Replace drawer front |
|
|
-- |
-- |
Sandra cell 540-908-6882 |
|
|
Thu |
Nov 28 |
Ratified Contract? (0) |
|
|
Thu |
Nov 28 |
$2500 Deposit Received (0) |
|
|
Thu |
Nov 28 |
Association Packet Requested (0) |
|
|
Thu |
Nov 28 |
Association Packet Received (0) |
|
|
Thu |
Nov 28 |
Selections Meeting (0) |
|
|
Thu |
Nov 28 |
Selections Sheet Signed (0) |
|
|
Thu |
Nov 28 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Thu |
Nov 28 |
Deposit For Upgrades Received (0) |
|
|
Thu |
Nov 28 |
Inspection (Concrete Wall) (1) |
|
|
Fri |
Nov 29 |
Inspection (Conduit Under Slab) (1) |
|
|
Mon |
Dec 2 |
Inspection (Drain Tile) (0) |
|
|
Mon |
Dec 2 |
Settlement Agent Confirmed (0) |
|
|
Mon |
Dec 2 |
Verify Window & Roof Structure (0) |
|
|
Mon |
Dec 2 |
Order Appliances (0) |
|
|
Mon |
Dec 2 |
Patio (0) |
|
|
Mon |
Dec 2 |
Rough In Microwave Vent (0) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Plumbing) (1) |
|
|
Tue |
Dec 3 |
Inspection (Rough In Electric) (1) |
|
|
Wed |
Dec 4 |
Inspection (Deck Piers) (0) |
|
|
Wed |
Dec 4 |
Inspection (Framing) (1) |
|
|
Thu |
Dec 5 |
Exterior Stone (0) |
|
|
Thu |
Dec 5 |
Set Electric Meter (0) |
|
|
Thu |
Dec 5 |
Inspection (Main Water Line) (0) |
|
|
Thu |
Dec 5 |
Loan Approval (0) |
|
|
Thu |
Dec 5 |
Deed Preparation (0) |
|
|
Thu |
Dec 5 |
Mailbox (0) |
|
|
Thu |
Dec 5 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Interior Trim - Paint (1) |
|
|
Fri |
Dec 6 |
Ceiling Fans (0) |
|
|
Fri |
Dec 6 |
Blower Door Test (1) |
|
|
Mon |
Dec 9 |
Inspection (Final HVAC) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Plumbing) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Electric) (1) |
|
|
Thu |
Dec 12 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Dec 13 |
Schedule Closing (0) |
|
|
Fri |
Dec 13 |
Keys to Settlement Agent (0) |
|
|
Fri |
Dec 13 |
Review Settlement Statement (0) |
|
|
Fri |
Dec 13 |
Jerry Signs Closing Documents (0) |
|
|
Fri |
Dec 13 |
Request Trash Tote From POA Manager (0) |
|
|
Fri |
Dec 13 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Re-key mailbox and give keys to Scott |
Tom |
|
-- |
-- |
Hardwood Treads to 2nd Level |
|
|
-- |
-- |
Finish drywall at front door |
Still not complete |
|
-- |
-- |
Buyer to follow up with Kara for washer and dryer options |
|
|
-- |
-- |
RED FRONT DOOR |
Door is Gold as of October 13 |
|
-- |
-- |
Missing drawer hardware |
|
|
-- |
-- |
Pour front steps |
Osbaldo |
|
-- |
-- |
Cover appliances |
|
|
-- |
-- |
Rate Lock Expires March 30 |
|
|
-- |
-- |
Need transitions between laundry and hardwood floor in upstairs hallway |
Eric - Tues, Mar 20 |
|
-- |
-- |
Finish carpet and transition strips between hardwood and carpet in upstairs |
Eric - Tues, Mar 20 |
|
-- |
-- |
Electrical- outlet covers |
After paint 3 |
|
-- |
-- |
Install kitchen plumbing fixtures |
Before final inspection |
|
-- |
-- |
Handrail to basement |
Before final inspection |
|
-- |
-- |
Continue hardwood to top of steps to basement |
Eric |
|
-- |
-- |
Stairs |
Second coat of poly and painting of risers 3/21 |
|
-- |
-- |
Trim piece Missing on stairs |
|
|
-- |
-- |
CODED LOCKBOX - 8865 |
|
|
-- |
-- |
Sandra cell 540-908-6882 |
|
|
-- |
-- |
$600 from Ronald for appliance upgrade |
|
|
-- |
-- |
Repair burn marks in master shower floor |
|
|
-- |
-- |
Paint touch ups throughout and caulk |
|
|
-- |
-- |
Adjust screen door |
|
|
-- |
-- |
Pushback range |
|
|
-- |
-- |
Missing pin on downstairs closet door |
|
|
-- |
-- |
Replace front door weatherstripping |
|
|
-- |
-- |
Install window screens |
|
|
-- |
-- |
Transition strip at patio doors |
Eric |
|
-- |
-- |
Repair or replace hardwood boards for the gashes and and at bottom of stairs |
Eric to set up directly |
|
-- |
-- |
Missing receptacle cover upstairs bedroom |
|
|
-- |
-- |
Replace and cut trim at laundry room door |
|
|
-- |
-- |
Put cover on master closet fluorescent light |
|
|
-- |
-- |
Master shower discoloration repair |
|
|
-- |
-- |
Adjust doors on upstairs bedroom closet doors |
|
|
-- |
-- |
Finish trim edge of the island |
|
|
-- |
-- |
Leak under kitchen sink |
Osbaldo |
|
-- |
-- |
Latch on screen door |
Osbaldo |
|
-- |
-- |
Adjust pressure reducing valve |
Mindy |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
Tom to talk to Pettit about landscape planting |
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Wed, Dec 20 |
|
-- |
-- |
Plumbing Rough In (4) |
Done by Tues, Dec 19 |
|
-- |
-- |
Electric Rough In (4) |
Harry to start on that on Wed, Dec 13 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) |
Thu, Dec 21 |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Starting hanging Jan 2 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs sanding |
|
-- |
-- |
Paint 1 (1) |
Friday 1/19 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
In process |
|
-- |
-- |
Granite Installation (1) * |
Schedule TBD |
|
-- |
-- |
Interior Trim - Install (3) |
In process complete by Monday |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
Grouting on Monday |
|
-- |
-- |
Paint 2 (3) |
After 86. Hopefully 2/16 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Not started as of Mon, Mar 12 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Just about done |
|
-- |
-- |
HVAC Trim Out (1) |
Might be done? |
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
Wed, Mar 7 |
|
-- |
-- |
Paint 3 (2) * |
Thu, Mar 15 |
|
-- |
-- |
Carpet (2) |
Reuse from Glen 54 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Fri, Mar 16 |
|
-- |
-- |
Pre Walk Through (0) |
After steps are finished |
|
-- |
-- |
Cleaning (1) |
Mon, Mar 26 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Mon, Mar 26 at 3:30 PM |
|
-- |
-- |
Payment for Upgrades (0) |
$589 |
|
-- |
-- |
Closing (1) |
|
|