ADDR
- 127  :: 
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Fri    Sep 20      Inspection (Footers) (1)       test
Mon    Sep 23      Inspection (Concrete Wall) (1)      
Tue    Sep 24      Inspection (Conduit Under Slab) (1)      
Wed    Sep 25      Inspection (Slab) (1)       test
Thu    Sep 26      Inspection (Drain Tile) (0)      
Thu    Sep 26      Inspection (Rough In HVAC) (1)      
Fri    Sep 27      Inspection (Rough In Plumbing) (1)      
Mon    Sep 30      Inspection (Rough In Electric) (1)      
Tue    Oct 1      Inspection (Deck Piers) (0)      
Tue    Oct 1      Inspection (Framing) (1)      
Wed    Oct 2      Inspection (Insulation) (1)      
Thu    Oct 3      Inspection (Electric Service) (0)      
Thu    Oct 3      Inspection (Main Sewer Line) (0)      
Thu    Oct 3      Inspection (Main Water Line) (0)      
Thu    Oct 3      Inspection (Final HVAC) (1)      
Fri    Oct 4      Inspection (Final Plumbing) (1)      
Mon    Oct 7      Inspection (Final Electric) (1)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Inspection (Final Building) (2)