ADDR
- 63  ::  2241 Deyerle Avenue
[ BUILD: 1903-0039 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Tue    Dec 16      Ratified Contract? (0)      
Tue    Dec 16      $2500 Deposit Received (0)      
Tue    Dec 16      Association Packet Requested (0)      
Tue    Dec 16      Association Packet Received (0)      
Tue    Dec 16      Selections Meeting (0)      
Tue    Dec 16      Selections Sheet Signed (0)      
Tue    Dec 16      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Dec 16      Deposit For Upgrades Received (0)      
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Settlement Agent Confirmed (0)      
Thu    Dec 18      Verify Window & Roof Structure (0)      
Thu    Dec 18      Patio (0)      
Thu    Dec 18      Rough In Microwave Vent (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Exterior Stone (0)      
Tue    Dec 23      Set Electric Meter (0) *       
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Loan Approval (0)      
Tue    Dec 23      Deed Preparation (0)      
Tue    Dec 23      Mailbox (0)      
Tue    Dec 23      Interior Trim - Paint (1)      
Wed    Dec 24      Ceiling Fans (0)      
Wed    Dec 24      Blower Door Test (1)      
Thu    Dec 25      Inspection (Final HVAC) (1)      
Fri    Dec 26      Inspection (Final Plumbing) (1)      
Mon    Dec 29      Inspection (Final Electric) (1)      
Tue    Dec 30      Stain Hardwood Stairs (1) *       
Wed    Dec 31      Request Trash Tote From POA Manager (0)      
--   --   Charleston brick, ivory vinyl, red front door
--   --   Charleston Breck, country beige vinyl, red front door
--   --   Charleston brick, country beige vinyl, red front door
--   --   Buyer selected fantasy brown granite from Fenco 6/25/19
--   --   Not 2 master suite layout 8/3
--   --   Basement window needed
--   --   Townes 60 cabinets are in living room
--   --   Broken cabinet? 11/6. On floor in kitchen. Cabinet in. Kyle installing over 12/4 -12/5/not installed 12/7
--   --   Cabinet hardware needed 11/13 Called Kimberly. On order 12/12
--   --   CODED LOCKBOX 6363 Missing 1/19?
--   --   Counters needed for all baths 11/23
--   --   Attic cover needed 11/23 JB
--   --   Cover countertops 11/23
--   --   dent in fridge-Court has contacted Kate 12/1 Leslie says on order 12/19
--   --   Front porch light needed 12/7
--   --   Window screens need to be put in
--   --   Touch up paint needed upstairs
--   --   Second coat and touch up paint whole house
--   --   Needs outdoor light on porch 12/11
--   --   Handrails need installed 12/11
--   --   Need vanity mirrors throughout 12/11 Ron
--   --   Stain steps Isaac
--   --   Bathroom handle missing 12/15 Lots of door handles still need installing - Ron
--   --   Door holes need filled 12/15 Plugs on patio door - JB
--   --   Stair railings need sanding/repainting 12/15 Isaac
--   --   Install basement sliding door screen 12/15
--   --   Sliding doors need screens installed (on site) 12/15 JB
--   --   Missing HVAC covers 12/15’ Several missing floor registers
--   --  
--   --   Buyer Potential he has a deep freezer for pantry. Possibly removing a couple of bottom shelves and adding an electrical receptacle. Buyer will let me know
--   --   Will j in natal faucet as soon as it comes in
--   --   Upgraded faucet to be installed once come in
--   --   Add hardware to pull out trashcan and adjust for easier opening and closing
--   --   Let down pendant lights and chandelier in kitchen
--   --   Paint overspray upstairs hall bathroom Kelly 1/9 to 1/10
--   --   Missing tub drain overflow on upstairs hall tub Bobby
--   --   Reset hall bath toilet for better fit Kate to tell buyer no changes to be made
--   --   Install shelf and upper corner cabinet in kitchen install shelves in lower corner cabinet next to range
--   --   Check seal in up master bathroom Window seal
--   --   Final paint touch up Dec 30
--   --   Final clean Kelly
--   --   Water leaking from refrigerator causing paint to bubble Bobby to check on this
--   --   Missing refrigerator To arrive Jan 10 or Jan 14
--   --   Add plug in pantry Received quote. Contacting Buyer
--   --   Painting waiting to hear back from Twila Issac
-- -- Building Permit (30) *       
    Missing HDMI elevated receptacle in upstairs bedroom  
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
    Additional window on the back wall of basement  
-- -- Order Steps (0)      
    Hardwood treads from main level to bedroom level  
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
    Two Master Suite Layout  
    Full finished basement with full bathroom  
    Add closet Basement Bonus Room  
-- -- Install Stairs (0) *       
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Order Appliances (0)      
-- -- Deck (0)      
    Expanded 12 x 18 Pressure Treated Deck  
-- -- Gutters (0)      
-- -- Driveway (0) *        Framed 9/25
-- -- Privacy Divider / Fence (0) *       
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)       In process 9/14
-- -- Electric Rough In (4)       In process 9/14
    Under Cabinet Lights  
    Elevated Electrical Receptacle and HDMI Conduit in four locations (master BR, Bonus Room and FR in basement, Living Room)  
-- -- Inspection (Rough In HVAC) (1)      
-- -- Exterior Vinyl (0) *        In process 9/18
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        Sanding 10/24
-- -- Paint 1 (1)      
-- -- Garage Door (0)      
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        90% installed
    Lower Lazy Susan  
    Double Waste Basket in Island  
    Upgraded Dalton Cocoa or Gray Cabinetry in Bathrooms  
    Hampton kitchen cabinets  
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3) *        Started 11/3
    Crown Molding on Main Level  
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Joe is aware
    12x24 ceramic Tile in all locations  
-- -- Paint 2 (3)       Started 11/20-in process 11/23
    Eggshell Paint  
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
    Elongated Comfort Height Toilets (4)  
-- -- Shoe Moulding (0)       On site 11/20
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        Needs lots of shelving installed 12/7/ & door knobs
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3) *        Mostly complete 12/11
    Credit for contract upgrade of elevated HDMI receptacle  
-- -- HVAC Trim Out (1) *       
-- -- Plumbing Trim Out (2) *        Complete except hall bath/shower and kitchen faucet 12/15/shower door on site 12/18
    Master Bathroom Shower Door ($1300 contract)  
    Kitchen Faucet- Peerless- P7919LFSS  
    Curved Shower Rod Upstairs Hall Bathroom  
-- -- Install Appliances (0) *       
    Whirlpool Stainless Steel Kitchen Appliances  
    French Door Style Refrigerator  
-- -- Paint 3 (2) *        Need painters 12/18
-- -- Carpet (2)      
    Upgraded carpet padding on upper level (8lb)  
-- -- Appraiser Confirms Construction Completion (0)       Joe Chadwell
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1) *        Fri, Dec 27 at 11AM
-- -- Payment for Upgrades (0)      
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)       Sara at West View Title
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)