patio (0)      
Fri    Nov 29      Rough In Microwave Vent (0)      
Fri    Nov 29      Inspection (Rough In Plumbing) (1)      
Mon    Dec 2      Inspection (Rough In Electric) (1)      
Tue    Dec 3      Inspection (Deck Piers) (0)      
Tue    Dec 3      Inspection (Framing) (1)      
Wed    Dec 4      Exterior Stone (0)      
Wed    Dec 4      Set Electric Meter (0)      
Wed    Dec 4      Inspection (Main Water Line) (0)      
Wed    Dec 4      Loan Approval (0)      
Wed    Dec 4      Deed Preparation (0)      
Wed    Dec 4      Mailbox (0)      
Wed    Dec 4      Interior Trim - Paint (1)      
Thu    Dec 5      Ceiling Fans (0)      
Thu    Dec 5      Blower Door Test (1)      
Fri    Dec 6      Inspection (Final HVAC) (1)      
Mon    Dec 9      Inspection (Final Plumbing) (1)      
Tue    Dec 10      Inspection (Final Electric) (1)      
Wed    Dec 11      Stain Hardwood Stairs (1)      
Thu    Dec 12      Request Trash Tote From POA Manager (0)      
--   --   Charleston brick, ivory vinyl, red front door
--   --   Charleston Breck, country beige vinyl, red front door
--   --   Charleston brick, country beige vinyl, red front door
--   --   Buyer selected fantasy brown granite from Fenco 6/25/19
--   --   Not 2 master suite layout 8/3
--   --   Basement window needed
--   --   Townes 60 cabinets are in living room
--   --   Broken cabinet? 11/6. On floor in kitchen. Cabinet in. Kyle installing over 12/4 -12/5/not installed 12/7
--   --   Cabinet hardware needed 11/13 Called Kimberly. On order 12/12
--   --   CODED LOCKBOX 6363 Missing 1/19?
--   --   Counters needed for all baths 11/23
--   --   Attic cover needed 11/23 JB
--   --   Cover countertops 11/23
--   --   dent in fridge-Court has contacted Kate 12/1 Leslie says on order 12/19
--   --   Front porch light needed 12/7
--   --   Window screens need to be put in
--   --   Touch up paint needed upstairs
--   --   Second coat and touch up paint whole house
--   --   Needs outdoor light on porch 12/11
--   --   Handrails need installed 12/11
--   --   Need vanity mirrors throughout 12/11 Ron
--   --   Stain steps Isaac
--   --   Bathroom handle missing 12/15 Lots of door handles still need installing - Ron
--   --   Door holes need filled 12/15 Plugs on patio door - JB
--   --   Stair railings need sanding/repainting 12/15 Isaac
--   --   Install basement sliding door screen 12/15
--   --   Sliding doors need screens installed (on site) 12/15 JB
--   --   Missing HVAC covers 12/15’ Several missing floor registers
--   --  
--   --   Buyer Potential he has a deep freezer for pantry. Possibly removing a couple of bottom shelves and adding an electrical receptacle. Buyer will let me know
--   --   Will j in natal faucet as soon as it comes in
--   --   Upgraded faucet to be installed once come in
--   --   Add hardware to pull out trashcan and adjust for easier opening and closing
--   --   Let down pendant lights and chandelier in kitchen
--   --   Paint overspray upstairs hall bathroom Kelly 1/9 to 1/10
--   --   Missing tub drain overflow on upstairs hall tub Bobby
--   --   Reset hall bath toilet for better fit Kate to tell buyer no changes to be made
--   --   Install shelf and upper corner cabinet in kitchen install shelves in lower corner cabinet next to range
--   --   Check seal in up master bathroom Window seal
--   --   Final paint touch up Dec 30
--   --   Final clean Kelly
--   --   Water leaking from refrigerator causing paint to bubble Bobby to check on this
--   --   Missing refrigerator To arrive Jan 10 or Jan 14
--   --   Add plug in pantry Received quote. Contacting Buyer
--   --   Painting waiting to hear back from Twila Issac
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)       Framed 9/25
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)       In process 9/14
-- -- Electric Rough In (4)       In process 9/14
-- -- Exterior Vinyl (0) *        In process 9/18
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Sanding 10/24
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        90% installed
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)       Started 11/3
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Joe is aware
-- -- Paint 2 (3)       Started 11/20-in process 11/23
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)       On site 11/20
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Needs lots of shelving installed 12/7/ & door knobs
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)      
-- -- Electric Trim Out (3)       Mostly complete 12/11
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Complete except hall bath/shower and kitchen faucet 12/15/shower door on site 12/18
-- -- Install Appliances (0) *       
-- -- Paint 3 (2) *        Need painters 12/18
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)       Joe Chadwell
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Fri, Dec 27 at 11AM
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       Sara at West View Title
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)