CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Test Ned will do this
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Building Permit (30)       Fred will do this
Tue    Jun 10      Order Roof & Floor Trusses (1)       mindy will do this
Wed    Jun 11      Order Windows & Doors (0)       Tom will do this
Wed    Jun 11      Stake Out Home (1)      
Thu    Jun 12      Excavate (2)      
Mon    Jun 16      Inspection (Footers) (1)       test
Tue    Jun 17      Inspection (Concrete Wall) (1)      
Wed    Jun 18      Pour Footers (1) *       
Thu    Jun 19      Set Forms (2)      
Mon    Jun 23      Pour Foundation Walls (1)       test
Tue    Jun 24      Plumb Slab (2)      
Thu    Jun 26      Inspection (Conduit Under Slab) (1)      
Fri    Jun 27      Prepare Slab (1)      
Mon    Jun 30      Inspection (Slab) (1)       test
Tue    Jul 1      Inspection (Drain Tile) (0)      
Tue    Jul 1      Pour Slab (1) *       
Wed    Jul 2      Settlement Agent Confirmed (0)      
Wed    Jul 2      Order Tubs / Showers (0)      
Wed    Jul 2      Framing II (8)      
Mon    Jul 14      Framing III (8) *       
Thu    Jul 24      Verify Window & Roof Structure (0)      
Thu    Jul 24      Install Stairs (0)      
Thu    Jul 24      Windows & Doors (0) *        test
Thu    Jul 24      House Number and Status in Window (0)      
Thu    Jul 24      Roofing (0) *       
Thu    Jul 24      Order Cabinets (0)      
Thu    Jul 24      Order Appliances (0)      
Thu    Jul 24      Gutters (0)      
Thu    Jul 24      Driveway (0) *       
Thu    Jul 24      Patio (0)      
Thu    Jul 24      Privacy Divider / Fence (0)      
Thu    Jul 24      Sod / Seed / Landscaping (0)      
Thu    Jul 24      Inspection (Rough In HVAC) (1)      
Fri    Jul 25      Rough In Microwave Vent (0)      
Fri    Jul 25      Inspection (Rough In Plumbing) (1)      
Mon    Jul 28      Electric Rough In (4)      
Fri    Aug 1      Inspection (Rough In Electric) (1)      
Mon    Aug 4      Inspection (Deck Piers) (0)      
Mon    Aug 4      Inspection (Framing) (1) *       
Tue    Aug 5      Exterior Vinyl (0) *       
Tue    Aug 5      Exterior Stone (0)      
Tue    Aug 5      Insulation (2) *       
Thu    Aug 7      Inspection (Insulation) (1)      
Fri    Aug 8      Inspection (Electric Service) (0)      
Fri    Aug 8      Set Electric Meter (0) *       
Fri    Aug 8      Inspection (Main Sewer Line) (0)      
Fri    Aug 8      Inspection (Main Water Line) (0)      
Fri    Aug 8      Order Interior Doors & Trim (0)      
Fri    Aug 8      Drywall (Hang) (4) *       
Thu    Aug 14      Loan Approval (0)      
Thu    Aug 14      Deed Preparation (0)      
Thu    Aug 14      Drywall (Tape, Block, Skim, Sand) (6) *       
Fri    Aug 22      Paint 1 (1)      
Mon    Aug 25      Garage Door (0) *       
Mon    Aug 25      House Numbers (0)      
Mon    Aug 25      Mailbox (0)      
Mon    Aug 25      Cabinet Installation (2) *       
Wed    Aug 27      Granite Installation (1) *       
Thu    Aug 28      Interior Trim - Install (3) *       
Tue    Sep 2      Order Plumbing / Lighting Fixtures (0)      
Tue    Sep 2      Interior Trim - Paint (1)      
Wed    Sep 3      Luxury Vinyl Plank (3) *       
Mon    Sep 8      Luxury Vinyl Tile (0)      
Mon    Sep 8      Paint 2 (3)      
Thu    Sep 11      Cover Floors (1)      
Fri    Sep 12      Deliver Plumbing / Lighting Fixtures (0)      
Fri    Sep 12      Shoe Moulding (0)      
Fri    Sep 12      Shelving, Door Knobs, Fire Extinguisher (0) *       
Fri    Sep 12      Install Coded Lockbox (add extra keys) (0)      
Fri    Sep 12      Pay Water / Sewer Taps (0)      
Fri    Sep 12      Set Water Meter (0) *       
Fri    Sep 12      Electric Trim Out (3)      
Wed    Sep 17      Ceiling Fans (0)      
Wed    Sep 17      HVAC Trim Out (1)      
Thu    Sep 18      Blower Door Test (1)      
Fri    Sep 19      Plumbing Trim Out (2)      
Tue    Sep 23      Install Appliances (0) *       
Tue    Sep 23      Paint 3 (2) *       
Thu    Sep 25      Carpet (2)      
Mon    Sep 29      Appraiser Confirms Construction Completion (0)      
Mon    Sep 29      Inspection (Final HVAC) (1)      
Tue    Sep 30      Inspection (Final Plumbing) (1)      
Wed    Oct 1      Inspection (Final Electric) (1)      
Thu    Oct 2      Pre Walk Through (0)      
Thu    Oct 2      Stain Hardwood Stairs (1)      
Fri    Oct 3      Cleaning (1)      
Mon    Oct 6      Certificate of Occupancy (1) *       
Tue    Oct 7      C.O. to Lender (0)      
Tue    Oct 7      Schedule Closing (0)      
Tue    Oct 7      Buyer Walk Through (1)      
Wed    Oct 8      Payment for Upgrades (0)      
Wed    Oct 8      Keys to Settlement Agent (0)      
Wed    Oct 8      Review Settlement Statement (0)      
Wed    Oct 8      Jerry Signs Closing Documents (0)      
Wed    Oct 8      Request Trash Tote From POA Manager (0)      
Wed    Oct 8      Closing (1)      
Thu    Oct 9      Remove Coded Lockbox (0)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Deck (0)      
-- -- HVAC Rough In (4)      
-- -- Plumbing Rough In (4)      
-- -- Inspection (Final Building) (2) *